World Bank Document

World Bank Document

MONTHLY OPERATIONAL SUMMARY OF BANK AND IDA PROPOSED PROJECTS (As of May 31, 1983) SecM83-597 1 FROM: Vice President and Secretary June 17, 1983 CONTENTS Section Page I. - Eastern Africa 1 - 13 Public Disclosure Authorized II, - Western Africa 14 - 29 III. - East Asia and Pacific 30 - 40 IV, - South Asia 41 - 51 V. - Europe, Middle East and North Africa 52 - 66 VI. - Latin America and Caribbean 67 78 VII, - New Projects 79 82 Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on ~1./ Lender];/ Procurement ii I, EASTERN AFRICA BOTSWANA Public Disclosure Authorized (WATER UTILITIES 22.0 (R) Water Supply III - Raising of Board presentation'scheduled for· CORPORATION) (Bank) Gaborone dam and expansion of July 5, (Co-financing with CDC treatment facilities to meet agreed for $10.8 million.) Gaborone's near-term water supply requirements; site Procurement: Main contract of investigations and preliminary about $30 million awarded for design for two future dams, raising dam. Total project cost estimated at $50 million, Ministry of Health About Family Health - Improve Appraisal mission scheduled for 11.0 effectiveness of health June, Bank Project Preparation (Bank) services delivery by Facility advance of $480,000 strengthening critical approved to finance specialists components of health systems, and employ project manager to including maternal and child help Ministry of Health prepare health and family planning. project and carry out preliminary Total project cost to be study of health organization, determined. Public Disclosure Authorized Botswana Development About DFC II - Line of credit to Appraisal report under Corporation and 12.0 Botswana Development preparation. National Development (Bank) Corporation and National Bank Development Bank for subprojects in various sectors; and technical assistance to strengthen NDB's capacity for promoting small and medium-sized enterprises, Total project cost to be determined. !/ If the Government is the borrower, the name of the department, ministry or agency which is to implement the pr~ject is given. If the Government is to relend the proceeds to another entity, the name of that entity is given. If the Government is not the borrower, the borrower's name is given in capital letters in parentheses. 2/ The amount is in millions of U,S. dollars and is approximate and tentative, 11 The le.tter (N) before the project means that the project is a new listing in the Summary; the letter (R) means that the information about the project has been revised since the last issue of the Summary, Section VII of the Summary contains a recapitulation of the new projects listed in this issue, Public Disclosure Authorized Thie column contains available information, if any, about· action with respect to the procurement of goods and services expected to be financed by the Bank or IDA. Distribution: Executive Directors and Alternates President Senior Vice Presidents Senior Management Council Vice Presidents, IFC Directors and Department Heads, Bank and IFC - 2 - Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and·Action on ~y Lender Y Procurement 4/ BURUNDI Ministry of About Water Supply II - Feasibility study is underway, Rural 15.0 Rehabilitation of 48 rural IDA Project Preparation Facility Development (IDA) aqueducts. Total project cost advance of $470,000 approved to to be determined. complete preparation. Ministry of 15.8 (R) Education III - Expansion of Approved by the Executive National (IDA) basic education and junior Directors on May 10. Credit Education secondary education. Total signed on June 9. project cost $19.3 million. Ministry of About Technical Assistance - Appraisal'report under Planning 5.0 Improving efficiency of public preparation. (IDA) sector enterprises and project preparation and monitoring capabilities. Total project cost to be determined. Ministry About Agriculture Muyinga - Pilot Project under preparation, of Agric_ulture 15.0 settlement scheme and (Priority of project to be (IDA) development of coffee and reassessed in context of sector foodcrop production in the review.) Muyinga province. Total project cost to be determined. Ministry of About Agricultural Services. Total Project under preparation. Agriculture 10.0 project cost to be determined. (IDA) COMOROS Ministry of 2.3 (R) DFC I - Line of credit for Negotiations completed, Credit Finance and (IDA) financing of agroindustry and approved by the Executive Plan small-scale industry. Directors on June 2, Ministry of About Rural Development - Land Project under preparation. Production 5.0 conservation and reafforesta­ (Co-financing with !FAD agreed,) and Industrial (IDA) tion and agricultural develop- Development .ment. Ministry of About (R) Population - Health infrastruc­ Negotiations postponed