6.0 Operational Ancillary Facilities MCC ARCHITECTURAL DESIGN BRIEF

6.0 Operational Ancillary Facilities MCC ARCHITECTURAL DESIGN BRIEF

Motorway Control Centre Brief Motorway Control Centre Brief 6.0 Operational Ancillary Facilities MCC ARCHITECTURAL DESIGN BRIEF NoMCCRoom ARCHITECTURALArea Area - Ex Requirements DESIGN BRIEF No Room Area Area - Ex Requirements AMENITIES GROUPING 6.0 Reception Foyer 82 ----- Reception desk, seating for 4 visitors and F3-M2 Operations Centre signage. Flush mounted wall cabinet for display of Policy documents and accreditations AMENITIES12.0 Technical GROUPING Library 41 ----- 13.06.0 AmenitiesReception Foyer 82 ----- Reception desk, seating for 4 visitors and F3-M2 Operations Centre signage. Flush mounted wall cabinet for display of Policy documents and accreditations 12.0 Technical13.1 Sick Library Bay 1941 ----- 13.0 Amenities13.2 Recovery Room 11 ----- 13.313.1 MaleSick Bay Toilets 2419 ----- 13.413.2 FemaleRecovery Toilets Room 2411 ----- 13.513.3 Male LockersToilets 1524 ----- Space for 9 Lockers 13.613.4 Female LockersToilets 1424 ----- Space for 9 Lockers 14.0 General13.5 Male Lunch Lockers Areas 15 ----- Space for 9 Lockers 14.113.6 LunchFemale Rm Lockers 9414 ----- IncludingSpace for 29 sinks,Lockers prep areas, 2 x 600 litre (nom) fridges, coffee machine, cupboards, 2 microwaves and 2 dish washers, hot-cold-chilled water. 14.0 General14.2 Exterior Lunch BreakAreas Out Space 116----- 40 Window and door to Lunch Rm 18.0 Services14.1 Lunch + Utilities Rm 94 ----- ProvideIncluding all 2 services,sinks, prep utilities areas, and 2 x back600 litreup systems (nom) fridges, and associated coffee machine, service rooms cupboards, (as appropriate) 2 microwaves to theand standards 2 dish washers, typically hot-cold-chilled incorporated inwater. office facilities for 24/7 operations 18.114.2 MechanicalExterior Break Space Out Space 11631 40 AsWindow Required and door to Lunch Rm 18.0 Services18.2 Electrical + Utilities Closet 0 AsProvide Required all services, utilities and back up systems and associated service rooms (as appropriate) to the standards typically incorporated in office facilities for 24/7 operations 18.318.1 TrashMechanical + Receiving Space 3031 AccessAs Required to Service Bay 23.0 Bicycle18.2 Electrical Facilities Closet 0 ----- As Required 23.118.3 GeneralTrash + ReceivingArea 2730 ----- 8Access bicycle to racks Service - Undercover Bay - Size to be Confirmed/Tested 23.0 Bicycle23.2 Male Facilities Change Rm 5 ----- Provide Shower 23.323.1 FemaleGeneral Change Area Rm 275 ----- Provide8 bicycle Shower racks - Undercover - Size to be Confirmed/Tested 24.0 Cleaners23.2 Male Rm Change Rm 75 ----- Provide Shower Total Amenities23.3 Female Areas Change Rm 5455 ----- 40 Provide Shower 24.0 Cleaners Rm 7 ----- Total BuildingAmenities Areas Areas 1832545 40 Assigned Space Circulation + Walls 7% 128.24 Multiplier Total BuildingOverall Areas 1960.21832 Assigned Space Circulation + Walls 7% 128.24 Multiplier Total Overall 1960.2 NorthConnex | May 2014 | 75 A B C D E F G B 5 Vent Area Storage 4 09 2.50 5.40 Disabled 1918 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 3 5.55 5.55 2.50 2.50 139.5 139.0 A 5.80 5.80 A 2 1.20 2.60 2.60 2.60 3.00 3.00 3.00 Turning 20 21 221.65 23 24 25 26 27 28 29 30 5.55 2.50 Bay 1.35 IRT HZM TRM EWP RSP TUV 3.85 7.00 1 Vent Area 140.0 09 18.3 Trash + B Receiving Legend 09 Alum Security Screen - Match Sun Screen 0 2 4 6 8 10m M1-M2-5000-DR-UD-0503 SCALE 1:200@A3 MOTORWAY OPERATIONS COMPLEX - MOTORWAY CONTROL CENTRE - BASEMENT FLOOR PLAN 76 | May 2014 | NorthConnex A B B C D E F G 0.40 0.40 9.20 7.20 12.00 8.40 9.60 14.00 5 0.40 3.20 3.60 11.0 7.0 Garage Vent Building Security Work Permit Office 4 142.5 140.4 9.20 3.00 3.00 22.0 4.80 Incident Response + Muster Rm 5.70 13.5 13.6 Male Locker 24.0 Female Locker Cleaners 6.0 Reception Foyer 18.1 8 7 6 5 4 3 2 1 Mechanical Space 3 5.40 12 ?? 