Social Monitoring Report Project Number: 47100-004 January 2019 Period: March 2014 – December 2017 IND: Madhya Pradesh Power Transmission and Distribution System Improvement Project Submitted by Madhya Pradesh Madhya Kshetra Vidyut Vitaran Co. Ltd. (DISCOM-C), Bhopal This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. ASIAN DEVELOPMENT BANK Loan No. 3066-IND Project Number: 47100-004 SOCIAL MONITORING REPORT [SMR] Period: March 2014 to December 2017 IND: Madhya Pradesh Power Distribution System Improvement Prepared by: Environmental Planning and Coordination Organization Bhopal (Under Department of Environment, Government of MP) Prepared for: EXECUTING AGENCY Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited (MPMKVVCL) Bhopal, MP I LIST OF CONTENTS 1.0 INTRODUCTION .......................................................................................................................... 1 1.1 PROJECT BACKGROUND AND DESCRIPTION ....................................................................... 1 1.2 PURPOSE OF THE REPORT ......................................................................................................... 3 2.0 PROJECT RESETTLEMENT ENTITLEMENT, ASSISTANT & BENEFITS ..................... 4 2.1 INTRODUCTION ............................................................................................................................ 4 2.2 CUT-OFF DATE FOR ENTITLEMENTS ...................................................................................... 4 2.3 ENTITLEMENT MATRIX.............................................................................................................. 4 3.0 PROJECT IMPLEMENTATION STATUS & SOCIAL IMPACT .......................................... 7 3.1 STATUS OF IMPLEMENTATION (AS ON DECEMBER 2017) ................................................. 7 3.2 OVERVIEW OF SOCIAL IMPACTS ............................................................................................. 8 4.0 COMPENSATION ......................................................................................................................... 9 5.0 PUBLIC CONSULTATION AND DISCLOSURES ................................................................... 9 5.1 CONSULTATION ........................................................................................................................... 9 5.2 DISCLOSURES ............................................................................................................................. 10 6.0 GRIEVANCE REDRESS MECHANISM ................................................................................. 10 7.0 INSTITUTIONAL ARRANGEMENTS .................................................................................... 11 8.0 MONITORING AND EVALUATION ....................................................................................... 12 9.0 CONCLUSION ............................................................................................................................. 13 LIST OF FIGURES FIGURE 1: MP DISCOM-CENTRAL JURISDICTION ............................................................................ 1 LIST OF TABLES TABLE 1: SUMMARY OF ORIGINAL & UPDATED SCOPE OF WORK OF DISCOM-CENTRAL ................... 3 TABLE 2: ENTITLEMENT MATRIX ........................................................................................................................ 5 TABLE 3: STATUS OF IMPLEMENTATION AND IMPACT OF PROJECT ......................................................... 7 TABLE 4: GRIEVANCE REDRESS STATUS ......................................................................................................... 11 LIST OF ANNEXURES ANNEXURE-I: ORIGINAL SCOPE OF WORK OF DISCOM- C .......................................................................... 14 ANNEXURE-II: DETAILED UPDATED SCOPE OF WORK OF DISCOM-CENTRAL ...................................... 17 ANNEXURE III: LAND ALLOTMENT CIRCULAR OF DEPTT OF REVENUE, GOVT OF MP ....................... 22 ANNEXURE IV: PHOTOGRAPHS OF SITE VISIT AND CONSULTATION ...................................................... 23 ANNEXURE V: SHEET OF PUBLIC CONSULTATION ....................................................................................... 24 ANNEXURE: VI: ESTABLISHMENT OF GRIEVANCE REDRESSED COMMITTEE (GRC) ........................... 26 ANNEXURE VII: ESTABLISHMENT OF ENVIRONMENTAL & SOCIAL MANAGEMENT UNIT ................ 