GOVERNMENT OF TELANGANA MISSION BHAGIRATHA PALAIR WARANGAL SEGMENT GRID -MAHABUBABAD DISTRICT 1 Mission Bhagiratha - Vision To Provide safe, sustainable and secured water supply to each and every house hold by providing tap connection as . 100 LPCD ( litres per capita per day) for rural areas, . 135 LPCD for Municipalities . 150 LPCD for Municipal Corporations . 10% Quantity allocated to Industrial requirements GRID - Planned to Transmit Bulk water through primary and Secondary network up to Rural Habs,Towns, Cities and Industrial Areas (10%). (Segment as a Unit) INTRA - Bulk water will be distributed through Intra-village distribution network up to house holds (District as a Unit) Optical fiber cable also laid along with the pipeline network for each and every house hold Total State divided as 26 segments for work execution convenience, in which Palair Warangal segment is one such segment to cover 1706+79 habitations in Mahabubabad, Warangal Rural, Jayashankar Bhupapally and Khammam Districts. Water in all Irrigation sources reserved for Mission Bhagiratha Drinking Water. Details of Budget allocations of Palair Warangal Segment Grant : Mission Bhagiratha (TDWSP) Administrative Sanction : GO Rt No. 394, Dt: 23.06.2015 of PR&RD (RWS-IV) Department Estimated cost : Rs. 1700.00 Crs Achieved : Bulk supply achieved by September 2019 Current Status of the Scheme : Operation & Maintenance Old Schemes : All the old Schemes integrated with Mission Bhagiratha Coordination with other Depts : Railway, R&B, NH, Forest, Revenue, NPDCL Coverage Details Constituencies : 4 No.s (Dornakal, Palakurthy, Mahabubabad and Mulugu) Mandals : 14 No.s Rural Habitations : 1138 No.s Rural and 68 No.s ULB merged Habitations Rural Population (2011) : 561706 ULBs : Old - 1 No (Mahabubabad) and New - 3 No.s (Dornakal, Maripeda, Thorrur) ULBs Population (2011) : 119498 (52513 (old) + 66985 (new)) Water Treatment Plant : 170 MLD at Abbaipalem of Maripeda mandal OHBRs : 6 No.s GLBRs : 05 No.s BPTs : 06 No.s Sumps : 11 No.s Pump houses : 10 No.s Raw water Pumping main : 21.25 Kms Pipeline under WTP : 1803.36 Kms Power requirement : 5.40 MW Habitation Coverage - Constituency wise 170 MLD Water Treatment Plant and allied structures at Abbaipalem of Maripeda Mandal Hon’ble Chief Minister of Telangana visit to the 170 MLD Water treatment plant at abbaipalem during the construction on Jan 2017 Coverage of Urban Local Bodies Old ULB Mahabubabad The Sump with 3500 KL capacity is constructed for bulk supply to Mahabubabad town near Nizam Cheruvu and handed over to the ULB authorities for utilization. Due to incomplete distribution network of ULB from the sump, the ULB authorities not utilizing the bulk water from 3500 KL sump. Instead, the ULB authorities drawing water directly through the Grid main pipelines. Direct Connections provided at Etigaddathanda (4528 LPM), at Babagutta (2190 LPM), at Salar Thanda (80 KLD), at Agriculture Market (102 KLD), at Yashodha Gardens (425 KLD), at Giriprasad nagar Colony (440 KLD), at Hasinapur Colony (79 KLD) and at Ambetkar Colony (60 KLD) Demand give by ULB authorities : 2018 – 9.4 MLD, 2033 – 12.65 MLD, 2048 – 17.02 MLD Current Supply : 9.60 MLD Merged Habitations 35 Habitations Merged with Mahabubabad ULB having population 16670 (2011 census) and resulting urban demand 1.89 MLD (2020) Current supply to merged habitations : 1.89 MLD Contd….. New ULBs Thorrur ULB formed with 6 Habitations including Thorrur Town Population 18474 (2011 census) and present urban demand 2.45 MLD Current supply : 2.45 MLD Maripeda ULB formed with 22 Habitations including Maripeda Town Population 17687 (2011 census) and present urban demand 1.96 MLD Current supply : 1.96 MLD Dornakal ULB formed with 11 Habitations including Dornakal Town Population 14154 (2011 census) and present urban demand 1.50 MLD Current supply : 1.36 MLD Present Status in Mahabubabad District Presently, Bulk water supplying to all the 1138 Rural habitations and 1 old & 3 New ULBs (under palair Warangal Segment) continuously. Operation & Maintenance of the Scheme Conducting, Constituency wise Awareness programs with all the public representatives for the effective usage of Mission Bhagiratha water. So far, the awareness program for Palakurthy Constituency completed. Bulk supply connections to Residential Schools, which are having water storage facilities are under progress. As on date bulk supply connections given to 78 Residential Schools out of total 80 No.s. Hon’ble Minister of PR&RD and RWS visit to the 170 MLD Water treatment plant at abbaipalem during the Awareness program Dec 2019 conducted for Public representatives and local bodies staff of Palakurthy Constituency THANK YOU.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages12 Page
-
File Size-