Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S South 1 Bharuch Valiya 132/66KV Valia 50-70 2 Bharuch Valiya 66KV Daheli 40-50 3 Bharuch Netrang 66KV Netrang 4 Bharuch Netrang 66KV Datt Nagar 5 Bharuch Netrang 66KV Petiya 6 Bharuch Netrang 66KV Bitada 132 KV -- 7 Bharuch Netrang 66KV Mauza (Chasvad) Valia 10-15 8 Narmada Dediapada 66KV Dediapada 9 Narmada Dediapada 66KV Saddapani 10 Narmada Dediapada 66KV Chikda 11 Umargam 66KV Chimipatal (Satvan) 12 Narmada Dediapada 66KV Bal (Mozda) 13 Bharuch Ankleshwar 132/66KV Ankleshwar 50-70 14 Bharuch Ankleshwar 66KV Ankleshwar GIDC-A 50-70 15 Bharuch Ankleshwar 66KV Ankleshwar GIDC-B 132 KV 16 Bharuch Ankleshwar 66KV Ankleshwar (Urban) Ankleshwa -- 17 Bharuch Hansot 66KV Hansot 50-70 r 18 Bharuch Ankleshwar 66KV Panoli GIDC 19 Bharuch Ankleshwer 66KV Samor (Kosmadi) 30-40 20 Atul 220/132/66KV Atul 50-70 21 Valsad Dharampur 66KV Dharampur 22 66KV Jamanpada (Toranvera 23 Valsad Dharampur 66KV Nani Vahiyal 24 Valsad Dharampur 66KV Tiskari Talat 25 Valsad Valsad 66KV Velvachh 30-40 26 Valsad Valsad 66KV Atak Pardi (Valsad) 220 KV -- 27 Valsad Dharampur 66KV Piprol Atul 28 Valsad Valsad 66KV Valandi (Navera) 29 Valsad Valsad 66KV Magod (Meh) 30 Valsad Valsad 66KV Gundalav GIDC 31 Valsad Pardi 66KV Khadki Dungri 30-40 32 Valsad Pardi 66KV Kolak 33 Valsad Valsad 66KV Valsad City 30-40 34 Valsad Umargam 220/66KV Bhilad 50-70 35 Valsad Umargam 66KV Umargam 36 Valsad Umargam 66KV Sarigam GIDC 37 Valsad Umargam 66KV Manekpore (Manda) 220 KV 30-40 -- 38 Valsad Umargam 66KV Sanjan Bhilad 39 Valsad Umargam 66KV Vangam(Umargam-II) 40 Valsad Umargam 66KV Palgam 41 Valsad Umargam 66KV Bhilad 30-40

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 1/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S South Gujarat 42 Navsari Chikhli 220/66KV Chikhli (Ambheta) 50-70 43 Dang Vaghai 66KV 44 Dang Ahwa 66KV Ahwa 45 Dang Ahwa 66KV Saputara 46 Navsari Chikhli 66KV Tankal 47 Navsari Chikhli 66KV Butlav 48 Navsari Chikhli 66KV Limzar 49 Navsari 66KV Pratapnagar (Doldha) 30-40 50 Navsari Vansda 66KV Vansda 51 Navsari Vansda 66KV Lachhakdi 52 Navsari Vansda 66KV Ankalachh 53 Navsari Tapi 66KV Chunavadi 54 Navsari Vansda 66KV Vangan 220 KV 55 Navsari Vansda 66 KV Mahuwas (Kevadi) -- Chikhli 56 Navsari Chikhli 66KV Chikhli 57 Navsari Khergam 66KV Khergam 58 Navsari Chikhli 66KV Fadvel (Matwad) 59 Navsari Chikhli 66KV Rankuwa (Manekpor) 60 Navsari Chikhli 66KV Rumla (Amadhra) 30-40 61 Navsari Chikhli 66KV Sadadvel 62 Navsari Chikhli 66KV Godthal 63 Navsari Chikhli 66KV Anaval 64 Surat Mahuva 66KV Vaheval 65 Navsari Vansda 66KV Bhinar 66 Valsad Valsad 66KV Dungri (Valsad) 67 Valsad Valsad 66KV Untadi(Malvan Bigri) 30-40 68 Navsari Chikhli 66KV Balwada (Wagaldhara) 69 Surat 220/66KV Ichhapore 50-70 