to Public Health 2.7 ture and technical assistance mid-June at Government's request. (IDA) for population activities. Total project cost estimated at $3.0 million DJIBOUTI ·Ministry of About (R) Urban Sites and Services, .Preparation mission in the Public Works/ 8.0 Housing Develop~ent, urban field, An IDA Project District of (IDA) facilities, support for small­ Preparation Facility advance of Djibouti scale industry, artisans! $500,000 has been approved to enterprise and training, Total finance primarily consultants' project cost about $20.million. services. Ministry of National About Human Resources - Possible Project under identification. Education, Youth and 6.0 components include secondary Sports (IDA) technical education, training, health services, etc. I ETHIOPIA I Ministry of To be Livestock Development and Preparation report to be revised I Agriculture deter- Marketing - sector credit for on completion of Government's mined further livestock development, comprehensive review of livestock (IDA) sector. See page 1 for footnotes. - 3 - Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on ~y Lender~/· Procurement 4/ ETHIOPIA (Cont'd) Ministry of 20.0 (R) Urban Development I - Upgrading Approved by the Executive Public Works (IDA) of existing settlements in Directors on May 17. & Housing Addis Ababa with basic services and house improvement.loans and· development of new sites for self-help housing construc­ tion. Total project cost is $26.8 million net of taxes and duties, of which $7.5 million is foreign exchange. (ETHIOPIAN To be Power III - Electric Preparation work underway. IDA ELECTRIC LIGHT deter­ transmission and possibly Project Preparation Facility AND POWER mined hydroelectric generation advance of $500,000 has been AUTHORITY (EELPA)) (IDA) facilities. approved to finance consulting services. (ETHIOPIAN 70.0 (R) Roads VIII - Second phase of Negotiations substantially TRANSPORT (IDA) 1978/82 Road Sector Program. completed. CONSTRUCTION) To improve and expand the road network; strengthen road IDA Project Preparation Facility maintenance operations and road advance of $500,000 approved to sector institutions. finance consulting services to facilitate an early start-up of the project. Ministry of 60.0 (R) Coffee Processing II and Documents under review. IDA Coffee and Tea (IDA) Marketing~ Second· phase of the Project Preparation Facility Development ongoing coffee processing advance of $700,000 approved to project. Total project cost is finance consultancy services, the $89.6 million net.of taxes and establishment of workshops and duties, of which $18.3 million other activities designed to is foreign exchange. facilitate an immediate start of the project. Ministry To be Peasant Agriculture Development Preparation work underway. of deter­ I - Support for expansion and Agriculture mined intensification of integrated (IDA) agricultural services, including construction of rural roads, seed multiplication programs; provision of training facilities in selected areas. Ministry of Mines 7.0 (R) Petroleum Exploration Promotion Negotiations substantially and Energy (MME) (IDA) - Geophysical surveys, completed. Board presentation on reprocessing of seismic data; June 14. IDA Project Preparation technical assistance to Facility advance of $1,000,000 Ministry of Mines and Energy. approved to finance exploration, Total project costs net of legal and accounting consultants taxes and duties estimated at to prepare the project. $9.4 million, of which $8.3 million is foreign exchange. Ministry of To be (R) Agricultural Research - Appraisal mission scheduled for Agriculture deter- btrengthening of the research June/July. mined capacity of the Institute of (IDA) Agricultural Research of Ethiopia. Telecommunications To be Telecommunications VI - To Appraisal report being prepared. Services of Ethiopia deter- improve and expand (Co-financing is being sought.) mined telecommunications services. (IDA) Government of To be Education VI - Basic·education Project preparation underway. Ethiopia deter- and teacher training. mined IDA See page 1 for footnotes. - 4 - Member Country, and Borrower or Amount & Stage of Process­ Implementing Probable ing and Action on .Y!!!.':I. J./ · Lender!/ Procurement !±./ KENYA Ministry of Works 7.0 (R) Urban (Secondary Towns) - Negotiations completed. Board and Housing/Ministry (Bank) Extension ·of urban development presentation on June 16, of Local Government, 22.0 programs to smaller towns. and Local (IDA) Total project cost estimated at IDA Project Preparation Facility Authorities $37.4 million, advance of $1,0 million approved to finance consultant's fees for detailed design and engineering,

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    82 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us