Replacement Linkspan, Fishguard Port Environmental Statement Volume II: Figures

Replacement Linkspan, Fishguard Port Environmental Statement Volume II: Figures

Replacement Linkspan, Fishguard Port Environmental Statement Volume II: Figures rpsgroup.com Replacement Linkspan, Fishguard Port CONTENTS FIGURES * Denotes Figures embodied within text of relevant ES chapter (Volume I) Figure 2.1: Site Location M0680-RPS-00-XX-DR-C-9000 Figure 2.2: Single Tier Linkspan Layout Plan M0680-RPS-00-XX-DR-C-1004 *Figure 2.3: Open Piled Deck, Bankseat and Linkspan Ramp *Figure 2.4: Bankseat *Figure 2.5: Landside of Buffer Dolphin and Linkspan Ramp *Figure 2.6: Seaward Edge of Buffer Dolphin Showing Forward End of Linkspan Ramp *Figure 2.7: Jack Up Pontoon Figure 2.8: Demolition and site clearance M0680-RPS-00-XX-DR-C-9002 Figure 2.9: Linkspan levels M0680-RPS-00-XX-DR-C-3001 *Figure 2.10: Typical Backseat Plan and Section, showing pile arrangement *Figure 2.11: Indicative Double Tiered Linkspan Layout Figure 2.12: Proposed site compound locations M0680-RPS-00-XX-DR-C-9003 *Figure 3.1: Comparison of Alternative Revetment Designs *Figure 4.1: Extent of hydraulic model of Fishguard harbour and its approaches *Figure 4.2: Wave disturbance patterns – 1 in 50 year return period storm from N *Figure 4.3: Significant wave heights and mean wave direction 1 in 50 year return period storm from 120° N *Figure 4.4: Typical tidal flood flow patterns in Fishguard Harbour *Figure 4.5: Typical tidal ebb flow patterns in Fishguard Harbour *Figure 4.6: Tidal levels currents and directions at the linkspan site – spring tide *Figure 4.7: Tidal current speed difference, proposed minus existing, at time of maximum current speed at the site *Figure 4.8: Dredging periods (red bars) during silt dispersion simulation *Figure 4.8a: Dredged silt plume ebb tide *Figure 4.8b: Dredged silt plume low water *Figure 4.8c: Dredged silt plume flood tide Environmental Statement February 2018 Replacement Linkspan, Fishguard Port *Figure 4.9: Dredged silt maximum SSC envelop over whole of dredging period *Figure 4.10: Dredged silt mean SSC over the whole of the dredging period *Figure 4.11: Maximum depth of deposited silt resulting from dredging operations *Figure 5.1: Extract from TAN15- Flood Zones *Figure 5.2: Extract from Development Advice Map *Figure 5.3: Extract from TAN-15 - Development Classification *Figure 5.4: Extract from Rivers and Sea Flood Map *Figure 5.5: Location of Extreme Water Levels *Figure 6.1: Surface Waterbodies within the Vicinity of the Proposed Development *Figure 7.1: Designated Nature Conservation Areas in Fishguard Harbour and the Wider Area *Figure 7.2: The Distribution of Intertidal Biotopes Identified as Part of the Fishguard Harbour Littoral Biotope Mapping Survey (Aquatic Environments, 2011) *Figure 7.3: The Distribution of Subtidal Biotopes Identified as Part of the Fishguard Drop-Down Video Survey (Aquatic Environments, 2015) *Figure 7.4: The Location of Grab Samples and the Habitats Recorded in the Proposed Replacement Linkspan Marine Ecology Surveys (ABPmer, 2017) *Figure 7.5a: Spawning and Nursery Grounds in Fishguard Bay *Figure 7.5b: Spawning and Nursery Grounds in Fishguard Bay *Figure 7.6: Electro-fishing counts of migratory fish on the river Gwuan as part of NRW fish monitoring *Figure 8.1: West Wales Marine cSAC *Figure 8.2: Habitat Survey Results *Figure 8.3: Breeding Bird Survey Results *Figure 9.1: Location of Existing Port Access (Source Google Maps) *Figure 9.2: Illustration of Existing Port Roundabout Access (Google Maps) *Figure 9.3: MS Stena Europe Currently Operational at Fishguard Harbour *Figure 9.4: 2-Way Traffic Flows at Fishguard Harbour Access – Tuesday 28 November 2017 and Friday 1 December 2017 – 07:00 to 19:00 *Figure 9.5: Proposed Reconfigured Access Junction Associated with the Committed Marina Development *Figure 9.6: Extracts from the TA for the Committed Marina Scheme Figure 10.1: Sensitive Air Quality Receptors and Distance Bandings Environmental Statement February 2018 Replacement Linkspan, Fishguard Port *Figure 10.2: Ambient Pollution Trends in Wales 1990-2016 (From the Air Pollution in Wales 2016 Report *Figure 10.3a: Nitrogen Dioxide (From the Air Pollution in Wales 2016 Report *Figure 10.3b: Ozone (From the Air Pollution in Wales 2016 Report) *Figure 10.3c: Particulate Matter 10 (PM10) (From the Air Pollution in Wales 2016 Report) *Figure 10.3d: Particulate Matter 2.5 (PM2.5) (From the Air Pollution in Wales 2016 Report) *Figure 10.4: Location of Defra Background point and site location circled (From –http://gridreferencefinder.com) *Figure 10.5: Emissions by Local Authority 2014 *Figure 10.6: Emissions Time Series for Pembrokeshire Figure 11.1: Noise Sensitive Receptor Locations Figure 11.2: Background Noise Monitoring Locations Figure 11.3: Noise Contour *Figure 12.1: Waste Management Hierarchy *Figure 13.2: Bedrock Geology *Figure 13.2: Superficial Geology *Figure 13.3: Infilled or Made Ground *Figure 13.4: Bedrock Aquifer *Figure 13.5: Groundwater Vulnerability *Figure 13.6: Hydrology * Figure 13.7: Ground Investigation Locations Figure 14.2: Details from Admiralty Chart showing Fishguard Harbour with location/ extent of proposed development superimposed Figure 14.3: Historic images of Fishguard Harbour (including images 14.3a and 14.3b) Figure 14.4: Details from historic Ordnance Survey maps of Fishguard Harbour (including images 14.4a and 14.4b) Figure 14.5: Known cultural heritage sites located within proximity of the proposed development and considered in this study (including images 14.3a and 14.3b) Figure 15.1: Designations and Site Context Figure 15.2: LANDMAP Aspect Areas Figure 15.3: Landscape Character Areas Figures 15.4a – 15.4g: Viewpoints Environmental Statement February 2018 Replacement Linkspan, Fishguard Port *Figure 16.1: Fishguard Location *Figure 16.2: Fishguard and Goodwick *Figure 16.3: Existing Linkspan Location *Figure 16.4: Extract of Pembrokeshire County Council Local Development Plan Environmental Statement February 2018 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    6 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us