Reimagining the BQE Policy Options to Reduce Traffic on the Brooklyn-Queens Expressway

Reimagining the BQE Policy Options to Reduce Traffic on the Brooklyn-Queens Expressway

Reimagining the BQE Policy Options to Reduce Traffic on the Brooklyn-Queens Expressway April 2019 1 Reimagining the BQE | April 2019 Contents Introduction and Summary of Findings 3 Key findings and recommendations 4 What this report is and what it is not 4 Summary of NYC DOT project 5 History 5 Current status 6 NYC DOT project parameters 6 Examples from Other Urban Highways 7 Cities are transforming urban highways 9 Traffic Estimates for Five Policy Options 10 Existing traffic and lane requirements 10 Policy scenarios 11 Conclusions 15 Acknowledgements This report was produced by: Christopher Jones, Senior Vice President and Chief Planner, RPA Kate Slevin, Senior Vice President, of State Programs and Advocacy, RPA Rachel Weinberger, Weinberger & Associates Graphics and Layout: Dave Zackin, Graphic Designer, RPA Special Thanks: While the content and accuracy of this report is strictly the responsibility of RPA, we wish to thank Hilary Jager, Laura Winner and Sabrina Gleizer of A Better Way, Charles Komanoff, and NYC Department of Transportation staff for providing us with data and other feedback. Tom Wright and Jeff Zupan of RPA also provided input for the report. photo: Eric Pasqualli photo: RPA Introduction and Summary of Findings This report seeks to expand the list 150,000 vehicles that use the highway today. NYC DOT has of realistic alternatives for restoring the presented two preliminary construction staging concepts so far: a temporary six-lane highway over the Brooklyn Heights Prom- Brooklyn-Queens Expressway (BQE) as a enade or a bi-level temporary highway combined with rolling safe, efficient corridor for moving people lane-by-lane closures. and goods, one that serves both citywide Regional Plan Association has a long history with the BQE. In and neighborhood residents and businesses. the 1920s and 1930s, RPA recommended the construction of the BQE as an efficient way to move goods and people between the Gowanus Parkway and the Triborough Bridge. RPA originally In fall 2018, Regional Plan Association was asked by A Better developed the idea as an alternative to Robert Moses’ proposed Way, a local community organization in Brooklyn, to evaluate Brooklyn Battery Bridge, which would have been even more the BQE project to reconstruct a 1.5 mile section of the highway detrimental to communities on both sides of the East River. from Sands Street to Atlantic Avenue. The project area includes However, as the environmental and social impacts of highway the unique “triple cantilever,” a section of highway supporting construction have become increasingly clear over the last century, two levels of traffic and the Brooklyn Heights Promenade, an RPA has become a strong advocate for reducing car dependency, historic and iconic pedestrian walkway that is a cherished open and providing reliable and affordable alternatives to private space for neighborhood and city residents. The Promenade was vehicle travel. In particular, RPA wanted to see if policy changes built as a benefit to the community when the highway was first affecting the regional network could reduce demand on the BQE, constructed in the middle of the last century. providing better options for rebuilding the aging highway. The New York City Department of Transportation (NYC RPA hopes this report will help reframe the dialogue as the proj- DOT) has proposed to reconstruct the highway in its current ect moves forward, and lead to a design that is more acceptable to location as largely the same structure that currently exists. These the city and neighboring communities. plans have the purpose of providing capacity for the roughly 3 Reimagining the BQE | April 2019 Key findings and recommendations The project evaluated five policy options using available pub- ⊲ A smaller highway should still be considered, even if these lic data and assumptions for how drivers would respond to policies would not reduce traffic sufficiently to accommodate the changes in incentives and requirements embodied in each all remaining demand with a four-lane highway. Other cities alternative. It also conducted a scan of other urban highways, have transformed urban highways to achieve neighborhood both in New York City and elsewhere, that were either perma- and regional benefits without substantially worsening traffic. nently replaced or temporarily had traffic reduced either through reduced capacity or policies that restricted traffic. Based on these findings, we recommend three actions that would create the conditions for an improved BQE that maximizes The results should be considered order-of-magnitude estimates benefits for the city, state and affected neighborhoods: that should be tested and evaluated with more detailed analysis and traffic modeling. However, the findings strongly suggest 1. The congestion pricing policy approved by Gover- that these policies, some individually and others in combination, nor Cuomo and the legislature should be