70 Surat Olpad 66KV Veluk 71 Surat Olpad 66KV Olpad 72 Surat Olpad 66KV Saroli 50-60 73 Surat Olpad 66KV Karamla (Varod) 74 Surat Choryasi 66KV Pala 75 Surat Surat City 66KV Adajan 220 KV -- 76 Surat Choryasi 66KV SVNIT Icchapore 30-40 77 Surat Choryasi 66KV Gujarat Hira Bourse 78 Surat Choryasi 66KV Pal 79 Surat Choryasi 66KV Bhatha ( Pal-2) 30-40 80 Surat Choryasi 66KV Variav 81 Surat Choryasi 66KV Kosad (Amroli) 30-40 82 Surat Choryasi 66KV Ichhapore 30-40

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 2/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S South Gujarat 83 Surat Mandvi 220/66KV Kim 50-70 84 Surat Kamrej 66KV Kamrej 30-40 85 Surat Kamrej 66KV Velanja 30-40 86 Surat Kamrej 66KV Karjan 50-70 87 Surat Mangrol 66KV Pipodara 40-50 88 Surat Mangrol 66KV Pipodara-II 40-50 89 Surat Mandvi 66KV Karanj 30-40 90 Surat Mandvi 66KV Areth (Nogama) 91 Surat Mangrol 66KV Fair deal Text Park 30-40 220 KV -- 92 Surat Mandvi 66KV Umarkhadi (Maldha) Kim 93 Surat Mangrol 66KV Vankal 15-20 94 Surat Mangrol 66KV Zankhvav 95 Surat Mangrol 66KV Mosali (Mangrol) 96 Surat Mangrol 66KV Palod (Kim) 97 Surat Olpad 66KV Vadoli 30-40 98 Surat Olpad 66KV Mandroi 99 Surat Olpad 66KV Mindhi 100 Surat Mangrol 66KV Palod-2 30-40 101 Surat Surat City 66KV Mota Varachha 50-70 220 KV -- 102 Surat Choryasi 66KV Tapi 50-70 Utran 103 Surat Choryasi 132/66KV Bhestan 50-70 104 Surat Choryasi 66KV Govalak (Udhana-B) 30-40 132 KV 105 Surat Choryasi 66KV Bhagwati -- Bhestan 106 Surat Choryasi 66KV Bhestan-B 30-40 107 Surat Choryasi 66KV Bhestan(Eklera) 108 Surat Bardoli 220/66KV Mota (Bardoli) 50-70 109 Surat Bardoli 66KV Bardoli 110 Surat Bardoli 66KV Sarbhon (Bardoli) 111 Surat Bardoli 66KV Afva(Dungar) 112 Surat Mahuva 66KV Bamaniya 30-40 113 Surat Mahuva 66KV Singod 220 KV 114 Surat Mahuva 66KV Gopla (Kharvan) Mota -- 115 Surat Mahuva 66KV Mahuva (Bardoli) 116 Surat Bardoli 66KV Kadod 117 Surat Bardoli 66KV Madhi 30-40 118 Surat Mandvi 66KV Mandvi 119 Surat Bardoli 66KV Mota 30-40 120 Surat Kamrej 66KV Parab (Mankna) 50-70

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 3/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S South Gujarat 121 TapiVyara 66KV Vyara 122 TapiVyara 66KV Borakhadi 123 TapiVyara 66KV Rupwada 30-40 124 TapiVyara 66KV Chikhalvav 125 TapiVyara 66KV Magarkui 126 TapiVyara 66KV Vyara-2 127 Surat Kamrej 66KV Sampura 30-40 128 Surat Mandvi 66KV Kasal 129 Tapi Valod 66KV Bhimpor (Kanjod) 130 Surat Bardoli 66KV Manekpore 220 KV 131 Tapi Valod 66KV Valod Mota -- 132 TapiVyara 66KV Kelkui (Bardoli) 133 Tapi Dolvan 66KV Kalkwa 134 Tapi Valod 66KV Virpor (Pathakwadi) 135 Tapi Valod 66KV Karanjkhed 25-30 136 Tapi Dolvan 66KV Pathakvadi 137 TapiVyara 66KV Dolvan 138 TapiSongadh 66KV Jesingpura 139 TapiVyara 66KV Galkuva 