Inverness Airport

Inverness Airport

INVERNESS AIRPORT CON STRUCT ACCESS AN D UTILITIES TO HAN GARS, FY 2018 REHABILITATE AN D RECON STRUCT TAXILAN ES, FY 2018 CON STRUCT 10,000 SQUARE FOOT HAN GAR, FY 2019 AIRCRAFT RUN -UP FOR RUN W AY 1, FY 2020 PORT CITRUS 488 CON STRUCT TAXIW AY TO T HAN GARS (P HASE 1 OF 2), FY 2020 LK DESIGN AN D CON STRUCT V EHICLE P ARKIN G FOR T-HAN GARS, FY 2020 39 MAIN TEN AN ACE AN D REMARKIN G OF RUN W AY/TAXIW AY, FY 2020 KL REHABILITATE AIRFIELD SECURITY FEN CIN G AN D GATES, FY 2021 cJ TAXILAN ES FOR T-HAN GARS, FY 2022 QR200 CRYSTAL RIVER AIRPORT ACQUIRE P ARCELS N OF RUN W AY 18 – P HASE 1, FY 2018 CON STRUCT HAN GAR W ITH AP RON AN D TAXILAN E, FY 2018 581 44 486 LK ACQUIRE P ARCELS N ORTH OF RUN W AY 18, FY 2019 KL LK CON STRUCT HAN GAR, FY 2019 98 IMP ROV E AN D REP AIR AIRFIELD SECURITY FEN CIN G, FY 2020 ¤£ IN STALL LIGHTED AIRFIELD SIGN AGE, FY 2020 AIRCRAFT P ARKIN G AP RON , FY 2021 q® QR44 LK490 CITRUS q® ¤£41 491 LK LK581 ZEPHYRHILLS AIRPORT RECON STRUCT AN D REHABILITATE TAXIW AY A P AV EMEN T, FY 2018 LK480 39 REHAB TAXIW AY AN D TERMIN AL RAMP , FY 2018 £98 KL SEAL AIRFIELD P AV EMEN T – AP RON S, FY 2018 ¤ CON STRUCT ACCESS ROAD TO SOUTHEAST DEV ELOP MEN T, FY 2019 CON STRUCT N EW ROTATIN G AIRFIELD BEACON , FY 2019 BROOKSVILLE-TAMPA BAY REGIONAL AIRPORT P OLYUREA COATIN G ON T-HAN GAR ROOFS, FY 2019 CON STRUCT T/CORP ORATE HAN GARS, FY 2018 DESIGN AN D CON STRUCT P ARALLEL TAXIW AY, FY 2020 RECON STRUCT EAST GA AP RON , FY 2018 MASTER P LAN UP DATE, FY 2020 RUN W AY EN D CON N ECTOR, FY 2018 HERNANDO 700 REHABILITATE TAXIW AY A P AV EMEN T, FY 2020 SECURITY EN HAN CEMEN TS, FY 2019 QR N EW FBO AN D P ARKIN G LOT, FY 2021 REHABILITATE RUN W AY 03-21, FY 2020 SELF FUELIN G AREA, FY 2021 W ESTSIDE IN FRASTRUCTURE, FY 2021 W ILDLIFE HAZ ARD REMEDIATION , FY 2021 LK480 LK550 QR50 LK581 ¤£98 QR50 75 572 ¨¦§ LK589 LK q® ¤£301 TAMPA INTERNATIONAL AIRPORT ACCESS CON TROL SYSTEM REP LACEMEN T, FY 2018 LK578 98 EMP LOYEE SURFACE P ARKIN G EXP AN SION , FY 2018 ¤£ GEORGE BEAN P ARKW AY/BESSIE COLEMAN SRV RD, FY 2018 KL41 LON G TERM P ARKIN G GARAGE LEV EL 3 REHAB, FY 2018 LON G TERM P ARKIN G GARAGE LEV EL 4 REHAB, FY 2018 RAMP BLUE (US AIR) CON CRETE/SLAB REHAB, FY 2018 RAMP FEDEX/EMORY AN D TAXIW AY K, FY 2018 RAMP RED (DELTA) CON CRETE/SLAB REHAB, FY 2018 