Bonner Bridge Replacement Update

Bonner Bridge Replacement Update

Outer Banks Bridges Update: Outer Banks Chamber of Commerce Economic Summit Jerry D. Jennings, PE - Division Engineer April 12, 2018 Mid-Currituck Bridge Currituck Sound (Wright Memorial Bridge) Alligator River (Lindsay C. Warren Bridge) Oregon Inlet (Herbert C. Bonner Bridge) Pea Island (Captain Richard Etheridge Bridge) Rodanthe Bridge 2 Alligator River Bridge 3 Alligator River Bridge • Preservation project • Mechanical/electrical rehab of swing span • Concrete and pile repairs • Contract awarded to Flatiron Constructors • Contract amount of $16,676,729 • Contract completion September 17, 2019 4 Wright Memorial Bridge 5 Wright Memorial Bridge • Preservation project of Eastbound Bridge • Deck overlay, concrete and pile repairs • Contract awarded to Flatiron Constructors • Contract amount is $21,072,992 • Bridge scheduled to reopen by May 14, 2018 • Contract completion November 1, 2019 6 Mid-Currituck Bridge 7 Mid-Currituck Bridge Ongoing Activities • Interagency coordination meeting held in March • Completing Reevaluation Report with FHWA • Continuing traffic and revenue studies • Traffic and revenue studies will be used to develop Plan of Finance • Plan of Finance will inform project delivery (construction contract) 8 Mid-Currituck Bridge Current Schedule • Draft EIS Completed • Final EIS Completed • Reevaluation April 2018 • Record of Decision Spring/Summer 2018 • Begin Construction To be determined • Open to Traffic To be determined *Schedule is preliminary and subject to change 9 Rodanthe Bridge • Historical “hot spot” • Breach formed during Hurricane Irene in August 2011 • Further damage from Hurricane Sandy in October 2012 • Beach nourishment completed September 2014 as an interim approach • Extensive over wash during recent nor’easters 10 Rodanthe Bridge 11 Rodanthe Bridge • Planning for long term solution has been underway for several years • Record of Decision approved in December 2015 • Includes 2.4 mile long “jug handle” design 12 Rodanthe Bridge 13 Rodanthe Bridge • Design-build contract awarded to Flatiron Constructors in January 2017 • RK&K is the lead design firm • Contract amount of $145 million • Design and permitting underway • Right of way acquisition underway • Onsite construction to begin Summer 2018 • Completion in 2020 14 Rodanthe Bridge 15 Pea Island Bridge • Historical area of “New Inlet” • Breach formed during Hurricane Irene in August 2011 • 660 ft. temporary steel bridge constructed • Planning underway for longer term solution 16 Pea Island Bridge 17 Pea Island Bridge • Contract awarded to T. A. Loving Co. in November 2015 • Contract amount of $14.3 million • Includes 1/2 mile long concrete structure • Onsite construction began in March 2016 18 Pea Island Bridge 19 Pea Island Bridge 20 Pea Island Bridge • Opened to Traffic Nov. 14, 2017 • Named “Captain Richard Etheridge Bridge” 21 Pea Island Bridge 22 Bonner Bridge Replacement 23 Bonner Bridge Replacement • Existing Bonner Bridge opened in 1963 • Planning began for replacement in 1990 • Settlement agreement reached to replace bridge in 2015 • Construction began in March 2016 24 Bonner Bridge Replacement • Prime contractor is PCL Civil Constructors, Inc. • HDR Engineering, Inc. is the lead design firm • Contract amount of about $250 million 25 Bonner Bridge Replacement Old New Bridge length (miles) 2.4 2.8 Number of bents 207 83 Number of navigation spans 1 9 Navigation opening width (feet) 130 300+/- Design lifespan (years) 30 100 26 Bonner Bridge Replacement • Many precast concrete elements used • Stainless reinforcing steel and high durability concrete used to protect against corrosion • 6,300 ft. work trestle used on north end • Bridge demolition material to be placed in offshore reef sites • Portion of existing bridge to be retained at south end 27 Bonner Bridge Replacement 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 ~80 ~70 ft. ft. ~300 ft. 44 45 46 47 48 Bonner Bridge Replacement • Status – Contract completion is about 79% (includes design, mobilization, materials fabrication) – Onsite construction is about 68% complete – Multiple operations ongoing concurrently – 24 hours/day for some activities • Scheduled bridge opening late 2018 • Contract completion Fall 2019 49 Questions? Jerry D. Jennings, PE Division Engineer (252) 482-1850 [email protected] 50.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    50 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us