140 TapiVyara 66KV Kapadvan 141 TapiVyara 66KV Mangaliya (Chimer) 142 TapiVyara 66KV Kalakva 143 Navsari Navsari 220/66KV Navsari 50-70 144 Navsari 66KV Billimora 145 Navsari Gandevi 66KV Gandevi 146 Navsari Gandevi 66KV 30-40 147 Navsari 66KV Sultanpur(Dandi) 148 Navsari Gandevi 66 KV Chhapar (Kotha) 220 KV -- 149 Navsari Jalalpore 66KV Eroo Navsari 150 Navsari Navsari 66KV Chhapra (Navsari -B) 30-40 151 Navsari Jalalpore 66KV Dandi 152 Navsari Navsari 66KV Navsari city 30-40 153 Navsari Jalalpore 66KV 30-40 154 Navsari Navsari 66KV Vesma 10-15 155 Surat Choryasi 220/66KV Sachin (Talangpore) 50-70 156 Surat Choryasi 66KV Sachin -B 157 Surat Choryasi 66KV Vanz (Susml) 158 Surat Palsana 66KV Erthan (Lingad) 30-40 220 KV 159 Surat Choryasi 66KV Kharvasa Sachin -- 160 Surat Palsana 66KV GETP (Talangpor 161 Navsari Jalalpore 66KV Mangrol 20-25 e) 162 Surat Choryasi 66KV Khajod (Magadalla) 163 Surat Choryasi 66KV Jiyav (Bamroli) 30-40 164 Surat Choryasi 66KV Vadod

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 4/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S South Gujarat 165 Surat Choryasi 66KV Vesu 166 Surat Choryasi 66KV Bhimrad (Sarsana) 40-50 167 Surat Choryasi 66KV Vesu-2 (Magdalla) 220 KV 168 Surat Choryasi 66KV Dumas Sachin 169 Surat Choryasi 66KV Pandesara -- 30-40 (Talangpor 170 Surat Choryasi 66KV Jiav (Pandesara-II) e) 171 Surat Choryasi 66KV Sachin -A 172 Surat Choryasi 66KV Sachin-D 30-40 173 Surat Choryasi 66KV Sachin ‘C 174 Surat Choryasi 220/66KV Popada 50-70 220 KV 175 Surat Choryasi 66KV SUSM-1 -- 30-40 Popda 176 Surat Choryasi 66KV Bhatia 177 Bharuch Wagra 220/66KV Rahiyad 50-70 220 KV 178 Bharuch Wagra 66KV Samatpore (Sambheti) 50-70 Suva -- 179 Bharuch Wagra 66KV Galenda 50-70 (Rahiyad) 180 Bharuch Wagra 66KV Suva 30-40 181 Bharuch Wagra 220/66KV Dahej 50-70 182 Bharuch Wagra 66KV Dahej 183 Bharuch Wagra 66KV Luna 220 KV -- 184 Bharuch Wagra 66KV Vadadala (Dahej) 30-40 Dahej 185 Bharuch Wagra 66KV Jolva 186 Bharuch Wagra 66KV Bhesali 187 Valsad Vapi 220/66KV Vapi 50-70 188 Valsad Dharampur 66KV Motaponda (Kakadkopar) 189 Valsad Pardi 66KV Paria 190 Valsad Pardi 66KV Chival (Dhagadmal) 191 Valsad Kaparada 66KV Panas (Amdha) 192 Valsad Pardi 66KV Nimkhal 193 Valsad Pardi 66KV Kherlav 30-40 194 Valsad Vapi 66KV Kocharava(Rata Koparali) 195 Valsad Pardi 66KV Ambach (Balda) 196 Valsad Kaparada 66KV Kaparada 220 KV -- 197 Valsad Kaparada 66KV Astol Vapi 198 Valsad Kaparada 66KV Sutharpada 199 Valsad Kaparada 66KV Shahuda 200 Valsad Umargam 66KV Damanganga GIDC 201 Valsad Umargam 66KV Karembele (Nahuli) 40-50 202 Valsad Vapi 66KV Chandor 203 Valsad Vapi 66KV GIDC -Vapi 30-40 204 Valsad Vapi 66KV GIDC Vapi -III rd. Ph. 205 Valsad Vapi 66KV Dungra 30-40 206 Valsad Vapi 66KV GIDC Vapi - IV th Ph.

