Railway Sector Investment Program

Railway Sector Investment Program

Social Monitoring Report Semiannual Monitoring Report October 2017-March 2018 July 2018 IND: Railway Sector Investment Program Prepared by Ministry of Railways for the Government of India and the Asian Development Bank. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Indian Government Ministry of Railways Asian Development Bank Multitranche Financing Facility No. 0060‐IND Loans No. 2793‐IND, 3108‐IND Railway Sector Investment Program Track Doubling and Electrification on Critical Routes Resettlement and Rehabilitation Implementation Status Semi Annual Report October 2017 ‐ March 2018 Egis Rail – Egis India R&R Implementation Status No. 10 March 2018 1. Introduction and Project Background ................................................................................................ 1 Contents 2. Legal and Policy Frame Work ............................................................................................................. 3 3. Insitutional arrangement and implementation mechanism .............................................................. 4 4. Greivance Rederess Committee ......................................................................................................... 6 5. Progress on Subprojects..................................................................................................................... 6 5.1 Global Progress ....................................................................................................................... 6 5.2 Important events related to R&R from October to March 2018. ........................................... 6 5.3 NGO – Assistance to RVNL ...................................................................................................... 7 5.3.1 NGO contract for Sambalpur‐Titlagarh project ............................................................................. 7 5.3.2 NGO contract for Raipur‐Titlagarh project .................................................................................... 7 5.3.3 Assistance for Hospet‐Tinaighat project ........................................................................................ 7 5.4 General Consultant ................................................................................................................. 7 5.5 Daund‐Gulbarga (Maharashtra Section and Karnataka Sections) .......................................... 8 5.6 Sambalpur–Titlagarh project .................................................................................................. 8 5.7 Raipur‐Titlagarh project ........................................................................................................ 17 5.8 Hospet‐Tinaighat project ...................................................................................................... 17 5.9 Electrification of Pune‐Guntakal project ............................................................................... 24 6. Summary table ................................................................................................................................. 25 Annexure I: LA Direct purchase Act Government of Karnataka ........................................................... 33 Annexure II: Notification issued by Odisha Revenue Department ....................................................... 35 Annexure III: Approved note for extension of R&R personals .............................................................. 36 Annexure IV: R&R Sale Deed of registerd land under direct purchase Hospet‐Tinaighat project ...... 38 Annexure V: Direct purchase payment details of Gadag village in HT project ..................................... 43 Annexure VI: Roll Diagram of Sambalpur‐Titlagarh project ................................................................. 44 Annexure VII: R&R photographs of landowners registration of Hospet‐Tinaighat project .................. 46 Annexure VIII: R&R photographs of ST project showing dismantling of TH structures ........................ 47 Table 1: Payment details of ST and HT projects ..................................................................................... 7 Table Table 2: Mobilization of GC Social Expert ............................................................................................... 7 Table 3: Requirement of land acquisition as estimated under ST project ............................................ 10 Table 4: Land Acquisition issues of ST project ...................................................................................... 14 Table 5: Land Acquisition issues of ST project ...................................................................................... 15 ADB Loans No. 0060‐IND / 2793‐IND, 3108‐IND ii Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes Egis Rail – Egis India R&R Implementation Status No. 10 March 2018 Table 6: Details of payment towards LA for Sambalpur‐Titlagarh ........................................................ 16 Table 7: List of Land Owners compensated for Direct Purchase .......................................................... 18 Table 8: Status of land acquisition in HT ............................................................................................... 20 Table 9: Financial status of compensation in HT .................................................................................. 22 Table 10: Summary of Land Acquisition in HT ...................................................................................... 23 Table 11: Status of land compensation in HT ....................................................................................... 24 Table 12: Status of land Acquisition and Resettlement ........................................................................ 29 Table 13: Details regarding Rehabilitation and Resettlement .............................................................. 32 Figure 1: Map of India showing track doubling and electrification projects .......................................... 2 Figure ADB Loans No. 0060‐IND / 2793‐IND, 3108‐IND iii Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes Egis Rail – Egis India R&R Implementation Status No. 10 March 2018 Abbreviation ADB Asian Development Bank BPL BelowPovertyLine CPM Chief Project Manager DG Daund – Gulbarga DGPS Differential Global Position System DM District Magistrate DPs Displaced Persons EA Executing Agency FHH Female Headed Household GAD General Arrangement Drawing GC General Consultant GCC General Conditions of Contract GRC Grievance Redressal Cell HT Hospet – Tinaighat HHs House Holders IA Implementing Agency India Indian Government INR Indian Rupees IP Indigenous People IPP Indigenous Peoples Plan IPPF Indigenous Peoples Planning Framework IR Inception Report LAO Land Acquisition Officer MOR Ministry of Railways NEFT National Electronic Funds Transfer NGO Non‐Governmental Organisation NTH Non‐Title Holder OSRC Orissa Space Applications Centre PAP/APs Project Affected Persons PG Pune – Guntakal PMC Project Management Consultant PWD Public Works Department RAP Resettlement Action Plan RFCTLARR Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act R&R Resettlement and Rehabilitation RO Resettlement Officer RP Resettlement Plan RT Raipur – Titlagarh RTGS Real Time Gross Settlement RVNL Rail Vikas Nigam Limited SC Scheduled Caste ADB Loans No. 0060‐IND / 2793‐IND, 3108‐IND iv Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes Egis Rail – Egis India R&R Implementation Status No. 10 March 2018 SIA Social Impact Assessment SLAO Special Land Acquisition Officer ST Scheduled Tribe ST Sambalpur – Titlagarh TH Title Holder USD United States Dollars ADB Loans No. 0060‐IND / 2793‐IND, 3108‐IND v Railway Sector Investment Program – Track Doubling and Electrification on Critical Routes Egis Rail – Egis India R&R Implementation Status No. 10 March 2018 1. Introduction and Project Background 1.1 Introduction A Framework Financing Agreement (FFA) was signed on 8 July 2011 between the Indian Government (India) and the Asian Development Bank (ADB) for the implementation, through the Ministry of Railways (MOR), of the Railway Sector Investment Program (RSIP) which is an integral part of the investment program of MOR. A Multi Tranche Financing Facility (MFF) has been approved by ADB on 31 August 2011; MFF is intended to finance individual projects of RSIP. Railway improvement component of RSIP consist of doubling of about 840 km rail routes and electrification of 640 km rail route along high density corridors. The scope of projects is to provide a second line along the existing single line by constructing the roadbed and either extending or constructing new bridges, provision of facilities for passenger and staff, providing and laying track, signalling and telecommunications and general electrical works. The scope of the electrification project is to provide overhead Railway electrification in the Pune‐Wadi‐Guntakal double line section. The purpose of the

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    55 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us