Land at Parc Mawr Members Briefing Pack Penllergaer

Land at Parc Mawr Members Briefing Pack Penllergaer

2018/2697/OUT July 2020 Land at Parc Mawr Members Briefing Pack Penllergaer ......................................................................................................................................................................................................................................................................................... Introduction “Parc Mawr offers the opportunity to create a vibrant and walkable neighbourhood with a distinct sense of place as an integrated addition to Penllergaer. A sustainable, mixed use and inclusive community is envisaged which will put people first and provide a high quality development in the City and County of Swansea.” Bellway Homes has produced this brochure in relation to the hybrid planning application that is being presented to Planning Committee on the 17th July. The application is for the strategic site allocated in the adopted LDP (Strategic Site C) and comprises: A) Outline planning application with all matters reserved (except those included in full application below) for residential led mixed use development of up to 850 residential dwellings in total (use class C3) to be developed in phases; primary school; provision of local centre including community facilities; spine road with links to Gorseinon Road, the A483 and A484; and associated public open space/ play provision, highways, drainage, ecological mitigation, landscaping and engineering works, B) Full application for the erection of 184 dwellings and associated works as part of phase 1a of the development; access off Brynrhos Crescent; the demolition of 31 Gorseinon Road and demolition of identified Parc Mawr Farm buildings. The proposals have been subject to extensive engagement with the local community during the LDP preparation stages as well as Council officers during the application preparation. A significant number of design, public open space, community facility and green infrastructure elements have been included at the request of Officers. The proposals are therefore an exciting opportunity to develop a vibrant community where future residents can enjoy green spaces and sustainable living with excellent links to Swansea via an enhanced pedestrian and cycle network. The scheme will provide much needed open market and affordable homes on one of the Council’s strategic sites in the LDP. 2 In delivering the vision the masterplan proposes to: Site Wide Masterplan p CreateCreate aa sustainablesustainable residentialresidential neighbourhoodneighbourhood ofof up to 850up tonew 850 homes new homes within withinPenllergaer, Penllergaer, comprising comprising a number of charactera number areas of character that integrate areas that positively integrate with positively the existing community,with the existing community. p Create Create a multi-functionala multi-functional Green Green Infrastructure Infrastructure network network throughoutthroughout the thesite, site, with with an emphasisan emphasis on integratingon integrating New Access landscapelandscape features, features, protecting protecting biodiversity, biodiversity, habitat habitat creation creation p Deliver Deliver a newa new local local ‘hub’ ‘hub’ to to Penllergaer Penllergaer with with a a new New Nursery and Primary primarynew primaryschool and school nursery, and nursery,and supporting and supporting commercial School usescommercial around a focal uses area around in the a focal northern area inpart the northern part Neighbourhood Centre p Retain Retain the the farm farm lane lane as as an an Active Active Travel Travel route route through through the thesite. site. p Retain Retain the the farm farm complex complex and and reuse reuse for for community community Retained Farm Buildings benefit.benefit. p Provide Provide a mixa mix of ofhigher higher densities densities at atkey key points points in inthe the layoutlayout and and lower lower densities densities on theon therural/sensitive rural/sensitive edges. edges. p Provide Provide a linka link between between A484 A484 to to spine spine street street with with cycle cycle pathpath alongside alongside Green Infrastructure Network Sports Pitches New Access Up to 850 New Homes Connecting Link to A484 3 The site-wide GI Strategy is multifunctional and provides: p Increased green space in more sensitive areas. Site Wide Green Infrastructure Strategy p A multifunctional network of green corridors. p Integrated drainage and attenuation. p A pedestrian and cycle access route network. p Informal and formal play and recreational spaces. p Public open spaces, integrated and linked to the community. p A ‘green edge’ to development zones. p A ‘treeing strategy,’ including: g Formal tree avenues along principal streets. g Gateways. g Nodal grouping of mixed species within residential areas. g Informal native green corridors of woodland, hedgerows and tree groups. p A diverse palette of native and ornamental planting. p Landscape integration of development edges. p Integration and enhancement of existing habitats, including: g Species-rich grassland and wetland. g Woodland and hedges. p Provision of new wildlife habitats. 