Fort Saskatchewan Fact Sheet

Fort Saskatchewan Fact Sheet

FORT SASKATCHEWAN FACILITY Headquartered in Calgary with operations in Western Canada and Hull, Texas, KEYERA operates an integrated Canadian-based midstream business with extensive interconnected assets and depth of expertise in delivering midstream energy solutions. Our business consists of natural gas gathering and processing, natural gas liquids (NGLs), fractionation, transportation, storage and marketing, iso-octane production and sales and diluent logistic services for oil sands producers. We are committed to conducting our business in a way that balances diverse stakeholder expectations and emphasizes the health and safety of our employees and the communities where we operate. Fort Saskatchewan Facility Located in “Alberta’s Industrial Heartland”, Keyera’s Fort Saskatchewan facilities include an NGL processing plant, storage facilities and four pipelines connecting to the Edmonton Terminal. PROJECT HISTORY The NGL processing plant receives NGL feedstock from various sources and splits the NGL mix into saleable products. The 1972 Constructed storage facilities consist of underground storage caverns and 1985 Connected to Cochin, Peace and surface storage that holds NGL mix feedstock and specification Federation Pipelines NGLs. The pipeline system transports NGL mix to the Fort 1993 Dow Fort Saskatchewan tied in to Saskatchewan facilities and saleable specification NGLs from Fort Saskatchewan Pipeline System these facilities, as well as other NGL processing and storage facilities in the area, to the Edmonton Terminal for distribution to 2004 Keyera became operator markets and export rail, truck and pipelines. 2008 Truck facility expanded and leased fourth NGL pipeline between Edmonton Terminal and Fort Saskatchewan facility 2015 De-ethanizer and fourth brine pond completed 2016 Fractionation expansion and 14 th storage cavern completed Main : 780-998-3791 24-hour emergency: 780-992-2900 www.keyera.com FACILITY SPECIFICATIONS (Gross) CONNECTED PIPELINES OWNERSHIP INTEREST Fractionation 65,200 Bbls/d Alliance Pipeline Keyera (Operator) 76.7% AEGS (Alberta Ethane Gathering System) De-ethanizer 30,000 Bbls/d Pipeline ExxonMobil Canada Energy 1.99% Storage 12,460,990 Bbls/d Cochin Pipeline Plains Midstream Canada ULC 21.3% Pipelines 407,100 Bbls/d Dow/Shell Pipeline Federated Pipeline FSPL (four lines between Ft. Sask. and Keyera Edmonton Terminal) FORT SASKATCHEWAN FACILITY Last Updated March 2018 FORT SASKATCHEWAN FACILITY 780-998-3791 PLANT LOCATION GPS - DECIMAL 53.745811, -113.166770 DEGREES 53°44'44.9"N 113°10'00.4"W LEGAL SITE DESCRIPTION 02-14-55-22 W4M Main : 780-998-3791 24-hour emergency: 780-992-2900 www.keyera.com FACILITY CONTACTS Plant Director John Parfett 780-992-2921 Area Superintendent, Operations Tom Bachman 780-992-2918 Facility Administrator Janet Wilson 780-992-2908 MAILING ADDRESS Fort Saskatchewan 12310 River Road Fort Saskatchewan, AB T8L 2T2 FORT SASKATCHEWAN FACILITY Last Updated March 2018.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us