Main Roads WA

Main Roads WA

1 Main Roads WA Great Southern Region 1,629km of State Roads & Hwys 2 78 x State Bridges (90% timber) 77 x Local Bridges (90% timber) 3 Challenges • Oldest state road network in WA ‒ Average pavement age = 47 years ‒ 52% (863km) > 50 years ‒ Poor pavement condition ‒ Outdated geometry • Funding • Road safety performance • Network redundancy issues 4 Our Operations • Large regional presence • Mixture of technical & business skills • Live and work in Albany ‒ Understand local issues & needs • Responsive delivery model 5 Key Projects • Albany Hwy Passing Lanes ‒ $21.5m over 4 years. ‒ 10 x Passing lanes complete • South Coast Hwy upgrades ‒ Cheynes Section Stage 1 ($7m) – completed in 2017. ‒ Cheynes Section Stage 2 ($5m) – completion in May 2018. ‒ $30m commitment (18/19 to 20/21): widen, reconstruct + passing lanes. 6 Key Projects • Chester Pass Road – Amelup ($11.5m) ‒ Work in progress. ‒ Anticipated completion in June 2018. • Chester Pass Road – Rehab ($2m) ‒ 3 x sections. ‒ Asphalt wearing course. ‒ Completion in mid May. 7 Key Projects • Feb 2017 Flood Event ‒ >$25m damage to 60% of the State road network. ‒ Loss of bridge and culvert assets. ‒ Replacement of Phillips River Bridge within 10 months of the event. 8 HV Rest Area’s • Albany Port bay completed. • South Coast Hwy: Fitzgerald Bays sealed. • Albany Hwy: Cranbrook bay commenced ($2m). • 2018/19 proposals: Brookton Hwy & Ravensthorpe East 9 Albany Ring Road What is it? Major road transport project that will: • Provide high standard, unimpeded road access to the Port of Albany. • Substantially enhance safety and amenity on urban road network. • Allow rationalisation of land use within the City of Albany. • Underpin the economic viability of the Port of Albany. 10 Albany Ring Road Why is it required? • Port of Albany only viable port option on this section of south coast. • Transport routes to port becoming increasingly constrained. • Security of transport route is required – development encroachment. • Road safety issues on urban road network. • Environmental and amenity impacts on residential areas. 11 Albany Ring Road Stage 1 • Chester Pass Road to Albany Hwy (7km) • New single carriageway. • Completed in April 2007. • 1,000 vehicles per day / 26% HV’s. Stage 2 & 3 • Albany Highway to Princess Royal Drive (11km) • New single carriageway (on existing road alignments) • 1 x grade separated interchange (ie bridge). • 17 x at-grade intersections. • Realignment of 4km of rail. • Cost Estimate of $172m. 12 Albany Ring Road Proposed Alignment 13 Albany Ring Road Current Status • Preliminary design for Stage 2 & 3 complete. • “Hardship” land acquisitions undertaken. • $35m committed from State Government. • Submission made for Federal funding ($172m) as part of 2018/19 National Partnership Agreement for Land Transport Projects. • Strong Business Case developed. BCR being finalised (>1.3). • Proposed delivery methodology is via a Design & Construct Contract model. • Project could be delivered over a 2-3 year horizon. 14 In Summary • Strong commitment to Regional WA. • Road & transport needs recognized by State Govt. • Asset replenishment challenge – Innovative & effective treatments / delivery options. • Collaboration is key to viability of industry & network..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    14 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us