STRUCTURAL AN D P AV EMEN T IN SP ECT & DESIGN , FY 2018 GATEW AY CEN TER - AUTOMATED P EOP LE MOV ER, FY 2018, 2019 AIRFIELD SLAB REP LACEMEN T, FY 2019 AIRSIDE F ROOF REP AIR, FY 2019 CARGO P ARKIN G LOT REHABILITATION , FY 2019 52 CON STRUCT CROSSFIELD TAXIW AY M, FY 2019 589 QR TAXIW AY B SHOULDER REHABILITATION , FY 2019 QR TAXIW AY T AN D CORP ORATE ROAD, FY 2019 98 AIRSIDE A BOARDIN G BRIDGES, FY 2020 1 587 ¤£ AIRSIDE A ROOF REP AIR, FY 2020 KL LK REHAB RUN W AY 10/28 E OF RUN W AY 19L, FY 2020 AERIAL SURV EY OF RUN W AY AP P ROACHES, FY 2021 AIRP ORT OP ERATION S DATA BASE, FY 2021 KL77 KL54 BAGGAGE HAN DLIN G SYSTEMS SERV ERS, FY 2021 PASCO LAN DSIDE ELEV ATOR REP LACEMEN TS, FY 2021 LAN DSIDE FIRE SUP P RESSION SYSTEM REFURB, FY 2021 54 q® P HASE 2 AN D 3 MASTER P LAN P ROJECTS, FY 2021 QR RAMP A CON CRETE JOIN T AN D SLAB REHAB, FY 2021 19 STRUCTURAL AN D P AV EMEN T REP AIRS, FY 2021 ¤£ AIRFIELD SLAB REP LACEMEN T, FY 2022 QR54 STRUCTURAL AN D P AV EMEN T IN SP ECTION , FY 2022 CLEARWATER AIRPARK HILLSBOROUGH AIRP ORT GROUN D SUP P ORT EQUIP MEN T REP LACEMEN T, FY 2018 QR597 275 REP LACE HAN GAR C, FY 2019 587 ¨¦§ CON STRUCT MULTIP LAN E HAN GAR, 2020 LK 39 75 QR SECURITY SYSTEM UP GRADE, FY 2021 ¨¦§ QR582 LK589 q® ¨¦§4 ¤£92 580 92 Gulf of Mexico 590 ¤£ QR QR 574 q® QR PLANT CITY AIRPORT q® E3X9P AN D HAN GAR FACILITIES, FY 2019 60 q® QR QREHABILITATE MAIN TEN AN CE FACILITY, FY 2019 AP RON REHABILITATION , FY 2020 19 AW OS REP LACEMEN T, FY 2020 ST PETERSBURG/CLEARWATER INTERNATIONAL AIRPORT 60 ¤£ QR CON STRUCT N EW FUEL FARM, FY 2020 SECURITY SYSTEM REHAB, FY 2018 I6 676 HAN GAR E REHABILITATION , FY 2020 TICKETIN G "A", FY 2018 275 QR TAXILAN E AN D AP RON REHABILITATION , FY 2020 RUN W AY 18/36 AN D TAXIW AY, FY 2019 q® ¨¦§ ® q RUN W AY 10/28 REILS REP LACEMEN T, FY 2022 AIRFIELD DRAIN AGE REHAB, FY 2020 RUN W AY REHABILITATION , FY 2022 AP RON EXP AN SION SEP ARATION , FY 2020 686 640 CON STRUCT BUILDIN G, FY 2020 QR 92 LK REHABILITATE RUN W AY 4/22, FY 2021 19A ¤£ TAXIW AY T EXP AN SION , FY 2021, 2022 ¤£ TAMPA EXECUTIVE AIRPORT 694 RUN W AY 5/23 AN D ASSOCIATED TAXIW AY, FY 2018 699 QR RUN W AY 5/23 MALSR LIGHT P OLES REP LACEMEN TS, FY 2018 QR RUN W AY 5/23 P AP I REP LACEMEN T, FY 2018 RUN W AY 5/23 REHABILITATION , FY 2018 PINELLAS RUN W AY 5/23 REILS REP LACEMEN T, FY 2018 ALBERT