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 5/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S South Gujarat 207 Valsad Vapi 66KV GIDC -Vapi Ph.-II 30-40 220 KV 208 Valsad Vapi 66KV Morai -- 30-40 Vapi 209 Valsad Vapi 66KV Morai-2 210 Surat Mangrol 400/220/66KV Kosamba 50-70 211 Bharuch Ankleshwar 66KV Panoli GIDC-2 50-70 212 Surat Mangrol 66KV Dinod 30-40 400 KV -- 213 Surat Mangrol 66KV Kosamba Kosamba 214 Surat Mangrol 66KV Kosamba-2 30-40 215 Surat Mangrol 66KV Kharach (Tarsali) 216 Surat Kamrej 220/66KV Vav 50-70 217 Surat Kamrej 66KV Kosmada 40-50 218 Surat Choryasi 66KV Godadara 219 Surat Palsana 66KV Kadodara 220 Surat Palsana 66KV Palsana 221 Surat Palsana 66KV Tatithaiya 30-40 222 Surat Palsana 66KV Jolva 223 Surat Choryasi 66KV Punakumbharia 220 KV -- 224 Surat Kamrej 66KV Laskan Vav 30-40 225 Surat Kamrej 66KV Laskana -2 226 Surat Kamrej 66KV Vav 30-40 227 Surat Olpad 66KV Sivan (Sayan west) 30-40 228 Surat Olpad 66KV Delad 229 Surat Palsana 66KV Niyol (Kadodara-2) 30-40 230 Surat Choryasi 66KV Deladva 231 Surat Choryasi 66KV Sarthana 30-40 232 Bharuch Wagra 220/66KV Wagra 50-70 233 Bharuch Wagra 66KV Vilayat 220 KV 30-40 -- 234 Bharuch Bharuch 66KV Kukarwada Wagra 235 Bharuch Bharuch 66KV Sayakha 30-40 236 TapiSongadh 66KV Borda 237 TapiSongadh 66KV Bhogvad 30-40 238 TapiSongadh 66KV Sagbara 239 TapiNizar 66KV Nizar 240 TapiNizar 66KV Kelani (Kukarmunda) 241 TapiNizar 66KV Balda/Nimbhora 30-40 242 Tapi Uchchhal 66KV Rumkitalav 220 KV -- 243 Tapi Uchchhal 66KV Uchchhal Ukai Hydro 244 Tapi Uchchhal 66KV Vadpada(Naranpur) 245 TapiSongadh 66KV Chikhali Bheshrot (Khodtalav) 246 TapiVyara 66KV Unchamala 247 TapiSongadh 66KV Vadi Bhesrot 30-40 248 TapiSongadh 66KV Waghnera 249 TapiSongadh 66KV Sisor (Panchpipla)

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 6/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S South Gujarat 250 TapiSongadh 66KV Ukai 251 TapiSongadh 66KV Songadh 252 TapiSongadh 66KV Kavla 253 TapiSongadh 66KV Kumkuva 220 KV 254 TapiSongadh 66KV Jamkhadi (Hindala) 30-40 -- Ukai Hydro 255 TapiSongadh 66KV Taparwada (Borpada) 256 TapiSongadh 66KV Vadpada (Tokarva) 257 Dang Ahwa 66KV Malangdev 258 Dang Subir 66KV Subir

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 7/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S Central Gujarat 1 Chhota Udaipur Chhotaudepur 132/66KV Chhota Udepur (Vasedi) 50-70 2 Chhota Udaipur Chhotaudepur 132/66 KV Zoz 40-50 3 Chhota Udaipur Chhotaudepur 66KV Vanar 30-40 4 Chhota Udaipur Bodeli 66KV Bodeli 5 Chhota Udaipur Bodeli 66KV Patiya (Ranbhun) 132 KV 6 Chhota Udaipur Bodeli 66KV Uchapan Chhota -- 7 Chhota Udaipur Bodeli 66KV Kharedivav 30-40 Udepur 8 Chhota Udaipur Pavi-Jetpur 66KV Vadoth (Vasedi) 9 Chhota Udaipur Pavi-Jetpur 66KV Pavi-Jetpur 10 Chhota Udaipur Pavi-Jetpur 66KV Dev Mori (Rangli