Balochistan Integrated Water Resources Management and Development Project (BIWRMDP)1 | P a G E

Balochistan Integrated Water Resources Management and Development Project (BIWRMDP)1 | P a G E

Public Disclosure Authorized Environmental and Social Management Plan for Nari Gorge Integrated Scheme Marghazani, Dehphal, Khuruk and Khajjak Channesl & Two Spate Irrigation Schemes (Arrand & Bori) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Balochistan Integrated Water Resources Management and Development Project 1 | P a g e (BIWRMDP) June 2018 Contents Contents 2 Executive Summary 10 1 Introduction 21 1.1 General ____________________________________________________________________________________ 21 1.2 Nari Gorge Integrated Scheme (Sub-Project Description) ____________________________________________ 22 1.3 Scope of the Environmental and Social Management Plan ___________________________________________ 23 1.4 Justification and Need of Sub-Project ____________________________________________________________ 26 1.5 ESMP Methodology __________________________________________________________________________ 26 1.6 Data Collection ______________________________________________________________________________ 27 1.7 Environmental and Social Baseline Sampling ______________________________________________________ 27 1.8 Objectives of Environmental and Social Management Plan (ESMP) ____________________________________ 28 1.9 Study Team ________________________________________________________________________________ 29 2 Regulatory and Policy Reviews 30 2.1 World Bank Operational Policies ________________________________________________________________ 30 2.2 National and Provincial Legislative Framework ____________________________________________________ 33 2.3 International Treaties ________________________________________________________________________ 33 3 Description of Engineering Activities 42 3.1 Engineering Activities/Interventions _____________________________________________________________ 42 3.2 Operational Phase Activities ___________________________________________________________________ 50 3.3 Temporary Diversions ________________________________________________________________________ 50 3.4 Construction Schedule ________________________________________________________________________ 50 3.5 Water Supply _______________________________________________________________________________ 54 3.6 Establishment of Contractor Camps _____________________________________________________________ 54 4 Environmental Baseline 62 4.1 Physical Environment ________________________________________________________________________ 62 4.2 Biological Environment _______________________________________________________________________ 71 4.3 Fauna _____________________________________________________________________________________ 73 5 Socio-Economic Baseline 80 5.1 General ____________________________________________________________________________________ 80 5.2 Language __________________________________________________________________________________ 80 5.3 Education Facilities __________________________________________________________________________ 80 5.4 Health Facilities _____________________________________________________________________________ 80 5.5 Water Supply and Sanitation ___________________________________________________________________ 81 2 | P a g e 5.6 Communication _____________________________________________________________________________ 81 5.7 Means of Transport __________________________________________________________________________ 81 5.8 Social Conflicts ______________________________________________________________________________ 81 5.9 Household Information _______________________________________________________________________ 81 5.10 Common Needs to Visit Nearest City ____________________________________________________________ 84 5.11 Livestock ___________________________________________________________________________________ 84 5.12 Source of Livelihood and Income _______________________________________________________________ 85 5.13 Agriculture Tool and Farm Machinery ___________________________________________________________ 85 5.14 Seasonal Earnings from Crops __________________________________________________________________ 85 5.15 Agricultural land holding and cropping pattern ____________________________________________________ 86 5.16 Anticipated Losses due to the Project ____________________________________________________________ 86 5.17 Housing ___________________________________________________________________________________ 86 5.18 Land Ownership _____________________________________________________________________________ 87 5.19 Community Based Organization (CBOs) and NGOs _________________________________________________ 87 5.20 Customary Institutions _______________________________________________________________________ 87 5.21 Local Government and Administration ___________________________________________________________ 88 5.22 Law and Order Situation ______________________________________________________________________ 88 5.23 Community Cultural Properties _________________________________________________________________ 88 5.24 Community Awareness about Sub-Project Works __________________________________________________ 88 5.25 Community Demands ________________________________________________________________________ 88 6 Environmental and Social Impacts and Mitigations Measures 89 6.1 Overview __________________________________________________________________________________ 89 6.2 Environmental Impacts _______________________________________________________________________ 90 6.3 Social Impacts and Proposed Mitigation Measures ________________________________________________ 104 6.4 Induced Economic Development during Construction ______________________________________________ 105 6.5 Archaeological and Cultural Heritage Site _______________________________________________________ 109 6.6 Physical Resettlement _______________________________________________________________________ 110 7 Community and Stakeholder Consultation 111 7.1 General ___________________________________________________________________________________ 111 7.2 Methodology of Consultation _________________________________________________________________ 111 7.3 Formation of Farmers Organization (FO) ________________________________________________________ 112 7.4 Summary of Discussions _____________________________________________________________________ 112 7.5 Summary of Findings of Consultation with Farmers ________________________________________________ 113 7.6 Consultation with Women Community__________________________________________________________ 113 7.7 Women Development Groups (WDGs) __________________________________________________________ 114 7.8 Findings of Women Consultations and Priority Needs ______________________________________________ 115 8 Institutional and Implementation Arrangements 116 8.1 The Contractor _____________________________________________________________________________ 116 8.2 Contractor’s Environmental and Social Management Plan (CESMP) and Contractor Health and Safety Plan ___ 117 9 The Environmental and Social Management and Mitigation Plan 119 9.1 General ___________________________________________________________________________________ 119 9.2 Monitoring Mechanism ______________________________________________________________________ 120 9.3 Aims of Monitoring _________________________________________________________________________ 120 9.4 Non-compliance’s and Corrective Measures _____________________________________________________ 120 3 | P a g e 9.5 Communication, Reporting and Documentation __________________________________________________ 121 9.6 Contractor’s Health and Safety Plan ____________________________________________________________ 125 9.7 Contractor’s Code of Conduct _________________________________________________________________ 126 9.8 The Environmental and Social Monitoring and Mitigation Plan ______________________________________ 127 10 Grievance Redress Mechanism (GRM) 149 10.1 General ___________________________________________________________________________________ 149 10.2 Objectives of Grievance Redress Mechanism _____________________________________________________ 150 10.3 Principles, Procedures and Timelines ___________________________________________________________ 150 10.4 Grievance Recording and Redress Monitoring ____________________________________________________ 151 10.5 Dissemination _____________________________________________________________________________ 151 10.6 Proposed Mechanism for Grievance Redress under BIWRMDP ______________________________________ 151 10.7 Public Complaints Centre ____________________________________________________________________ 152 10.8 Grievance Redress Committee (GRC) ___________________________________________________________ 152 10.9 Grievance Focal Points (GFPs) _________________________________________________________________ 152 10.10 Role and Responsibilities of PCC _______________________________________________________________ 152 10.11 Nomination of Focal Person for GRM at Community Level __________________________________________ 154 10.12 Budget for GRM Implementation ______________________________________________________________ 154 11 ESMP Implementation Budget_______________________________________________________ 155 12 References______________________________________________________________________ 157 Appendices _______________________________________________________________________________158 List of Figures

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    193 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us