Pre – Feasibility Report for Establishment of Proposed

Pre – Feasibility Report for Establishment of Proposed

PRE – FEASIBILITY REPORT FOR ESTABLISHMENT OF PROPOSED MOLASSES BASED 60.0 KLD DISTILLERY (ETHANOL) ALONGWITH 2.2 MW POWER COGENERATION AT VILLAGE: GANGADHARPUR TEHSIL: CHANDAUSI, DISTRICT: SAMBHAL, STATE: UTTAR PRADESH. BY M/S, VENUS SUGAR LIMITED. PROPOSED 60.0 KLPD MOLASSES BASED DISTILLERY ALONG WITH 2.2 MW CO-GENERATION POWER PLANT AT VILL: GANGADHARPUR, TEHSIL: CHANDAUSI, DISTRICT: SAMBHAL U.P. 2 PRE - FEASIBILITY REPORT 1. Executive Summary (I) Introduction Ethyl Alcohol commonly known as Ethanol with the molecular formula of C2H5OH, is an important organic compound which has wide use in industrial applications as fuel for internal combustion engine eosin das an intoxicate in ingredient of alcohol is beverages. In the Industrial applications it is used as solvents and in the synthesis of varied organic chemical slice acetaldehyde, acetic acid, benzene, PVC etc. Even though the major consumption as of now is for alcoholic beverages, Ethyl alcohol has the potential to fuel the future relegate in gasoline to a secondary place. Brazil has pioneered the blending of Ethyl Alcohol with gasoline to be used as automotive fuel, followed by United States of America and many other countries. Many countries, including India, have implemented policies to ensure that the bio-fuels become important element of their transport fuel mix .Bio-ethanol, unlike petroleum, is a form of renewable energy, that can be produced from agricultural feed stocks .Ethanol can be produced from several raw materials like Sugarcane or Sugar beet, molasses, Cassava Starch, Starch from Rice, Maize and other grains. Concerns about its production, from raw materials other than sugar cane molasses, relate to increased food prices, the large amount of arable land required for crops etc. However the latest developments with cellulosic than of production may all ay some of these concern relating to the food security. India’ stealing stalled ethyl alcohol production capacity is 4 billion liters perineum in about a total of 350 Distilleries. The installed production capacity for anhydrous alcohol is 2 billion liters per annum. Most of the alcohol produced in India is from cane molasses and grains contributing to only a small fraction of the production for potable alcohol. With the cane supplies diminishing in the last two or three years the production of alcohol had also come down. The average annual consumption had remained data round 3 Million liters with Industrial, potable, gasohol and other segments contributing 35%, 55%, 5% and 5% respectively. The notification to blend 5% alcohol with gas online was made out in 2002; the 5% blend in was made mandatory on lying 2007. Later the Government of India mandated 10% blending of alcohol with gas online from October 2009.The Government of India had planned to achieve 20% blending by 2017. However, due to the vagaries in the price of oil, reduction in the production of alcohol due to less cane cult ovation etc the policy of blending could not be implement in full. As against the consumption of about 1050 Million Liters perineum for 5% blending and about 2100 Million Liters for 10% blending the consumption had been only around 100Million Liters in the last year. However this scenario will change for the better as the whole world is now moving towards bio fuels. With PRE FEASIBILITY REPORT VENUS SUGAR LIMITED PROPOSED 60.0 KLPD MOLASSES BASED DISTILLERY ALONG WITH 2.2 MW CO-GENERATION POWER PLANT AT VILL: GANGADHARPUR, TEHSIL: CHANDAUSI, DISTRICT: SAMBHAL U.P. 3 Brazil and USA showing the way increasing concerns about the environmental degradation and with the oil prices set-to increase ultimately, we will be left with no option other than to increase our ethanol production and go with higher percentage of blending. In addition the potable alcohol consumption has been steadily increasing at the rate of 5 to 7% perineum. Presently many of the organic chemicals that are synthesized from petroleum feed stock due to the price advantage will eventually shift to ethanol feed stock as the crude price has increased. As per EIA Notification dated 14th Sep., 2006 and as amended from time to time; the project falls in Category ‘A’, Project or Activity - 5(g). TABLE – 1 Salient Features of the Project Sr Particulars Details No 1 Nature and Size of Project Proposed 60.0 KLPD Molasses Based Distillery project alongwith 2.2 MW Co gen power. 2 Category of the Project As per EIA Notification dated 14th Sep., 2006 as amended from time to time; the project falls in Category ‘A’, Project or Activity - 5(g). 3 Locations Details Village / Location Gangadharpur Tehsil Chandausi District Sambhal State Uttar Pradesh Latitude 28°25'58.50"N Longitude 78°42'22.60"E Toposheet No 53L/11, 53L/15 L/10 and 53L/14 4 Area Details Total Plant Area Total land for proposed Distillery – 8.760 Hectare Greenbelt / Plantation Area ~33% of the project area will be covered under green belt plantation of 2.89 Hectare. 