designed to could reduce traffic enough to accommodate remaining demand maximize traffic reduction on the BQE and other roadways. with fewer lanes than the existing six-lane highway. In addition to the wider benefits of reduced congestion, increased funding for transit, improved air quality and ⊲ The congestion pricing plan recently approved by public health, this is one of the most potent policy tools for the New York State legislature could, depending on reducing traffic on the BQE. how it is implemented, remove enough cars and trucks from 2. New York City DOT should further evaluate the potential the relevant section of the BQE to allow remaining traffic to impact of policies described in this report and proposals be accommodated with a four-lane highway. beyond the current alternatives as part of the Environmen- ⊲ Requiring cars on the BQE to have three or more tal Impact Statement. NYC DOT should also establish an occupants during peak periods could also reduce traffic independent advisory group using expertise of top architects, sufficiently to accommodate remaining traffic with a four- transportation experts, community leaders and urban plan- lane highway. ners to advise the process. ⊲ Two other policy changes—reinstating two-way tolls 3. New York State should be an active partner with New on the Verrazano Bridge and requiring cars to have three or York City to implement demand management policies and more passengers when crossing the free East River bridges— reconstruct the highway to achieve the best outcomes for would have less impact but still reduce traffic significantly. residents of the city and state. What this report is and what it is not This report evaluates a range of policies that could reduce the amount of passenger and commercial traffic on the BQE, potentially reducing the number of traffic lanes required both during and after reconstruction. This report does not lay out an “alternative” that can be reviewed in the environmental review nor does it offer a specific design proposal. 4 Reimagining the BQE | April 2019 photo: RPA photo: RPA Summary of NYC DOT project Reconstruction of the BQE represents a The triple cantilever particular challenge. Its traffic volumes are particularly heavy and its physical con- straints are many. While New York City has assumed the burden of repairing the high- way, many actions to manage or divert traf- fic would need state or federal approval. History photo: RPA A triple cantiliver supports the BQE on two lower levels The BQE was built starting in 1944 by Robert Moses. Like and the Brooklyn Heights Promenade on the top level. other urban highways, construction was controversial because it cut through city neighborhoods and displaced residents. In NYS DOT did not move forward with the project, and in 2014, the 1940s and 1950s, the Brooklyn Heights community fought worried about the condition of the road, NYC DOT started Robert Moses and the government’s traditional six-lane highway its own project to rebuild the highway. NYC DOT has worked design. A concession to appease opponents was a highway with since to develop a manageable, doable solution that minimizes a smaller width and in an unusual three deck structure. The impacts. design allowed a park on top, which became the iconic Brooklyn Heights Promenade. The BQE has since become one of the most NYC DOT now estimates that the highway is so deteriorated heavily used urban highways in the nation, and serves a vital that trucks may need to be banned from the roadway in 2026. transportation corridor. As Brooklyn’s only interstate highway, It estimates that the roadway may not be safe for any vehicular the BQE is subject to federal as well as state regulations. travel as soon as 2036. The triple cantilever has not had a major rehabilitation since it The project is complicated and very expensive, expected to cost was constructed decades ago, and concerns are growing about between $3 and $4 billion, making it one of the most expensive its safety. From 2006-2011, New York State Department of projects in the NYC capital program. NYC DOT has authority Transportation initiated a process to evaluate alternatives to fix to repair the roadway using Design Build, but the Request for the roadway. That process was terminated in 2011 due to budget Qualifications needs to be authorized by April 2020. constraints, although it’s likely that strong community opposi- tion also played a role. 5 Reimagining the BQE | April 2019 The BQE sees high traffic volumes Average number of vehicles per weekday: I-93 (the Big Dig, Queensboro Tappan FDR Cross Bronx West Side Boston) Bridge BQE Zee Bridge Drive Expressway Highway 200,000 170,000 153,000 140,000 136,000 115,000 105,000 Current status NYC DOT project parameters In September 2018, the NYC DOT presented updated plans to Different underlying assumptions for how the new highway sec- repair the deteriorating 1.5 mile stretch of the BQE extending tion should be designed and built could lead to a different project.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    16 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us