4 ......................................................................................................................................................................................................................................................................................... Proposed Neighbourhood Centre and Primary School The masterplan proposes a new local ‘hub’ to Penllergaer with a new primary school and nursery, and supporting commercial uses around a focal area in the north of the site. This part of the site will have ‘contemporary’ character, anchored by the new primary school and commercial use and based around a new tree lined link through the development. It will contain the highest density parts of the development and including buildings of increased scale, a number of which should act as local landmarks. New 3 form entry primary school Mature trees retained within Shared surface street with visitor parking with main entrance fronting square large public square for commercial units fronting square High quality public realm to Commercial units to ground floors of 3 Service access for commercial units school frontage to tie into square storey apartment blocks fronting square and residential parking to rear Shared surface street with visitor parking Shared Footpath for commercial units fronting square Cycleway 3 storey homes fronting edge of square and spine road Possible 3 storey Care facility Spine Road with Formal tree or over 55s scheme lined verges View North East towards mixed use units from School View East from above across square towards mixed use units 5 SWANSEA ROAD The Phase 1a detailed GI Strategy delivers; Phase 1A Green Infrastructure Strategy p A hierarchy of greened streets. p Garden resource, including bird and bat boxes sub station and hedgehog access. p Placemaking measures, such as gateways, nodes, GAS semi ELEC 01 green edges and approaches. G1 101.8m BMP 01 GAS semi 33 Private Drive ELEC p Play facilities, including formal and free play 02 G01 A ELEC 03 GAS sem i GAS SEMI 02 01 areas. 03 ELEC G02 02 G1 04 03 A p ELEC Wildlife movement corridors. GAS semi 05 5 1 04 11 GAS semi ELEC 05 03 p Integrated drainage attenuation. 04 BMPG1 05 04 10 p 44 Benches and trim trail equipment. G11 Private Drive 05 09 ELEC 06 p DDA recreational access. GAS semi 06 11 Issues ELEC 11 06 A G10 GAS 20 semi G07 20 18 06 19 07 07 07 10 18 ELEC G09 10 G20 G E 19 * GASsemi A G08 1464 09 G1 18 08 Private Drive G18 Shared Surface 09 12 A 08 19 ELEC 13 ELEC G19 08 GAS 21 semi A BMP 12 SWANSEA12 ROAD ELEC GAS semi G2 21 13 T G G12 E GAS SEMI 22 GAS semi ELEC G13 20 21 22 Shared Surface 1464 semi GAS v flue v BIG 22 14 W 13 E G 17 47 ELEC 23 2 17 sub 23 station 14 23 23 17 1666 26 24 ELEC 14 27 24 G14 G17 G3 16 G16 semi GAS GAS 54 semi 16 GAS semi 24 ELEC 01 G1 G1 ELEC 25 GAS semi 16 101.8m BMP ELEC ELEC 01 GAS semi 33 25 Private Drive ELEC semi GAS semi GAS ELEC 02 G01 A ELEC 03 GAS semi GAS 25 SEMI G15 02 26 01 26 03 15 27 ELEC 27 * 15 G02 02 G1 04 03 A ELEC GAS G2 v semi 05 v 5 1 04 1115 GAS semi ELEC 05 ELEC 03 Shared Surface 28 04 BMPG1 31 05 04 10 32 1666 44 semi GAS 32 2 29 semi GAS G11 Private Drive 05 09 ELEC E GAS G semi GAS semi 31 ELEC 06 BRYNDERI CLOSE GAS semi 06 11 ELEC 11 Issues ELEC 29 06 ELEC A G10 GA semi 20 S 18 G07 20 29 06 9 31 29 10 19 07 07 28 07 10 18 28 ELEC G09 10 G20 G 28 E 19 * GASsemi A G08 1464 09 G1 18 08 Private Drive G18 Shared Surface 09 12 A 30 08 19 ELEC 13 ELEC G19 08 GAS semi semi 31 21 GAS A BMP 12 12 ELEC GAS semi G2 21 v 13 32 T G G12 G30 E GAS SEMI 22 ELEC GAS semi ELEC G2 G13 20 21 22 30 LAP - Larger than100m2 30 Shared Surface 1464 semi 33GAS v flue 33 v BIG 22 33 14 W 13 E ELEC G 17 47 33 ELEC 23 2 17 23 14 23 23 1 17 1666 26 24 ELEC SEMI GAS 14 27 24 LAP G14 semi GAS v G17 *G3 16 G16 G2 G1 semi GAS GAS 54 34 semi 16 24 ELEC G1 CLOSE ELEC 3 25 GAS semi 16 ELEC ELEC 34 34 34 25 semi GAS semi GAS ELEC G35 35 35 25 ELEC G15 v v semi 26 GAS 26 15 27 1 27 * 15 G2 35 G2 v v 15 Shared Surface 28 ELEC 31 32 1666 36 semi GAS GAS semi 32 2 ELEC 29 semi GAS ELEC G * semi GAS ELEC E E ELEC GAS G semi GAS semi 31 BRYNDERI CLOSE GAS G36 52 53 semi flue ELEC 36 29 36 ELEC 29 9 31 29 1666 10 28 E 28 G 51 51 28 52 53 W 2 1464 * 1 37 30 RWP v G51 semi GAS DDG 31 53 G52 G53 32 v G30 51 SALES ELEC G2 52 GLANYRAFON 30 LAP - Larger than100m2RWP OFFICE + G37 30 33 37 37 Show Home Show Home 33 2 33 33 ELEC 56 56 G56 1ELEC 38 semi GAS 1

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    12 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us