Herriman High School Secure Entry

Herriman High School Secure Entry

PROJECT MANUAL FOR THE Herriman High School Secure Entry LOCATED IN Herriman, Utah 7387 S CAMPUS DRIVE, WEST JORDAN, UTAH 84084 Bid Set January 14, 2021 Naylor Wentworth Lund Project #136.013 HERRIMAN HIGH SCHOOL SECURE ENTRY PROJECT MANUAL INDEX DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 0100 TITLE PAGE 00 0102 INDEX 00 0103 PROJECT DIRECTORY 00 1101 ADVERTISEMENT FOR BIDS 00 1105 AIA - A701 INSTRUCTIONS TO BIDDERS 00 1110 SUPPLEMENTARY INSTRUCTIONS TO BIDDERS 00 4000 AIA A101 STANDARD AGREEMENT OWNER & CONTRACTOR 00 4100 BID FORM 00 4500 AIA A305 CONTRACTOR’S QUALIFICATION STATEMENT 00 4550 AIA A310 BID BOND 00 4600 AIA A312 PERFORMANCE AND PAYMENT BONDS 00 4700 AIA G705 LIST OF SUBCONTRACTORS 00 7200 AIA A 201 GENERAL CONDITIONS OF THE CONTRACT 00 7300 ARCHITECTS SUPPLEMENTARY GENERAL CONDITIONS 00 7301 OWNERS SUPPLEMENTARY GENERAL CONDITIONS 00 7350 NOTICE TO PROCEED 00 9500 TC-721G TAX EXEMPTION CERTIFICATE DIVISION 01 - GENERAL REQUIREMENTS 01 1000 SUMMARY 01 2000 PRICE AND PAYMENT PROCEDURES 01 2020 AIA G702 APPLICATION AND CERTIFICATE FOR PAYMENT 01 2030 AIA G703 CONTINUATION SHEET 01 2100 ALLOWANCES 01 3000 ADMINISTRATIVE REQUIREMENTS 01 3216 CONSTRUCTION PROGRESS SCHEDULE 01 4000 QUALITY REQUIREMENTS 01 5000 TEMPORARY FACILITIES AND CONTROLS 01 5100 TEMPORARY UTILITIES 01 6000 PRODUCT REQUIREMENTS 01 7000 EXECUTION AND CLOSEOUT REQUIREMENTS 01 7010 AIA G704 CERTIFICATE OF SUBSTANTIAL COMPLETION 01 7020 AIA G706 CONTRACTOR’S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS 01 7030 AIA G706A CONTRACTOR’S AFFIDAVIT OF RELEASE OF LIENS 01 7040 AIA G707 CONSENT OF SURETY TO FINAL PAYMENT 01 7419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 01 7800 CLOSEOUT SUBMITTALS 01 7801 FORM OF GUARANTEE/WARRANTY 01 7900 DEMONSTRATION AND TRAINING DIVISION 02 - EXISTING CONDITIONS 02 4100 DEMOLITION - SELECTIVE DIVISION 03 - CONCRETE 03 2000 REINFORCING 03 3000 CAST-IN-PLACE CONCRETE DIVISION 04 - MASONRY - NOT USED DIVISION 05 - METALS 05 1200 STRUCTURAL STEEL FRAMING 05 4000 COLD-FORMED METAL FRAMING DIVISION 07 - THERMAL AND MOISTURE PROTECTION 07 8400 FIRESTOPPING 07 9200 JOINT SEALANTS DIVISION 08 - OPENINGS 08 4313 ALUMINUM-FRAMED STOREFRONTS 08 7100 DOOR HARDWARE 08 8000 GLAZING DIVISION 09 - FINISHES 09 0561 COMMON WORK RESULTS FOR FLOORING PREPARATION 09 2116 GYPSUM BOARD ASSEMBLIES 09 9123 INTERIOR PAINTING DIVISION 26 - ELECTRICAL 26 0500 ELECTRICAL GENERAL PROVISIONS 26 0507 ELECTRICAL CONNECTIONS FOR EQUIPMENT 26 0519 CONDUCTORS AND CABLES 600 VOLTS AND BELOW 26 0526 GROUNDING 26 0529 SUPPORT DEVICES 26 0532 CONDUIT RACEWAYS 26 0533 ELECTRICAL BOXES AND FITTINGS DIVISION 28 - ELECTRONIC SAFETY 28 2200 ACCESS CONTROL SYSTEM Herriman High School Secure Entry Jordan School District Herriman, Utah West Jordan, Utah SECTION 00 0103 PROJECT DIRECTORY OWNER Name: Jordan School District Attention: David Rostrum Address: 7905 South Redwood Road, West Jordan, Utah 84084 Phone: 801.567.8701 ARCHITECT Name: Naylor Wentworth Lund Architects Attention: Richard Judkins, AIA Address: 723 West Pacific Ave #101, Salt Lake City, Utah 84104 Phone: 801.355.5959 STRUCTURAL ENGINEER Name: Reaveley Engineers Attention: Justin Naduald S.E. Address: 675 East 500 South, Suite #400 Phone: 801.486.3883 ELECTRICAL ENGINEER Name: BNA Consulting Engineers Attention: Jerry Burnside Address: 635 South State Street, Salt Lake City, Utah 84111 Phone: 801.523.2196 Fax: 801.532.2305 ​00 0103​ - ​Project Directory​ Page -​1​ Herriman High School Secure Entry Jordan School District Herriman, Utah West Jordan, Utah SECTION 00 1101 ADVERTISEMENT FOR BIDS 1.01 BID PROPOSALS A. Bids will be received as listed on Bid Sync by the Owner . 