
SFFD | NEW FIRE BOAT STATION 35 AT PIER 22.5 PRESENTATION TO SAN FRANCISCO FIRE COMMISSION – JUNE 14, 2017 CITY HALL, 1 DR. CARLTON B. GOODLETT PLACE, ROOM 416, SAN FRANCISCO, CA 94102 AGENDA: • Bond Seismic Improvement Program • Project Approach • Project History • Design-Build Procurement Building Design & Construction NEW FIRE BOAT STATION 35 AT PIER 22.5 Project Management San Francisco Fire Commission | June 14, 2017 1 ESER 2014 BACKGROUND ESER Program Project Map $400M General Obligation Bond authorized in June 2014 with approval by 79% of voters • Neighborhood Fire Stations $85M • Emergency Firefighting Water System $55M • District Police Stations and Infrastructure $30M • Motorcycle Police and Crime Lab $165M • Medical Examiner Facility $65M *Total ESER and PHS funding for SFFD bond funded projects: $172M Building Design & Construction NEW FIRE BOAT STATION 35 AT PIER 22.5 Project Management San Francisco Fire Commission | June 14, 2017 2 Project: AERIAL PHOTO OF EXISTING SITE Building Design & Construction NEW FIRE BOAT STATION 35 AT PIER 22.5 Project Management San Francisco Fire Commission | June 14, 2017 3 SEA LEVEL RISE BARGE FLOATING STRUCTURE Building Design & Construction NEW FIRE BOAT STATION 35 AT PIER 22.5 Project Management San Francisco Fire Commission | June 14, 2017 4 SITE HISTORY 2006 1987 • Fireboat Headquarters Building listed as • Storage Shed on the Fireboat Pier contributing resource of constructed by San Francisco Port the POSF Embarcadero Commission Department of Engineering National Register Historic • 2 parking lots constructed District • Wood decking at east side of the Fire Boat • Bulkhead Wharf is not HQ Building was replaced listed (non-contributing 1915 • Pier substructure was strengthened with resource) installation of concrete drums at the pilings • Important feature of Pier • Pier 22 ½ built • Electrical wiring for the building was 22 ½ is its connection to • Fire Boat Headquarters reconfigured and electrical equipment was the bulkhead wharf and Building constructed installed at the rear of the building the seawall. 1980s 1999 2010 • Non-historic Fireboat Pier • Fire Boat Headquarters • Pier Strengthening at constructed Building designated as Pier 22 ½ San Francisco City • Emergency stabilization Landmark #225 of the pier structure • AWSS Hydrant Removed • $2.3M • Cowhey Pacific Drilling; Vortex Marine • ESER 2010 Bond passed • Doesn’t include Fire Boat Station project Building Design & Construction NEW FIRE BOAT STATION 35 AT PIER 22.5 Project Management San Francisco Fire Commission | June 14, 2017 5 PROJECT HISTORY 2016 • Introduction of Sea Level Rise (SLR) floating barge 2014 solution / scope reduced • April 2014: Warriors • Budget: $39.9M proposed project site • Design-Build project moved away from Piers delivery method approved 2011 30/32 by Fire Administration • June 23: Fire Commission • June 2014: SFFD directed • RFQ for Design-Build approved concept of new Public Works to resume Services advertised in concrete pier and project planning at Pier August boathouse structure 22 ½ • Pier 26 Fire Boat Berths • Preliminary Budget: • November 2014: ESER • NTP issued in August to $20M 2014 Bond passed Vortex Marine 2012 2015 2017 • February 29: Fire Commission approved ESER • June 2015: Project moved • RFP for Design-Build 2010 NFS project portfolio to ESER 2014 Services advertised in • Approved Budget: $27.17M • Baseline Budget: February • ESER 2010: $19.54M $37.85M • RFP Step 1 submissions • Other Funds: $7.63M • RFQ for A/E Services received in March • Slab replacement project completed in June • Advertised in September • RFP Step 2 submissions 2012 • GHD highest ranked due in May • $437K (non-ESER funds) respondent in December • Selection of Design- • JOC contractor: Azul Works (LBE) • Presentation to Capital Builder in June • Modification to (E) gas line completed in April Planning Committee in 2013 October • November 2012: Warriors presented proposed • $52M development project at Piers 30/32 included a new Fire Boat Station #35 at the site Building Design & Construction NEW FIRE BOAT STATION 35 AT PIER 22.5 Project Management San Francisco Fire Commission | June 14, 2017 6 FIRE STATION EXISTING CONDITIONS EXISTING CONDITIONS: • Current facilities are over 100 years old – costly repairs continue to mount • Two piers, both deteriorating • One is completely unusable, the other is in poor condition • Fire Station not seismically retrofitted • Storage offsite, so equipment is out of reach in emergency situations • Spill response containment booms stored in trailers away from water • Split operations EXISTING FACILITY DEFICIENCIES: • Current facility space is grossly undersized for the operation program • Locker facilities and restrooms are inadequate • Only station with no equal accommodations for female