Details of District Wise Substations for RE Integration As on January-2021

Details of District Wise Substations for RE Integration As on January-2021

Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S South Gujarat 1 Bharuch Valiya 132/66KV Valia 50-70 2 Bharuch Valiya 66KV Daheli 40-50 3 Bharuch Netrang 66KV Netrang 4 Bharuch Netrang 66KV Datt Nagar 5 Bharuch Netrang 66KV Petiya 6 Bharuch Netrang 66KV Bitada 132 KV -- 7 Bharuch Netrang 66KV Mauza (Chasvad) Valia 10-15 8 Narmada Dediapada 66KV Dediapada 9 Narmada Dediapada 66KV Saddapani 10 Narmada Dediapada 66KV Chikda 11 Surat Umargam 66KV Chimipatal (Satvan) 12 Narmada Dediapada 66KV Bal (Mozda) 13 Bharuch Ankleshwar 132/66KV Ankleshwar 50-70 14 Bharuch Ankleshwar 66KV Ankleshwar GIDC-A 50-70 15 Bharuch Ankleshwar 66KV Ankleshwar GIDC-B 132 KV 16 Bharuch Ankleshwar 66KV Ankleshwar (Urban) Ankleshwa -- 17 Bharuch Hansot 66KV Hansot 50-70 r 18 Bharuch Ankleshwar 66KV Panoli GIDC 19 Bharuch Ankleshwer 66KV Samor (Kosmadi) 30-40 20 Valsad Atul 220/132/66KV Atul 50-70 21 Valsad Dharampur 66KV Dharampur 22 Navsari Khergam 66KV Jamanpada (Toranvera 23 Valsad Dharampur 66KV Nani Vahiyal 24 Valsad Dharampur 66KV Tiskari Talat 25 Valsad Valsad 66KV Velvachh 30-40 26 Valsad Valsad 66KV Atak Pardi (Valsad) 220 KV -- 27 Valsad Dharampur 66KV Piprol Atul 28 Valsad Valsad 66KV Valandi (Navera) 29 Valsad Valsad 66KV Magod (Meh) 30 Valsad Valsad 66KV Gundalav GIDC 31 Valsad Pardi 66KV Khadki Dungri 30-40 32 Valsad Pardi 66KV Kolak 33 Valsad Valsad 66KV Valsad City 30-40 34 Valsad Umargam 220/66KV Bhilad 50-70 35 Valsad Umargam 66KV Umargam 36 Valsad Umargam 66KV Sarigam GIDC 37 Valsad Umargam 66KV Manekpore (Manda) 220 KV 30-40 -- 38 Valsad Umargam 66KV Sanjan Bhilad 39 Valsad Umargam 66KV Vangam(Umargam-II) 40 Valsad Umargam 66KV Palgam 41 Valsad Umargam 66KV Bhilad 30-40 D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 1/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S South Gujarat 42 Navsari Chikhli 220/66KV Chikhli (Ambheta) 50-70 43 Dang Vaghai 66KV Waghai 44 Dang Ahwa 66KV Ahwa 45 Dang Ahwa 66KV Saputara 46 Navsari Chikhli 66KV Tankal 47 Navsari Chikhli 66KV Butlav 48 Navsari Chikhli 66KV Limzar 49 Navsari Vansda 66KV Pratapnagar (Doldha) 30-40 50 Navsari Vansda 66KV Vansda 51 Navsari Vansda 66KV Lachhakdi 52 Navsari Vansda 66KV Ankalachh 53 Navsari Tapi 66KV Chunavadi 54 Navsari Vansda 66KV Vangan 220 KV 55 Navsari Vansda 66 KV Mahuwas (Kevadi) -- Chikhli 56 Navsari Chikhli 66KV Chikhli 57 Navsari Khergam 66KV Khergam 58 Navsari Chikhli 66KV Fadvel (Matwad) 59 Navsari Chikhli 66KV Rankuwa (Manekpor) 60 Navsari Chikhli 66KV Rumla (Amadhra) 30-40 61 Navsari Chikhli 66KV Sadadvel 62 Navsari Chikhli 66KV Godthal 63 Navsari Chikhli 66KV Anaval 64 Surat Mahuva 66KV Vaheval 65 Navsari Vansda 66KV Bhinar 66 Valsad Valsad 66KV Dungri (Valsad) 67 Valsad Valsad 66KV Untadi(Malvan Bigri) 30-40 68 Navsari Chikhli 66KV Balwada (Wagaldhara) 69 Surat Choryasi 220/66KV Ichhapore 50-70 70 Surat Olpad 66KV Veluk 71 Surat Olpad 66KV Olpad 72 Surat Olpad 66KV Saroli 50-60 73 Surat Olpad 66KV Karamla (Varod) 74 Surat Choryasi 66KV Pala 75 Surat Surat City 66KV Adajan 220 KV -- 76 Surat Choryasi 66KV SVNIT Icchapore 30-40 77 Surat Choryasi 66KV Gujarat Hira Bourse 78 Surat Choryasi 66KV Pal 79 Surat Choryasi 66KV Bhatha ( Pal-2) 30-40 80 Surat Choryasi 66KV Variav 81 Surat Choryasi 66KV Kosad (Amroli) 30-40 82 Surat Choryasi 66KV Ichhapore 30-40 D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 2/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder. Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S South Gujarat 83 Surat Mandvi 220/66KV Kim 50-70 84 Surat Kamrej 66KV Kamrej 30-40 85 Surat Kamrej 66KV Velanja 30-40 86 Surat Kamrej 66KV Karjan 50-70 87 Surat Mangrol 66KV Pipodara 40-50 88 Surat Mangrol 66KV Pipodara-II 40-50 89 Surat Mandvi 66KV Karanj 30-40 90 Surat Mandvi 66KV Areth (Nogama) 91 Surat Mangrol 66KV Fair deal Text Park 30-40 220 KV -- 92 Surat Mandvi 66KV Umarkhadi (Maldha) Kim 93 Surat Mangrol 66KV Vankal 15-20 94 Surat Mangrol 66KV Zankhvav 95 Surat Mangrol 66KV Mosali (Mangrol) 96 Surat Mangrol 66KV Palod (Kim) 97 Surat Olpad 66KV Vadoli 30-40 98 Surat Olpad 66KV Mandroi 99 Surat Olpad 66KV Mindhi 100 Surat Mangrol 66KV Palod-2 30-40 101 Surat Surat City 66KV Mota Varachha 50-70 220 KV -- 102 Surat Choryasi 66KV Tapi 50-70 Utran 103 Surat Choryasi 132/66KV Bhestan 50-70 104 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 132 KV 105 Surat Choryasi 66KV Bhagwati -- Bhestan 106 Surat Choryasi 66KV Bhestan-B 30-40 107 Surat Choryasi 66KV Bhestan(Eklera) 108 Surat Bardoli 220/66KV Mota (Bardoli) 50-70 109 Surat Bardoli 66KV Bardoli 110 Surat Bardoli 66KV Sarbhon (Bardoli) 111 Surat Bardoli 66KV Afva(Dungar) 112 Surat Mahuva 66KV Bamaniya 30-40 113 Surat Mahuva 66KV Singod 220 KV 114 Surat Mahuva 66KV Gopla (Kharvan) Mota -- 115 Surat Mahuva 66KV Mahuva (Bardoli) 116 Surat Bardoli 66KV Kadod 117 Surat Bardoli 66KV Madhi 30-40 118 Surat Mandvi 66KV Mandvi 119 Surat Bardoli 66KV Mota 30-40 120 Surat Kamrej 66KV Parab (Mankna) 50-70 D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 3/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    32 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us