What's Going on at Gateway

What's Going on at Gateway

What’s Going on at Gateway Airport Status Update & Future Development Plans Arizona ITE-IMSA Spring Conference February 27, 2020 2019 Arizona Airport of the Year Phoenix-Mesa Gateway Airport Phoenix-Mesa Gateway Airport Hawes Crossing- Mixed-use Ellsworth- Point 22- Gallery Park- The Landings- Mixed-use Eastmark Mixed-use Light Industrial Cadence CGCC Campus ASU Polytechnic Campus Gilbert Planned ASU Public Safety Research Training Park Facility Light Industrial/Logistics Commercial Passenger Airlines Nonstop Route Map MORE THAN 45 NONSTOP DESTINATIONS Allegiant Swoop WestJet Military Training Operations Pilot Training, Corporate & GA Activity OEM/MRO Facilities Southwest Business Jet Cessna/Citation/Hawker Beechcraft Able Aerospace Services Embraer Areas for Future Development Gateway Executive Park Northeast (17± Acres) Development Area (700± Acres) SkyBridge Arizona (360± Acres) Active Development Projects Terminal Food & Beverage Concessions Lots 11 - 14 Development Project Lot 18 Development Project Lot 37 Development Project Able Aerospace Services Expansion SkyBridge Arizona 53,000 SF Flex Industrial Building 82,000 SF Aircraft Hangar Northeast Development Area Non-Aeronautical Development Aeronautical Development Airport Master Plan Update Airport Master Plan- FAA Approved Forecast Enplanement Forecast: 2023 2028 2038 2018 Total = 763,542 2019 Total = 886,508 924,667 1,022,420 1,245,211 Total Operations Forecast: 2023 2028 2038 2019 Total= 278,863 316,712 333,028 369,744 Total Based Aircraft Forecast: 2023 2028 2038 Recent Total = 109 121 126 139 Capital Improvement Projects - Phasing Plan Capital Improvement Projects - Short & Mid-Term Capital Improvement Projects - Source & Use Summary • FAA AIP Grants are largest proposed funding source • Importance of Passenger Facility Charge (PFC) • No debt issuance planned • Runway/taxiway projects are primary use of funding • Maximizing west side terminal lifespan • Relocate existing radar facility (ASR) Capital Improvement Projects - Long-Term • 2031-2041 projects focus on the east side – Aeronautical/terminal development & support facilities – No funding plan due to speculation this far out New Air Traffic Control Tower State Grant Awards 1996 - 2018 Thank You! Questions? 2019 Arizona Airport of the Year.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    27 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us