Expressway Project 2-9 2.4 Impact on Traffic Condition at Kasetsart Junction, 2-12 Case : Expressway Project

Expressway Project 2-9 2.4 Impact on Traffic Condition at Kasetsart Junction, 2-12 Case : Expressway Project

Feasibility Study of the Brown Line Project between Khae Rai - Lam Sali (Bueng Kum) Contents Contents Page Chapter 1 Introduction 1-1 1.1 Project Background 1-1 Chapter 2 Traffic Study and Rail Passenger Study 2-1 2.1 Traffic and Transportation Study 2-1 2.2 Forecast Rail Passenger 2-7 2.3 Forecast Traffic Volume of the Elevated Expressway Project 2-9 2.4 Impact on Traffic Condition at Kasetsart Junction, 2-12 Case : Expressway Project Chapter 3 Elevated Expressway 3-1 3.1 Overview 3-1 3.2 Entrance and Exit Design 3-4 3.3 Viaduct Structures 3-7 3.3.1 Preliminary Investment Plan of the 3rd Stage Expressway – North Line 3-8 3.3.2 Land Acquisition Cost 3-8 3.3.3 Construction Cost (Construction Supervision 3-8 and Environmental Cost included) 3.4 Economic Suitability Analysis 3-9 3.5 Financial Suitability Study 3-11 3.5.1 Assumptions to Financial Analysis 3-11 3.5.2 Cost Estimate Investment and Operations 3-11 3.5.3 Project Revenue Estimates 3-13 3.5.4 Financial Suitability Analysis 3-15 3.5.5 Results of Financial Analysis 3-16 3.6 Investment Plan 3-19 Chapter 4 Railway System 4-1 4.1 Alignment 4-1 4.2 General Concept of the Brown Line Project 4-4 4.2.1 Routing 4-4 4.2.2 Track Viaduct 4-4 4.3 Station 4-9 4.3.1 Station Location 4-9 4.3.2 Interchange Station 4-21 EPS PP DC IEC ENRICH -1- Executive Summary Report Feasibility Study of the Brown Line Project between Khae Rai - Lam Sali (Bueng Kum) Contents Contents (cont’d) Page 4.4 The Railway System 4-22 4.5 Investment Plan 4-24 4.5.1 Land Acquisition Cost 4-24 4.5.2 Construction Cost (include construction supervision 4-25 and environmental mitigation) 4.6 Economic Analysis 4-26 4.7 Suitability Study for Financial and Investment 4-28 4.7-1 Estimated Expenditures Investment and Operation Costs 4-28 4.7-2 Estimated Revenues of Project 4-30 4.8 Financial Suitability Analysis 4-32 4.9 Investment Plan 4-33 Chapter 5 Development plan 5-1 5.1 Development Plan and Implementation of the Expressway 5-1 and the Brown Line System 5-1 5.2 Collaborative Model and Plan with the Brown Line Project 5-2 5.3 Formal Coordination with the Brown Line Project 5-6 EPS PP DC IEC ENRICH -2- Executive Summary Report Feasibility Study of the Brown Line Project between Khae Rai - Lam Sali (Bueng Kum) Contents Table of contents Page Table 2.1-1 Trips Forecast of the Bangkok Metropolitan Region 2-1 Table 2.1-2 Mode Share from the Rail Mass Transit Master Plan in 2029 2-2 Table 2.1-3 Traffic Index of Road Network in Influence Area by Year 2051 2-6 Table 2.1-4 Total Demand by Mode Share in W-E Corridor by Year 2051 2-6 Table 2.2-1 Forecast Public Transport Demand by Rail Transit Year 2021-204 2-7 Table 2.2-2 Predict Summary Passenger Volume and Passenger Transfer 2-8 Volume Year 2025-2055 Table 2.3-1 Traffic Benefit of Road Network (A.M. Peak) During 2024-205 2-10 Table 3.3-1 Acquisition Cost B.E. 2561 3-8 The 3rd Stage Expressway, North Line – N1 Substitution, N2, EW Corridor-East Side Table 3.3-2 Project Construction Cost 3-8 Table 3.4-1 Results of Financial Analysis: 3-9 Northern 3rd Stage Expressway System N2 & EW and N1 Project Table 3.4-2 Detail of Economic Analysis: 3-10 Northern 3rd Stage Expressway System N2 & EW and N1 Project Table 3.5-1 Summary of Project Financial Cost: Northern 3rd Stage 3-11 Expressway System N2 & EW and N1 Project Table 3.5-2 Investment Plan Northern 3rd Stage Expressway System 3-12 N2 & EW and N1 Project (Financial Prices) Table 3.5-3 Toll Rate Classified by Car Types 3-14 Table 3.5-4 Standard Assumptions for Financial Analysis 3-16 Table 3.5-5 Results of Financial Analysis: 3-17 Northern 3rd Stage Expressway System N2 & EW and N1) Table 3.5-6 Cash Flow Statement in Case of investment with Thailand Future Fund (TFF) 3-18 Table 4.3-1 Details location of stations 4-10 Table 4.3-2 Location of Interchange Station 4-21 Table 4.4-1 Summary of Passenger of the Brown Line 2025-2055 4-22 Table 4.4-2 Estimation of Trains and Headway 4-22 Table 4.5-1 Land Acquisition Cost of the Brown Line 4-25 Table 4.5-2 Project Cost Estimate 4-25 Table 4.6-1 Results of Economic Analysis 4-26 EPS PP DC IEC ENRICH -3- Executive Summary Report Feasibility Study of the Brown Line Project between Khae Rai - Lam Sali (Bueng Kum) Contents Table of contents (cont’d) Page Table 4.6-2 Detail Economic Analysis of the Brown Line Railway System Project : 4-27 Khae Rai-Lumsali Section Table 4.7-1 Summary of Project Financial Cost 4-28 Table 4.7-2 Yearly Projected Investment 4-29 Table 4.7-3 Fare