firefighters • Ongoing fireboat maintenance including welding and other metal work currently done in the existing (unsuitable) wood framed shed structure • No ambulance access to back of fire station for transfer of injured • No decontamination space for firefighters and equipment Building Design & Construction NEW FIRE BOAT STATION 35 AT PIER 22.5 Project Management San Francisco Fire Commission | June 14, 2017 7 EXISTING CAPACITY EXISTING STATION 6,100 GSF ASSETS LIABILITIES • Two Fire Boats • Deteriorated Berthing Areas • One Fire Engine • No Environmental Responses Equipment Storage, e.g. Oil Spill Boom • No capacity for: Jet Skis, Small Craft Rescue Equipment, Dive Boat, e.g. Small Rescue Watercraft • No Storage Areas • No Decon Area and No Dive Equipment Area Historic FS #35 is 4,736 GSF • No Rescue Unloading Area Shed is 1,720 GSF Existing Pier/Dock/Parking Lot: 14,820 GSF • No Changing Facilities for Firefighters Building Design & Construction NEW FIRE BOAT STATION 35 AT PIER 22.5 Project Management San Francisco Fire Commission | June 14, 2017 8 PROPOSED CAPACITY NEW STATION 16,339 GSF ASSETS FEATURES • Three Fire Boats • Addresses all liabilities of existing facility • Rescue Watercraft • Construction to Essential Facility Standards • Jet Skis • Storage Areas Consolidated for Emergency Response Equipment • Dive Boat • Ambulance Access • One Fire Engine Limits of project • Equipment for Boat Access, Rescue, and Loading and Unloading Historic FS #35: 4,736 GSF Existing Pier to remain: 7,000 GSF Proposed New Barge*: 19,400 GSF Total Shadow (Remaining + New): 26,400 GSF *includes: Barge = 14,400 sf; Ramp = 2,000 sf; Float (200’x15’) = 3000 sf for total shadow of all three NEW components on the Bay Building Design & Construction NEW FIRE BOAT STATION 35 AT PIER 22.5 Project Management San Francisco Fire Commission | June 14, 2017 9 ESER SFFD DESIGN GUIDELINES Note: in addition to these restroom guidelines: each fire station, regardless of size, will have one all-gender ADA- compliant full restroom with toilet, lav and shower. Prepared 2012; Rev. 1, Feb 2017 Building Design & Construction NEW FIRE BOAT STATION 35 AT PIER 22.5 Project Management San Francisco Fire Commission | June 14, 2017 10 DESIGN-BUILD PROCUREMENT Panel 1: 4 members (1 SFFD) Panel 2: 5 members (1 SFFD) Panel 1: 4 members (1 SFFD) RFQ RFP Step 1 RFP Step 2 5 teams submitted and 5 shortlisted: 3 teams submitted and 2 shortlisted: 1 responsive proposal submitted: • Overaa/Dutra, JV • Overaa/Dutra, JV • Overaa/Dutra, JV • Nibbi Brothers • Plant Construction and TEF/KRA, JV • Swinerton/Power, JV • Plant Construction and TEF/KRA, JV • Swinerton/Power, JV • Swinerton/Power, JV Total Project Budget: $39.9M • Turner/Pfau Long, JV Design-Build Budget: $29.9M Design-Build Proposal: $29.82M Building Design & Construction NEW FIRE BOAT STATION 35 AT PIER 22.5 Project Management San Francisco Fire Commission | June 14, 2017 11 CONCEPT SITE PLAN Building Design & Construction NEW FIRE BOAT STATION 35 AT PIER 22.5 Project Management San Francisco Fire Commission | June 14, 2017 12 CONCEPT 1ST FLOOR PLAN Building Design & Construction NEW FIRE BOAT STATION 35 AT PIER 22.5 Project Management San Francisco Fire Commission | June 14, 2017 13 CONCEPT 2ND FLOOR PLAN Building Design & Construction NEW FIRE BOAT STATION 35 AT PIER 22.5 Project Management San Francisco Fire Commission | June 14, 2017 14 CONCEPT INTERIOR – DAYROOM/DINING/KITCHEN Building Design & Construction NEW FIRE BOAT STATION 35 AT PIER 22.5 Project Management San Francisco Fire Commission | June 14, 2017 15 CONCEPT ELEVATION - SOUTH Building Design & Construction NEW FIRE BOAT STATION 35 AT PIER 22.5 Project Management San Francisco Fire Commission | June 14, 2017 16 CONCEPT VIEW FROM THE EMBARCADERO Building Design & Construction NEW FIRE BOAT STATION 35 AT PIER 22.5 Project Management San Francisco Fire Commission | June 14, 2017 17 CONCEPT VIEW FROM THE BAY Building Design & Construction NEW FIRE BOAT STATION 35 AT PIER 22.5 Project Management San Francisco Fire Commission | June 14, 2017 18 CONCEPTUAL PLANNING PROCESS FLOWCHART Concept Phase Design Phase Fire Begin Concept Present to Fire Present to Commission WDAC & DRB Port Permit Phase Commission WDAC & DRB Follow-up Follow-up Review Present to San Port San Francisco Port Present to Port Francisco Commission Heritage Engineering Commission Heritage Follow-up Follow-up Peer Review Present to ARC Present to of the San CWAG Follow- ARC Follow- BCDC Follow- CWAG Francisco HPC up Up up Present to South Beach, City PM will coordinate South Beach, Initial Rincon Hill, Follow-up scheduling & presentations; Rincon Hill, Meetings: Mission Bay Meetings: meetings will be combined Mission Bay JARPA, Army Neighborhood
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages25 Page
-
File Size-