MINING PLAN for GRANT of NEW SAND QUARRY OUTLET (Prepared Under Moef &CC Notification –Sustainable Sand Mining Management Guidelines-2016)

MINING PLAN for GRANT of NEW SAND QUARRY OUTLET (Prepared Under Moef &CC Notification –Sustainable Sand Mining Management Guidelines-2016)

MINING PLAN FOR GRANT OF NEW SAND QUARRY OUTLET (Prepared under MoEF &CC Notification –Sustainable Sand Mining Management Guidelines-2016) Extent : 5.26.50 ha. out of 52.12.0ha. R.S. No. : 103 Part Rev.Village : Manamedu Taluk : Bahour District : Puducherry U.T : Puducherry Client EXECUTIVE ENGINEER, IRRIGATION DIVISION, PUBLIC WORKS DEPARTMENT, PUDUCHERRY. Prepared by C. KEERAN, M.Sc., Recognized Qualified Person Reg. No. RQP/MAS/228/2011/A 57, Murugan Koil Street, Koothapakkam, CUDDALORE – 2. Phone: (04142) 236850, Mob: 9443292470 E-mail: [email protected] 2013 CONSENT LETTER FROM CLIENT The Mining Plan in respect of New Sand Quarry out let in R.S.No.103 part over an extent of 5.26.50 ha. out of 52.12.0 ha. Government Poramboke land Thenpennaiyar River in Manamedu Village , Bahour Taluk , Puducherry District Union Territory of Puducherry has been prepared by Shri C.Keeran, Recognised Qualified person, Reg.No. RQP/MAS/228/2011/A. I request the District collector, Government of Puducherry to make further correspondence regarding modifications of the Mining Plan with the said Recognoised Qualified person on this following Address, C.KEERAN, M.Sc., No.57, Murugan Koil Street, Koothapakkam, Cuddalore - 607 002. Phone:(04142)236850, Mob:9443292470 E-mail:[email protected] I hereby undertake that all modifications so made in the Mining Plan by the Recognised Qualified Person may be deemed to have been made with my knowledge and consent and shall by acceptable to me and binding on me in all respects. Place: Puducherry Signature of the Client Date: 18.09.2018 EXECUTIVE ENGINEER, IRRIGATION DIVISION, PUBLIC WORKS DEPARTMENT, PUDUCHERRY. DECLARATION OF THE CLIENT The Mining Plan in respect of new Sand Quarry out let in R.S.No.103 part over an extent of 5.26.5 ha. out of 52.12.0 ha. Government Poramboke land Thenpennaiyar River in Manamedu Village, Bohour Taluk, Puducherry District, Union Territory of Puducherry has been prepared with my consultation and I have understood the contents and agree to implement the same in accordance with the Mining Plan. Place : Puducherry Date: 18.09.2018 Signature of the Client C.KEERAN, M.Sc., Recognized Qualified Person, No.57, Murugan Koil Street, Koothapakkam, CUDDALORE -607 002. Tel: 04142-236850, 9443292470 E-mail:[email protected] CERTIFICATE This is to certify that the Mining Plan prepared under MoEF&CC-Notification sustainable sand mining management guidelines-2016 in R.S.No.103 part over an extent of 5.26.5 ha. out of 52.12.0 ha. Government Poramboke land Thenpennaiyar River of Manamedu Village , Bahour Taluk, Puducherry District Union Territory of Puducherry proposed by Executive Engineer, Irrigation Division PWD Puducherry for Fresh application /lease . Wherever specific permissions / exemptions / relaxations or approvals are required, the applicant will approach the concerned authorities of Union Territory and Central Governments for granting such permissions etc., Certified Place: Puducherry Date: 18.09.2018 Signature of Recognized Qualified Person MINING PLAN FOR GRANT OF NEW SAND QUARRY OUT LET (SEMI- MECHANIZED) OVER AN EXTENT OF 5.26.5 ha. IN R.S. NO. 103 PART INMANAMEDU VILLAGE, BAHOUR TALUK, PUDUCHERRY DISTRICT, PUDUCHERRY(U.T) EXECUTIVE SUMMARY 1. Executive Engineer, Irrigation Division, Public Works Department, Puducherry, Union Territory of Puducherry, Client has Proposed for New Sand Semi-Mechanized Quarry out let lease located in R.S. No.103 Part Government Owned porambokeThenpennairiver by the Client from District Collector, Government of Puducherry. 2. Proceedings of the District Collector, Puducherry No. 6044/DRDM/C2/SM- Manamedu /2018 dated 14.09.2018 has been granted to the Client, Executive Engineer, Irrigation Division, Public Works Department, Puducherry for a period of two years and also directed to submit the Mining Plan, Environmental Clearance from the State level Environment Impact Assessment Authority, Puducherry for the above area. 3. Accordingly, Mining Plan is prepared under MoEF&CC –Notification sustainable sand mining management guidelines-2016 for Grant of New Sand Quarry out let lease with due consideration of Environmental parameters so as to obtain Environmental clearance EC from State SEIAA-Puducherry. 4. Geological reserves is estimated 78975m3 and recoverable reserves estimated 31590 m3 for this proposed River sand mining. 1 5. Environmental measures to be adopted shall be. i) Dust control at source while loading and transport haul roads. ii Avoid over loading and deepening the land beyond the permitted depth. iii) Land degradation by undulation should be avoided. As practically as possible, the Earth should be removed in and uniform layer. iv) Emission test of vehicles should be in tack to maintain minimum emission level of fuel gases. v) Noise level should not exceed 80db and the vehicles should use only permitted air horn while on road near residential areas. vi) And such other conditions as stipulated by the concerned authorities. 