Rate from 2018-2055 4-30 Table 4.7-4 Summary of Volume of Passengers Forecasting and Volume of 4-31 Transfer Passengers of the Brown Line from 2025-2050 Table 4.7-5 Project Revenue Forecast of the Brown Line 4-31 Table 4.8-1 Standard Assumptions for Financial Analysis 4-32 Table 4.8-2 Results of Financial Analysis 4-32 Table 4.8-3 FIRR Calculation for Calculate Revenue in Case of Distant Fare 4-34 Table 5.1-1 Plan for the Northern Third Stage Expressway Project 5-1 Table 5.1-2 Plan for the Brown Line Project 5-2 EPS PP DC IEC ENRICH -4- Executive Summary Report Feasibility Study of the Brown Line Project between Khae Rai - Lam Sali (Bueng Kum) Contents Figure of contents Page Figure 1.1-1 Route Alignment of the Brown Line Electric Train Project 1-2 Figure 1.1-2 Route Alignment of the E-W Corridor Expressway Project 1-3 Figure 1.1-3 The Brown Line Electric Train Project 1-4 Figure 1.1-4 The Brown Line and the Expressway on Prasert Manukitch Road 1-4 Figure 1.1-5 The Brown Line and the Expressway on Prasert Manukitch Road 1-5 Figure 1.1-6 The Brown Line and the Expressway at Nawamin Intersection 1-5 Figure 2.1-1 Road Network System and the Main Expressway 2-3 in the Bangkok Outer Ring Road Figure 2.1-2 Traffic Demand and Available Capacity, Without Project Case 2-4 Figure 2.1-3 Traffic Demand and Available Capacity, With Project Case 2-5 Figure 2.3-1 Traffic Volume Elevated Expressway Project 2-9 in Case of Alternative 4 (A.M. Peak) Figure 2.3-2 V/C Ratio of Alternative 4 Comparative with Without Project 2-11 Figure 3.1-1 The Missing Link, the elevated expressway linked between 3-2 Srirat - Western Bangkok Outer Ring Road Elevated Expressway and Utra Phimuk Elevated Toll Road - 1/2 Figure 3.1-2 The Missing Link, the elevated expressway linked between 3-2 Srirat - Western Bangkok Outer Ring Road Elevated Expressway and Utra Phimuk Elevated Toll Road - 2/2 Figure 3.1-3 The N2 and E-W Corridor Sections of the 3rd Stage Expressway 3-3 Figure 3.1-4 The Entire Route of East-West Elevated Expressway 3-3 Figure 3.1-5 Route of Project 3-4 Figure 3.2-1 Entrance and Exit Ramps 3-5 Figure 3.2-2 System Interchange with Chalong Rat Expressway and its toll system 3-6 Figure 3.2-3 System interchange with Eastern Bangkok Outer Ring Road and its toll system 3-6 Figure 3.3-1 Conceptual Design of Combination Section on Prasert Manukitch Road 3-7 Figure 4.1-1 Mass Transit and Expressway Network 4-1 Figure 4.1-2 The alignment of Brown Line System from Khae Rai to 4-2 Lum Sali and the Northern Expressway Stage 3 section N1 substitution, N2+EW Figure 4.1-3 Picture of Brown Line Project and Expressway System 4-2 on Prasert Manukitch road EPS PP DC IEC ENRICH -5- Executive Summary Report Feasibility Study of the Brown Line Project between Khae Rai - Lam Sali (Bueng Kum) Contents Figure of contents (cond’t) Page Figure 4.1-4 Picture of Monorail Station on Prasert Manukitch road 4-3 Figure 4.1-5 General Configuration of Expressway and Railway System 4-4 Figure 4.2-1 Picture of the Brown Line Project on 4-5 Ngam Wong Wan road and Nawamin road Figure 4.2-2 Picture of the Brown Line Project on 4-5 Ngam Wong Wan road and Nawamin road Figure 4.2-3 Alignment of Brown Line and 4-6 Proposed Grey Line interchange Station at Chalong Rat Interchange Figure 4.2-4 Alignment of Brown Line at Nawamin Intersection 4-6 Figure 4.2-5 Picture of Brown Line Project at Nawamin Intersection 4-7 Figure 4.2-6 General Elevation of Brown Line 4-8 Figure 4.3-1 Location of Station 4-9 Figure 4.3-2 Interchange location with other Railway line 4-21 Figure 4.4-1 Monorail Straddle Type System 4-23 Figure 4.4-2 Depot of Brown Line 4-24 Figure 5.2-1 Operation Plan for the Expressway and 5-3 the Brown Line Project Figure 5.2-2 Budget Plan for the Northern Third Stage Expressway System N2 E-W 5-4 Corridor and N1 substitution Figure 5.2-3 Budget Plan for the Brown Line Project 5-5 Figure 5.2-4 Map of the Expressway and the Brown Line Project 5-6 Figure 5.3-1 Construction Stages during the Expressway 5-7 and the Brown Line Project Figure 5.3-2 Normal Construction Stages of the Expressway 5-10 EPS PP DC IEC ENRICH -6- Executive Summary Report ข Chapter 1 Introduction Chapter 1 Feasibility Study of the Brown Line Project between Khae Rai – Lam Sali (Bueng Kum) Introduction Chapter 1 Introduction 1.1 Project Background According to a resolution of the cabinet meeting on 17th April 2018, the cabinet acknowledged a solution to use the existing constructed piers at the middle of Prasert Manukitch Road, concluded in the Commission for the Management of Road Traffic meeting no.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    94 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us