1.02 OWNER A. Name: Jordan School District B. Address: 7387 S Campus Drive, West Jordan, Utah 84084 1.03 PROJECT A. Name: Herriman High School Secure Entry B. Address: 11917 S Mustang Trail Way, Herriman, Utah C. Project Description: 1. Refer to Section 01 1000 for Summary of Work. 1.04 ARCHITECT A. Naylor Wentworth Lund Architects B. 723 West Pacific Ave #101 , Salt Lake City, Utah 84104 1.05 BID FORM A. To receive consideration, Bids shall conform to the following instructions: 1. Bids shall conform to all requirements of AIA Document A701 - Instructions of Bidders and Section 00 2114 - Supplementary Instructions to Bidders. 2. Bids shall be completed through BidSync as directed and posted by the owner 1.06 PERFORMANCE AND PAYMENT BONDS A. The successful bidder shall be required to furnish the Owner with the following: 1. AIA Documents A312 - Performance Bond and Payment Bond, each to the amount of one hundred (100) percent of the contract amount. 1.07 CONTRACTOR'S LIABILITY INSURANCE A. Refer to Section 00 7300 - Supplementary General Conditions. B. Certificates of Insurance acceptable to the Owner shall be filed with the Owner prior to commencement of the work. These certificates and the insurance policies required by this paragraph shall contain a provision that coverages afforded under the policies will not be cancelled or allowed to expire until at least 30 days after written notice has been given to the Owner. If any of the foregoing insurance coverages are required to remain in force after final payment and are reasonably available, an additional certificate evidencing continuation of such coverage shall be submitted with the final Application for Payment. Information concerning reduction of coverage shall be furnished by the Contractor with reasonable promptness in accordance with the Contractor's information and belief. C. The Insurance Policy shall hold harmless the Owner and the Architect. ​00 1101​ - ​Advertisement for Bids​ Page -​1​ Herriman High School Secure Entry Jordan School District Herriman, Utah West Jordan, Utah 1.08 PRE-BID WALK THROUGH A. The Owner will be conducting a pre-bid walk through tour , to review existing conditions and accept questions for bidding purposes. The school address is 11917 S Mustang Trail Way, Herriman, Utah. 1. Date of walk through: January 19th, 2021 @ 10:00 am 1.09 COMPLETION TIME A. It is agreed by the parties to the contract that if the Contractor shall fail to complete his work on or before the date set for substantial completion, or extension thereof granted by the Owner, damage will be sustained by the Owner and that it is, and will be, impracticable and extremely difficult to fix the actual damage with the Owner will sustain in the event of and by reason of such delays. It is, therefore, agreed that the Contractor will pay the Owner liquidated damages in the sum of One Thousand Dollars ($1,000) per calendar day, for each day the Contractor shall be in default. The Contractor agrees that any sums which; may be due the Owner as liquidated damages, may be deducted from any monies due, or to become due, the Contractor under the contract or may be collected from the Contractor's Surety. 