1.25 4.80 Technical Library Disabled Toilet 3.70 2.40 13.3 13.4 Male Toilets Female Toilets A 6.00 A 5.80 142.5 9.60 23.2 9.60 Male change Rm 13.2 Recovery Rm 14.1 23.3 RMS9.3 Room 11.40 Female 8.3 10.20 Lunch Rm 2 change Rm Mobile Phone Room 2.60 2.60 2.60 3.00 3.00 3.00 2.15 30 5.55 2.50 13.1 23.1 Sick Bay General Area IRT HZM TRM EWP RSP TUV 6.80 6.80 7.00 4.20 3.00 14.2 2.60 Exterior Break Out Space 1 0.40 1.60 142.5 144.0 Planter Box Service Bay B 4.90 Garage Vent Below 0 2 4 6 8 10m M1-M2-5000-DR-UD-0504 SCALE 1:200@A3 MOTORWAY OPERATIONS COMPLEX - MOTORWAY CONTROL CENTRE - GROUND FLOOR PLAN NorthConnex | May 2014 | 77 A B B C D E F G 0.40 0.40 9.20 7.20 12.00 9.60 9.60 14.00 4.00 3.60 3.60 3.60 4.40 4.40 0.40 5 0.40 5.1 5.2 5.3 4.2 4.1 Business Mgmt Operations Mgr Asset Mgmt Mgr BCP Traffic Management 3.60 Terrace 8.1 MCC Computer 4 2.55 2.55 9.20 2.90 5.60 9.2 8.40 Break Out Area 12.20 5.20 3.00 9.60 5.4 1.2 1.3 8.2 3.0 Traffic Op. Mgr. Kitchenette MCC Toilet RRB Room 4.00 Secure Incident Break Out Space 4.40 2.65 8.4 6.15 3 6.20 UPS Room 2.55 3.00 4.60 4.00 2.80 A A 2.55 2.90 9.60 9.60 13.4 Female Toilets 2.1 9.1 5.6 4.3 Incident Rm 1.1 Open Plan Work Stations Spare Asset Emergency Operations Rm Management Team 13.50 24.0 10.0 Cleaners 2 Utilities 5.5 WHSE&Q ?? Disabled 2.2 6.80 Toilet Kitchenette 6.80 5.7 4.4 Traffic Op. Mgr. 0.20 Media Transurban 13.3 Male Toilets 1.25 0.40 1 0.40 3.00 3.20 2.00 4.80 3.60 2.00 3.60 B 0 2 4 6 8 10m M1-M2-5000-DR-DR-UD-0505 SCALE 1:200@A3 MOTORWAY OPERATIONS COMPLEX - MOTORWAY CONTROL CENTRE - FIRST FLOOR PLAN 78 | May 2014 | NorthConnex G F E D C B A 02 06 RL.152.3 01 RL.146.7 19 RL.142.5 01 A B C D E F G 06 02 RL.152.3 01 RL.146.7 09 RL.142.5 Garage Vent Area 09 RL.140.0 05 09 12 Legend 01 GRC Panels in Various Colours 05 Painted rendered Concrete Wall 09 Alum Security Screen - Match Sun Screen 02 Insulated Glass - 600 x 1200 - Operable as shown 06 Standard Pattern Alum Sun Screen Grating 1200 wide 10 Exposed Concrete - No Finish 03 Single Panel Glass - 600 x 1200 - Operable as shown 07 Steel Structure to Engineers Requirement 11 Door to Engineers Requirements 04 Shed Panels Wall - Horizontal 300 ridges 08 Removable Alum Louver 12 Galv Steel Roll Up Door 13 Rain Harvesting Equipment 0 2 64 8 10m M1-M2-5000-DR-UD-0506 SCALE 1:200@A3 MOTORWAY OPERATIONS COMPLEX - MOTORWAY CONTROL CENTRE - ELEVATIONS NorthConnex | May 2014 | 79 5 4 3 2 1 RL.152.3 06 RL.146.7 RL.142.5 1 2 3 02 4 5 RL.152.3 01 RL.146.7 09 RL.142.5 Legend 01 GRC Panels in Various Colours 05 Painted rendered Concrete Wall 09 Alum Security Screen - Match Sun Screen 02 Insulated Glass - 600 x 1200 - Operable as shown 06 Standard Pattern Alum Sun Screen Grating 1200 wide 10 Exposed Concrete - No Finish 03 Single Panel Glass - 600 x 1200 - Operable as shown 07 Steel Structure to Engineers Requirement 11 Door to Engineers Requirements 04 Shed Panels Wall - Horizontal 300 ridges 08 Removable Alum Louver 12 Galv Steel Roll Up Door 13 Rain Harvesting Equipment 0 2 64 8 10m M1-M2-5000-DR-UD-0507 SCALE 1:200@A3 MOTORWAY OPERATIONS COMPLEX - MOTORWAY CONTROL CENTRE - ELEVATIONS 80 | May 2014 | NorthConnex 5 4 3 2 1 AREA FOR SOLAR PANELS RL.152.3 9.1 Open Plan Work Stations Balcony RL.146.7 22.0 12 14.1 14.2 Incident Response Techical Library Lunch Rm Exterior Break Out + Muster Rm Spaces RL.142.5 Garage Vent Area Garage Vent Area RL.139.0 A B C D E F G AREA FOR SOLAR AREA FOR SOLAR PANELS MECHANICAL AREA PANELS RL.152.3 9.1 9.2 2.1 1.1 Open Plan Work Break Out Area Incident Rm Operations Rm Stations Corridor RL.146.7 14.1 6.0 8.3 Lunch Rm Reception Area Corridor Mobile Phone Room Garage RL.142.5 RL.139.5 Garage RL.139.0 RL.139.0 0 2 64 8 10m M1-M2-5000-DR-UD-0508 SCALE 1:200@A3 MOTORWAY OPERATIONS COMPLEX - MOTORWAY CONTROL CENTRE -SECTIONS NorthConnex | May 2014 | 81 6.0 Operational Ancillary Facilities Pylon The pylon at the northern end of the motorway operations complex provides building identity and stands as a market for the project. For the purposes of this report it has been assumed that the tunnel would be branded with its own identity rather than be seen as simply and extension of the M1 Pacific Motorway towards the Hills Aluminium M2 Motorway.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    20 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us