
Project : “Gurupragya Sumeru- Residential Apartment Project (Expansion) ” Form 1 Promoter : M/s Gurukripa Buildhome Pvt. Ltd. APPENDIX I (See paragraph – 6) FORM-1 I. Basic Information S. No Item Details 1. Name of the Project/s : “Gurupragya Sumeru”- Residential Apartment Project (Expansion) Promoted by: M/s Guru Kripa Buildhome Pvt. Ltd. 2. S. No. in the schedule : 8(a) { Building and Construction projects ≥ 20,000 sq. m. and <1,50,000 sq. m. of built-up area } 3. Proposed capacity/ area/ : As under: length/ tonnage to be handled/ Total plot area : 4366.02sq. m. command area/ lease area/ Gross Built up area : 24, 410.95 sq.m number of wells to be drilled (Existing: 19503.09 sq. m. + Proposed: 4907.86 sq. m.) The project will comprise of 1 block constituting 149 nos. of dwelling units (1 BHK: 6 nos.; 2 BHK: 78 nos., 3 BHK: 48 nos., 4 BHK: 17 flats) along with other facilities such yoga & meditation halls (2 nos.), commercial area, club house, etc. The details are tabulated as under: Existing Proposed Total Residential flats: 117 nos. Residential flats: 32 Residential flats: 149 nos. 2 BHK : 54 nos. 1 BHK : 6 3 BHK : 45 2 BHK : 42 2 BHK : 78 4 BHK : 17 3 BHK : 3 3 BHK : 48 4 BHK :17 • Yoga & meditation halls-2 Nos. Stilt floor: Club house 1 Project : “Gurupragya Sumeru- Residential Apartment Project (Expansion) ” Form 1 Promoter : M/s Gurukripa Buildhome Pvt. Ltd. 4. New/Expansion/Modernization : Expansion 5. Existing capacity/area etc : Particulars Existing Built–up area 19,503.09 sq. m. No of flats 117 nos. 6. Category of project i.e. 'A' or 'B' : Category- B2 7. Does it attract the general : General conditions are not applicable on projects listed condition? If yes, please under Item 8 of Schedule of EIA Notification, 2006 specify. and its subsequent amendments thereof. 8. Does it attract the specific : Specific conditions are not applicable on projects listed condition? If yes, please under item 8 of the schedule- EIA notification, 2006 specify. and its subsequent amendments thereof. 9. Location Plot/Survey/Khasra no. : Plot No. 7, Green Triveni Scheme Village : Nindar Tehsil : Amber District : Jaipur State : Rajasthan The Geographical Location is as under : 1. Point 2. Point 2 Latitude : 27° 02’ 52.11” N Latitude : 27° 02’ 54.51’’ N Longitude : 75° 45’ 03.94’’E Longitude : 75° 45' 03.93” E 3. Point 3 4. Point 4 Latitude : 27° 02’ 54.43” N Latitude : 27° 02’ 51.90’’ N Longitude : 75° 45' 05.97'' E Longitude : 75° 45' 05.87'' E 2 Project : “Gurupragya Sumeru- Residential Apartment Project (Expansion) ” Form 1 Promoter : M/s Gurukripa Buildhome Pvt. Ltd. 10. Nearest Railway station/ Airport along : As under: with distance in kms. Distance Nearest Name (aerial) & Direction Railway Nindar Banar 5.5 km SW Station Junction Jaipur Junction 14.5 km SSE Airport Jaipur 25.1 km SSE International Airport 3 Project : “Gurupragya Sumeru- Residential Apartment Project (Expansion) ” Form 1 Promoter : M/s Gurukripa Buildhome Pvt. Ltd. 11. Nearest Town, City, District : Nearest town: Nindar – 2.73 km SE Headquarters along with distance in District Head Quarters: Collectorate Jaipur -14.0 kms. km towards SE. 12. Village Panchayat, Zilla Parishad, : The proposed project site is under the Municipal Corporation, Local body jurisdiction of Jaipur Development Authority. (Complete postal address with Address: telephone no. to be given) Jaipur Development Authority, Jaipur, Indira Circle, Jawahar Lal Nehru Marg, Jaipur E-mail : [email protected] 13. Name of the applicant : Guru Kripa Buildhome Pvt. Ltd. 14. Registered address : Guru Kripa Buildhome Pvt. Ltd. #111 Shiv Shakti Nagar , Kings Road, Ajmer Road , Jaipur 15. Address for correspondence: Name : Sh. Sanwar Mal Saini Designation (Owner/Partner/CEO) : Director Address : Guru Kripa Buildhome Pvt. Ltd. #111 Shiv Shakti Nagar , Kings Road, Ajmer Road, Jaipur Pin Code : 302006 E-mail : [email protected] [email protected] Telephone no. : 0141-5175952 Fax No. : -- 16. Details of alternative sites examined, : No alternative site was examined. if any. Location of these sites should be shown on a Toposheet. 17. Interlinked projects : No 18. Whether separate application of : Not applicable interlinked project has been submitted? 19. If yes, date of submission : Not applicable 20. If no, reason : There is no interlinked project. 4 Project : “Gurupragya Sumeru- Residential Apartment Project (Expansion) ” Form 1 Promoter : M/s Gurukripa Buildhome Pvt. Ltd. 21. Whether the proposal involves : No approval/ Clearance under: if yes, details of the same and their status to be given. a. The Forest (Conservation) Act, (1980)? b. The Wildlife (Protection) Act, 1972? c. The C.R.Z. Notification, 1991? 22. Whether there is any Government : No Order/ Policy relevant/ relating to the site 23. Forest land involved (hectares) : No 24. Whether there is any litigation : No litigation is pending against the project in pending against the project and/or land any court of law. in which the project is propose to be set up? a. Name of the Court b. Case No. c. Orders/directions of the court, if any and its relevance with the proposed project. 