1. Construction start: June 5, 202 2. Date of Substantial Completion: August 2, 2021 1.10 DRAWINGS AND SPECIFICATIONS A. Can be obtained from Bid Sync as directed by the owner END OF ADVERTISEMENT FOR BIDS 00 1101 - Advertisement for Bids Page - 2 Document A701™ – 2018 Instructions to Bidders for the following Project: (Name, location, and detailed description) This document has important legal consequences. Consultation with THE OWNER: an attorney is encouraged with (Name, legal status, address, and other information) respect to its completion or modification. FEDERAL, STATE, AND LOCAL LAWS MAY IMPOSE REQUIREMENTS ON PUBLIC PROCUREMENT CONTRACTS. THE ARCHITECT: CONSULT LOCAL (Name, legal status, address, and other information) AUTHORITIES OR AN ATTORNEY TO VERIFY REQUIREMENTS APPLICABLE TO THIS PROCUREMENT BEFORE COMPLETING THIS FORM. TABLE OF ARTICLES It is intended that AIA Document G612™–2017, Owner’s 1 DEFINITIONS Instructions to the Architect, Parts A and B will be completed prior to 2 BIDDER'S REPRESENTATIONS using this document. 3 BIDDING DOCUMENTS 4 BIDDING PROCEDURES 5 CONSIDERATION OF BIDS 6 POST-BID INFORMATION 7 PERFORMANCE BOND AND PAYMENT BOND 8 ENUMERATION OF THE PROPOSED CONTRACT DOCUMENTS AIA Document A701™ – 2018. Copyright © 1970, 1974, 1978, 1987, 1997 and 2018 by The American Institute of Architects. All rights reserved. Init. WARNING: This AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible 1 / under the law. To report copyright violations of AIA Contract Documents, e-mail The American Institute of Architects’ legal counsel, [email protected]. ARTICLE 1 DEFINITIONS § 1.1 Bidding Documents include the Bidding Requirements and the Proposed Contract Documents. The Bidding Requirements consist of the advertisement or invitation to bid, Instructions to Bidders, supplementary instructions to bidders, the bid form, and any other bidding forms. The Proposed Contract Documents consist of the unexecuted form of Agreement between the Owner and Contractor and that Agreement’s Exhibits, Conditions of the Contract (General, Supplementary and other Conditions), Drawings, Specifications, all Addenda, and all other documents enumerated in Article 8 of these Instructions. § 1.2 Definitions set forth in the General Conditions of the Contract for Construction, or in other Proposed Contract Documents apply to the Bidding Documents. § 1.3 Addenda are written or graphic instruments issued by the Architect, which, by additions, deletions, clarifications, or corrections, modify or interpret the Bidding Documents. § 1.4 A Bid is a complete and properly executed proposal to do the Work for the sums stipulated therein, submitted in accordance with the Bidding Documents. § 1.5 The Base Bid is the sum stated in the Bid for which the Bidder offers to perform the Work described in the Bidding Documents, to which Work may be added or deleted by sums stated in Alternate Bids. § 1.6 An Alternate Bid (or Alternate) is an amount stated in the Bid to be added to or deducted from, or that does not change, the Base Bid if the corresponding change in the Work, as described in the Bidding Documents, is accepted.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    291 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us