WHITTED AIRPORT 41 TAXIW AKLY3 C9 REHABILITATION , FY 2018 REP LACEMEN T OF T-HAN GAR BUILDIN GS, FY 2018 ¤£ TAXIW AY D REHABILITATION , FY 2018 DESIGN AN D CON STRUCT HAN GARS, FY 2019 581 301 TAXIW AY E REHABILITATION , FY 2018 MASTER P LAN UP DATE, FY 2019 LK Tampa Bay ¤£ TAXIW AY F REHABILITATION , FY 2018 672 FIRE SUP P RESSION SYSTEM REHABILITATION , FY 2019 DESIGN OF P AP I AN D REILS FOR RUN W AY 18/36, FY 2020 ® 75 LK q REHABILITATE MAIN TEN AN CE FACILITY, FY 2019 DESIGN OF RUN W AY 18/36 AN D STUB CON N ECTORS, FY 2020 ¨¦§ CON STRUCT P AP IS/REILS FOR RUN W AY 18/36, FY 2021 REHABILITATE SERV ICE ROAD, FY 2019 CON STRUCT RUN W AY 18/36 AN D STUB CON N ECTORS, FY 2021 699 REHABILITATE TERMIN AL BUILDIN G, FY 2019 REHAB AIRFIELD V AULT, FY 2022 QR RUN W AY P ROTECTION Z ON E TREE TRIMMIN G, FY 2019 I6 AW OS REP LACEMEN T, FY 2020 674 FUEL FARM REHABILITATION , FY 2020 QR TERMIN AL CHILLER SYSTEM REP LACEMEN T, FY 2020 HAN GAR 3700/A REHABILITATION , FY 2021 PORT ST. PETERSBURG 679 579 HAN GAR 3800/B REHABILITATION , FY 2021 IN FRASTRUCTURE IMP ROV EMEN TS, FY 2018 QR LK 275 RUN W AY 18/36 P AP I LIGHT REP LACEMEN T, FY 2021 ¨¦§ RUN W AY 18/36 REIL LIGHT REP LACEMEN T, FY 2021 RUN W AY P ROTECTION Z ON E TREE TRIMMIN G, FY 2022 LK679 PETER O. KNIGHT AIRPORT RUN W AY 18/36 REHABILITATION , FY 2018 TAXIW AY F REHABILITATION , FY 2018 REHABILITATE MAIN TEN AN CE FACILITY, FY 2019 REP AIR SEAW ALL, FY 2019 AP RON REHABILITATION , FY 2020 PORT TAMPA BAY AW OS REP LACEMEN T, FY 2020 EASTP ORT BERTH DEV ELOP MEN T, FY 2018 ² HAN GAR B REHABILITATION , FY 2020 HOOKERS P OIN T CARGO BERTH IMP ROV EMEN TS, FY 2018 TAXIW AY B REHABILITATION , FY 2020 P ORT SUTTON IN TERMODAL IMP ROV EMEN TS, FY 2018 TAXIW AY D REHABILITATION , FY 2020 P ORT SUTTON CARGO BERTH IMP ROV EMEN TS, FY 2018 TIE DOW N AREA E REHABILITATION , FY 2020 EASTP ORT UP LAN D CARGO IMP ROV EMEN TS, FY 2019 0 2 4 6 8 10 HAN GAR S REHABILITATION , FY 2021 HOOKERS P OIN T IN TERMODAL IMP ROV EMEN TS, FY 2019 Mile s FLORIDA DEPARTMENT OF TRANSPORTATION Airport and Seaport Projects DISTRICT SEVEN DRAFT TENTATIVE FIVE-YEAR WORK PROGRAM FOR FY 2018 THROUGH FY 2022 MAP AS OF N OV EMBER 2016 JULY 1, 2017 THROUGH JUNE 30, 2022 FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT SEVEN.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us