27 II ABBREVIATIONS ADB – Asian Development Bank EA – Executing Agency AP – Affected People EPCO – Environmental Planning and Coordination Organization ESMU – Environmental and Social Management Unit EMP – Environment Management Plan GHG – Greenhouse Gas GoMP – Government of Madhya Pradesh GoI – Government of India GRC – Grievance Redress Committee IA – Implementing Agency IEE – Initial Environmental Examination IP – Indigenous Peoples IR – Involuntary Resettlement Ltd. – Limited LAA – Land Acquisition Act PMU – Project Management Unit ROW – Right of Way RF – Resettlement Framework RP – Resettlement Plan S/S – Sub Station III 1.0 Introduction 1.1 Project Background and Description To improve the quality and reliability of service in the power distribution system networks in the State of Madhya Pradesh, the Government of Madhya Pradesh (GoMP) has taken initiatives to invest in the power sector availing financing assistance from the Asian Development Bank (ADB) as development partners. The investments involve expansion, upgrading and reconfiguration of the existing power distribution system improvement in central Madhya Pradesh (Figure: 1). Figure 1: MP DISCOM-Central Jurisdiction The proposed investments are necessary to: (i) facilitate increased power transfers to accommodate increased demand and economic growth; (ii) improve supply-side energy efficiency by system de-bottlenecking and reducing technical losses; (iii) reduce the intensity of greenhouse gas (GHG) and other emissions via improved system efficiency; (iv) support expanded private sector participation in distribution system operations and other energy services; and (v) facilitate poverty reduction via improved electricity services and economic growth. 1 This social monitoring report provides information pertaining to the project for the period March 2014 to December 2017. The report is prepared by Environmental Planning and Coordination Organization [EPCO], Bhopal, Department of Environment, GoMP) for MP DISCOM-Central. The project is categorized as “B” for Involuntary Resettlement (IR) and “C” for Indigenous Peoples as per the ADB’s SPS. The core principles are consistent with the standards of the original safeguards documents and loan covenants. The RP covers the involuntary resettlement impact caused by the project activity. The main features of the project as per original scope of work (Annexure-I) of DISCOM – Central under this loan includes: (i) Distribution system improvement (i) Construction of 76 No.s New 33/11 S/S (ii) Installation of 501 km 33 KV (iii) 373 km 11 KV distribution lines, (iv) Bifurcation of overloaded 33 KV feeders and (v) Installation of 331 No.s 11 KV, 1500 KVAR Automatic Capacitor Banks. (ii) Capacity building for the executing agency staff. It is being implemented by DISCOM-C Bhopal under ADB Loan no. 3066. As per the Requirement of ADB Loan 3066, a combined Resettlement Plan and IEE Report for all distribution companies were submitted for ADB’s approval in September, 2013. However, in due course of work, 2 Nos. site locations of substations has been changed and 01 No substation was de-scoped from the original scope of work due to non-availability of land/ land dispute. DISCOM-Central area is facing low voltage problem and overloading of 11 KV feeders hence, it is decided to construct 13 Nos. new substations at load center. As the project implementation has taken sometime alternative feeders are created and problem of overloading emerged in other area so 4 No feeders are deleted, 7 No. new 33 KV feeders and 2 No.s 11 KV feeders were added in the project (Table 1). In light of these changes, the RP report was further updated & submitted for ADB’s approval. The updated RP report is approved & disclosed by ADB. 2 Table 1: Summary of Original & Updated Scope of Work of DISCOM-Central (As on 31 March 2018) S. Name of Lot Original Modified Difference Remarks No. Scope Scope I. 33/11 Substation A PKG 1 LOT I 49 58 09 B PKG 1 LOT II 27 30 3 Total 76 88 12 13 Nos. added and 1 Nos. De-scoped II. 33 KV Feeders A PKG 1 LOT I 314 307.28 -6.72 4 Nos to be deleted and 7 Nos. added B PKG 1 LOT II 196 166.24 -29.76 Total 510 473.52 -36.48 III. 11 KV Feeders A PKG 1 LOT I 236 137.56 -98.44 2 Nos. feeders added B PKG 1 LOT II 137 64.3 -72.7 Total 373 201.86 -171.14 IV. Capacitor A PKG 1 LOT I 136 136 0 B PKG 1 LOT II 195 195 0 Total 331 331 0 V. Control Room Buildings A Bhopal Region 0 11 11 B Gwalior Region 0 11 11 Total 0 22 22 1.2 Purpose of the Report The report captures the overall social safeguards implementation progress in compliance to project’s Resettlement Framework and regulatory requirements. The various social safeguard related issues
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages32 Page
-
File Size-