Joint Base Andrews

Joint Base Andrews

Joint Base Andrews Building Relocation / New Hangar Facility Prince George’s County, Suitland, Maryland _______________ Submitted by the United States Department of Defense, Department of the Navy Concept Review Project Synopsis Project Information Commission meeting date: May 4, 2017 NCPC review authority: Advisory – Federal Project in the Environs (40 U.S.C. § 8722 (b)(1)) Applicant request: Concept Review Delegated / consent / open / executive session: Consent Calendar NCPC Review Officer: Michael Weil NCPC File # 1 number: 7872 NCPC File # 2 number: 7873 Project # 1 summary: The United States Department of Defense proposes to relocate a building to a site that was formerly used as military housing. The project will relocate the use from a different part of the installation where a new facility (project #2) will be constructed. Project # 1 will consist of a 1,500 square foot building, power generator building (w/ a 10x12-feet pad), perimeter security fencing, site lighting and security cameras, parking (10 spaces), relocated access road, and approximately 5.4 acres of cleared land. The project narrative states that necessary tree removal will be mitigated pursuant to installation reforestation/replacement policies, and the project will comply with State and federal stormwater requirements. Project # 2 summary: The United States Department of Defense proposes to construct a new combined 372,000 GSF administrative/warehouse/two-bay hangar building on the site of an abandoned weapons storage bunker, part of a golf course, and a part of a wetland area, adjacent to an existing airport taxiway. The project will include aircraft access taxiway/parking apron and associated airfield lighting systems, with connections and necessary modifications to existing infrastructure; fuel storage tanks; vehicle parking lots; access roads; delivery docks; perimeter roads; perimeter security fencing, stormwater management features, and landscaping. Mitigation will be provided for the project’s stormwater impact and use of an existing wetland area. Both projects are contained in the Joint Base Andrews Master Plan, which is currently undergoing an update process, scheduled for NCPC review in the fall/winter, 2017. 2 Project #1: Site Location future building site project location existing building site 3 Project #1: Existing Site 4 Project #1: Existing Site 5 Project #1: Proposed Building Elevations 6 Project #2: Site Location project # 1 site project location future hangar site 7 Project #2: Existing Site 8 Project #2: Proposed Concept Site Plan 9 Project #2: Proposed Concept Site Plan 10 Project #2: Proposed Concept Landscape Plan 11 Project #2: Proposed Concept Perspectives 12.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    12 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us