5 Project : “Gurupragya Sumeru- Residential Apartment Project (Expansion) ” Form 1 Promoter : M/s Gurukripa Buildhome Pvt. Ltd. II. Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. Information/Checklist Yes/ Details thereof (with approximate quantities/ No confirmation No rates, wherever possible) with source of information data 1.1 Permanent or temporary No Land-use: change in land use, land cover The proposed expansion project is coming up within or topography including the ongoing existing project. No additional land is increase in intensity of land required for the proposed expansion. Copy of patta is Annexure I. use (with respect to local land enclosed as use plan) No Land cover: There will be no change in land cover as the proposal involves vertical expansion of the ongoing existing residential housing project. 1.2 Clearance of existing land, No Land & Building: vegetation and buildings? This is an expansion project. Therefore, no clearance of existing land and/ or building is required. No Vegetation: No vegetation clearance is required for the proposed expansion project 1.3 Creation of new land uses? No There will be no change in land use as the proposal involves vertical expansion of existing block. However, the internal land-use break-up (project) is given as under: S. Particulars Existing Proposed Total No. 1. Total Plot Area 4, 366.02 sq. m. 2. FAR (permissible) (2.75) 12, 006.56 sq.m. 3. FAR (proposed) 2.50 0.48 2.98 (10,911.52 sq. m.) (2110.57 sq. m.) (13, 022.09 sq. m.) 6 Project : “Gurupragya Sumeru- Residential Apartment Project (Expansion) ” Form 1 Promoter : M/s Gurukripa Buildhome Pvt. Ltd. 4. Gross Built-up Area 19,503.09 4907.86 24, 410.95 (In sq. m.) 5. Ground coverage 35% (1528.10 sq. m.) (Permissible) 6. Ground coverage 33.24% (1451.26 Sq. m.) (Proposed) 7. Landscape Area 662.75 sq. m. (15.17%) 8. Paved areas 2, 252.01 sq. m. (53.58%) including Open Surface Parking 1.4 Pre-construction investigations No No such pre construction activity will be carried out e.g. bore houses, soil testing? as it is an expansion project. 1.5 Construction works? Yes The project envisages vertical expansion of the existing project envisaging built up area of 19,503.09 sq. m. Due to the proposed expansion, additional 2 floors (X & XI), comprising of 27 flats and 5 yoga & meditation centres will be constructed. The built up area for the additional floors will be 4, 907.86 sq. m., Therefore, the gross built-up area of the project after the expansion will be 24, 410.95 sq. m. Anticipated Environmental Impacts on physical environment: • Increase in fugitive emissions during construction phase. • Increase in traffic levels (construction & post construction phase). • Drainage • Landscape & Visual considerations The impact on physical environment will be temporary in terms of fugitive emissions. Best construction practices will be adhered to minimize the impacts. The same is tabulated as under: 7 Project : “Gurupragya Sumeru- Residential Apartment Project (Expansion) ” Form 1 Promoter : M/s Gurukripa Buildhome Pvt. Ltd. S. N. Guidance on Practices to reduce emission 1. Water Application Water will be applied by variety of methods to mitigate dust generation from the construction site. 2. Design Travelled distances will be minimized for delivery of materials 3. Storage Piles • Storage pile activity will be conducted downwind • Enclosures/ coverings will be used for storage piles • Properly shape storage piles will be considered. 4. Vehicles & • Engines & exhaust systems will be properly maintained. Equipments • Low sulphur diesel (HSD) will be used. • Idling time will be eliminated/ reduced to the minimum • Evaporative losses will be minimized 5. Material Handling & • Mud and dirt track-out and carryout will be controlled properly. Transfer systems • Material drop will be minimized at the transfer point and enclosure • Foam suppression systems will be utilized. • Loads on haul trucks will be secured. • PM emissions from spills will be prevented. • Material handling operations will be minimized. 7. Road Surfaces • On-site vehicle restrictions will be established. • Unpaved roads will be properly maintained. 1.6 Demolition works? No No demolition work will be carried out. 1.7 Temporary sites used for No Temporary housing facility for construction workers construction works or has been provided. Adequate infrastructural facilities housing of construction such as sanitation (including separate toilet (mobile) workers? for male and female workers), drinking water, crèche, cooking fuel, cookers etc has been provided to construction labours. The same will be maintained throughout the construction phase.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages26 Page
-
File Size-