5 Environmental Setting Details (with approximate aerial distance & direction from plant site) Nearest Village Gangadharpur – 0.98 km in West Direction Sainjni – 0.82 km in South East direction. Nehta – 1.44 km in East direction. Bajhawali – 1.54 km in North direction Nearest Town & City Channdausi 7.25 km in East direction. Nearest National Highway / State National Highway-93 (0.5 km in West to Highway north direction ) PRE FEASIBILITY REPORT VENUS SUGAR LIMITED PROPOSED 60.0 KLPD MOLASSES BASED DISTILLERY ALONG WITH 2.2 MW CO-GENERATION POWER PLANT AT VILL: GANGADHARPUR, TEHSIL: CHANDAUSI, DISTRICT: SAMBHAL U.P. 4 Nearest Railway station Bahjoi Railway Railway Station (8.40 km in South West direction) Chandausi jn Railway Station 7.58 km East direction. Nearest Airport Indira Gandhi International Airport New Delhi (~157.2 km in west direction) National Parks, Reserved Forests No National Parks, Reserved Forests (RF)/ (RF)/ Protected Forests (PF), Wildlife Protected Forests (PF), Within 10Km Sanctuaries, Biosphere Reserves, radius. Tiger/ Elephant Reserves, Wildlife Corridors etc. within 10 km radius River / Water Body Ganga River – 41.80 km in west direction (within 10 km radius) 6 Cost Details Total Project Cost Rs 10875.00 Lakh Cost for Environment Management Capital Cost : Rs 2216.0 Lakh Plan Recurring cost : Rs 350 Lakh /Annum 7 Basic Requirements for the project Fresh Water Requirement 360.0 KLPD Source – Groundwater Power Requirement Total Power connected load 2255 KW. Man Power Requirement 120 (Source:- Unskilled / Semi-Skilled - Local Area; Skilled- Local & Outside) 8 Product Mix Ethanol /Rectified Spirit ENA, AA, Pharma Grade. 9 Working Days 360.0 Days 2.0 Identification of project and project proponent Venus Sugar Limited is having cane crushing plant of capacity 3500.0 TPH at Village: Gangadharpur, Tehsil- Chandausi Dist – Sambhal Uttar Pradesh. In order to ensure growth of the Group management of VSL is planning to establish a 60 KLD Molasses based distillery plant along with 2.2 MW Co gen power at village: Gangadharpur, Tehsil- Chandausi, Dist – Sambhal Uttar Pradesh. 2.1 Brief description of the project The present proposal is for setting up a 60 KL. per day Molasses Base Distillery with cogeneration of power (2.2 MW) at village: Gangadharpur, Tehsil- Chandausi Dist – Sambhal in the State of Uttar Pradesh. PRE FEASIBILITY REPORT VENUS SUGAR LIMITED PROPOSED 60.0 KLPD MOLASSES BASED DISTILLERY ALONG WITH 2.2 MW CO-GENERATION POWER PLANT AT VILL: GANGADHARPUR, TEHSIL: CHANDAUSI, DISTRICT: SAMBHAL U.P. 5 Table 2.1, Project Highlights Sr No Name of the proponent M/s. Venus Sugar Limited. 1 Location of the project Village; Gangadharpur, Tehsil: Chandausi, Dist.-Sambhal Uttar, Pradesh. 2 Land Total land allocated : 8.760 Hectare 3 Project 60.0 KLPD Distillery along with 2.2 Co generations Project. 4 Product Rectified Spirit / Extra Neutral alcohol. 5 Operation days per annum 360.0 Days 6 Main Raw Material Molasses based 7 Total Water Requirement 360 KLD @ 6.0 KL/ KL of Alcohal. 8 Fuel Slop 148.0 TPH & Bagasse 128.0 TPH 9 Steam 16.2 TPH 10 Effluent Treatment System Spent wash will be concentrated in Multi effect evaporation and then used as fuel in incineration boiler. Secondary effluent like MEE condensate and Blow down will be used treated in Secondary ETP. 11 Manpower 120.0 Number 12 Total Project Cost 10875.0 Lakhs 13 Capital expenses for Environment 2216.0 Lakhs management 2.3 Need of project and its importance to the country and region The company proposes to manufacture RS/Absolute Alcohol from Molasses. There is a gap of 462 million litres between demand and supply of alcohol in India. Use of Ethanol for fuel blending has further reduced the supply of portable alcohol. The company plans on using 287 TDP of Molasses per day to manufacture portable alcohol Demand and Supply gap. Alcohol is an extremely important product in today’s economy. It is used to produce alcoholic beverages such as IMFL/Country Liquor which is a major source of revenue for the government by levying excise duty. It is also used in the production of a number of chemicals. Alcohol is also PRE FEASIBILITY REPORT VENUS SUGAR LIMITED PROPOSED 60.0 KLPD MOLASSES BASED DISTILLERY ALONG WITH 2.2 MW CO-GENERATION POWER PLANT AT VILL: GANGADHARPUR, TEHSIL: CHANDAUSI, DISTRICT: SAMBHAL U.P. 6 used in blending petrol and diesel and has potential as a fuel. Hence the present supply cannot meet the demand. In India, mainly three types of alcohol are popularly produced, i.e. rectified spirit (RS), extra neutral alcohol (ENA) and anhydrous alcohol (AA). Of these, RS is used for large number of industrial, scientific, laboratory, medical and many other applications. Thus, demand for the same is immense and it is ever increasing.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    23 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us