2 INTRODUCTION : The EIA (Environmental Impact Assessment) notification, 2006, requires Mining projects, including new projects, modernization or renewal of mine leases, with lease area of 5 hectares shall also obtain Environmental clearance from the state level EIA Authorities. Government owned poramboke land by the Client R.S.No103 part of Manamedu Village , BahourTaluk, Puducherry District, intended to Mine New sand Quarry out let by eco-friendly Semi- Mechanized method with Controllable impact on Environmental hazard. The Mined Sand is transported by Bullock cart and tipper transport to Government House Projects and other Govt. works. Under MoEF notification EIA – 2006 and Additional details EIA notification – 2009 & 2016 this project falls under category “B” and SI. No. in the schedule I (a). In addition to Geological reserve estimation and conceptual plan (Ref Plates) with reference to Minor Mineral conservation and development Rules, 2010 and other circulars this Mining plan is prepared accordingly. 3 PART - A 1. GENERAL INFORMATION 1.1 a) Name of the Client Executive Engineer, b) Address of the Client Executive Engineer, Irrigation Division, Public Works Department, Puducherry. PIN – 605 001 Tel: 0413 233 6399/222 4711 c) Status of the Client Executive Engineer, (Individual / Company / Firm) Irrigation Division, PWD, Government of Puducherry. 1.2 a) Mineral which the applicant NEW SAND QUARRY intends to mine. (Semi- Mechenized) b) Precise area Communication Puducherry District Collector Letter letter details received from the No.6044/DRDM/C2/SM- competent authority of the Manamedu/2018 Government. dated:14.09.2018 (Ref. Annexure - I) a) Period of permission / lease to TWO YEARS be granted b) Name and address of the C. KEERAN, M.Sc., RQP/Authorized person 57, MuruganKoil Street, preparing the Mining Plan Koothapakkam, CUDDALORE – 607 002. Tel: 04142-236850/9443292470 E.mail: [email protected] Regn.No. RQP/MAS/228/2011/A Validity ending up to 02-11-2021 4 2. LOCATION a) Details of the area Enclosed in plate No. I (with location map) i. District, Taluk and Village Puducherry District, Bahour Taluk, Manamedu Village. ii. Survey Number 103 Part iii. Extent (in hectares) 5.26.5 ha.out of 52.12.0 ha. (Ref. Annexure – II) b) Classification of the area Poramboke land-Government property. (Ref. annexure – II) c)Ownership / occupancy of the Government property land applied area (surface right) d)Toposheet No. with latitude and Toposheet No. C44B9 longitude. Latitude :110 47’51.02’’ N to 110 48’03.32’’ N Longitude: 790 40’43.40” E to 790 40’55.46” E (Ref. PLATE - I) e)Existence of Public road / Railway As mentioned above area is reached line, if any nearby and from Puducherry to Bahour NH 45A upto approximate distance. Kirumapakkam at a distance of 17 kms thereby 8 kms west reaches Manamedu Proposed quarry site. Nearest Railway station Nellikuppam 6 kms. 5 3. GEOLOGY AND MINERAL RESERVES 3.1 Brief Description of the Topography: Topography and general Geology of the area (with The lease applied area Manamedu plans) Thenpennai River sand Quarry with 12m above MSL. It is represented in the survey of India Toposheet No. C44 B9 and lies at Latitude 110 47’ 51.02’’N to 110 48’ 03.32’’N and longitude 790 40’ 43.40”E to 790 40’ 55.46”E. The lease applied area is containing accumulated River sand by work of stream deposit below 1.5 m from the River bed. The area receives 1316 mm rainfall mostly northeast monsoon period of October to December. The ground water level is 6 m. There is no reserve forest wildlife sanctuary, National monument etc., near area. The surface Geological CS & LS of the Thenpennai river bed of the above area taken into account in the plate No. 3 3.2 Details of Exploration The area was personally examined by the Already carried out if any geologist who prepared the mining plan with Auger drilling and estimated the average depth of sand availability fetches to 390m X 135m X 1.5m = 78,975m3. The River Sand is an Recent sedimentary deposit formed by work of stream and it can be confirmed by physical visualize. (Ref. Plate No.3) 6 3.3 Estimation of reserves a) Geological reserves The geological and mineral reserves of River with geological sand has been computed by taking standard sections on a scale of method of cross section and LS influence for 1 : 1000 determining the volume of River sand occurrence in this area average level of 1.5 m form the top River bed. The estimated Geological reserves from total Proposed area fetches to i) (AA’&BB’)390m x 135m x 1.5m = 78,975m3 Total Geological Reserves = 78,975m3 (Ref. Surface and Geological plan and section plate No. 3) b) Recoverable Reserve The recoverable reserves of the proposed River sand to a depth of 0.6m from the top level of the river bed, by computing the CS & LS it fetches to i) (XX’YY’)390m X135m X 0.6m= 31,590 m3 Total R.R = 31,590 m3 ( Ref.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    27 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us