chokdi) 11 Chhota Udaipur Chhotaudepur 66KV Lehvant (Rangpur Sadli) 30-40 12 Chhota Udaipur Chhotaudepur 66KV Judavant 13 Chhota Udaipur Kawant 220/66KV Kawant 50-70 14 Chhota Udaipur Kawant 66KV Bhekhadiya (Bhaka) 15 Chhota Udaipur Naswadi 66KV Sengpur (Khanda) 30-40 220 KV 16 Chhota Udaipur Naswadi 66KV Ratanpur -- Kawant 17 Chhota Udaipur Naswadi 66KV Vaghach (Gadhboriyad) 18 Chhota Udaipur Kawant 66KV Panvad 30-40 19 Chhota Udaipur Kawant 66KV Rendi (Manka) 20 Dahod Dahod 132/66KV Dahod 50-70 21 Dahod Dahod 66KV Kharedi (Chhapri) 22 Dahod Dahod 66KV Kharod (Chhapari) 30-40 132 KV 23 Dahod Dahod 66KV Kathala -- Dahod 24 Dahod Dahod 66KV Navagam 25 Dahod 66KV Garbada (Nalvai) 30-40 26 Dahod Garbada 66KV Vajelav (Jesavada) 27 Dahod Zalod 220/66 KV Rupakheda 50-70 220 KV 28 Dahod Zalod 66KV Karath (Limdi) Rupakheda -- 29 Dahod Zalod 66KV Zalod 30-40 (Zalod) 30 Dahod Zalod 66KV Gultora 31 Dahod Limkheda 132/66KV Limkheda 40-50 32 Dahod Devgadh Bariya 66KV Devgadh-Baria 33 Dahod Devgadh Bariya 66KV Piplod 30-40 132 KV 34 Dahod Devgadh Bariya 66KV Keliya (Jambusar) -- Limkheda 35 Dahod Devgadh Bariya 66KV Dabhwa (Fangiya) 36 Dahod Dhanpur 66KV Singavali (Pipero) 30-40 37 Dahod Limkheda 66KV Limkheda 30-40 38 Savli 132/66KV Manjusar 50-70 39 Vadodara Desar 66KV Desar 132 KV 40 Vadodara Savli 66KV Savli -- 30-40 Manjusar 41 Vadodara Savli 66KV Tundav 42 Vadodara Savli 66KV Alindra(Manjusar)

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 8/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S Central Gujarat 43 Vadodara Vadodara 220/132/66KV Gotri 50-70 44 Vadodara Padra 66KV Samiyala (Tandalja) 45 Vadodara Padra 66KV Padra 50-70 46 Vadodara Padra 66KV Mahuvad 47 Vadodara Vadodara 66KV Bhayli 50-70 48 Vadodara Vadodara 66KV Koyali 50-70 132 KV 49 Vadodara Vadodara 66KV Sherkhi -- Gotri 50 Vadodara Vadodara 66KV Vasana 50-70 51 Vadodara Vadodara City 66KV Vidhyutnagar 52 Vadodara Vadodara City 66KV Atladra 50-70 53 Vadodara Vadodara 66KV Gotri-B 54 Vadodara Vadodara City 66KV Subhanpura 30-40 55 Vadodara Vadodara City 66KV Gorwa 56 Kheda Mehemdabad 132/66KV Mahemdabad 50-70 57 Kheda Kheda 66KV Kheda 58 Kheda Kheda 66KV Matar 59 Kheda Kheda 66KV Samadra 20-25 60 Kheda Matar 66KV Traj 61 Kheda Matar 66KV Limbasi 132 KV 62 Kheda Vaso 66KV Vaso Mahemdab -- 63 Kheda Mehemdabad 66 KV Wathwadi 30-40 ad 64 Kheda 66KV Jinjar 65 Kheda Mehmedabad 66KV Haldarwas 66 Kheda Mehmedabad 66KV Varsola (Devki Vansol/Vamali) 67 Kheda Mahutha 66KV Shehri (Alina) 30-40 68 Kheda Mahutha 66KV Ruppura 69 Kheda Mahutha 66KV Mahudha 70 Kheda Nadiad 132/66KV Nadiad 50-70 71 Anand Anand 66KV Samarkha 72 Kheda Galteshwar 66KV Vadad 132 KV -- 73 Kheda Nadiad 66KV Chaklasi 30-40 Nadiad 74 Kheda Nadiad 66KV Malarpura (Chaklasi Party) 75 Kheda Nadiad 66KV Palaiya 76 Kheda Nadiad 66KV Kamla (Nadiad City) 30-40 132 KV 77 Kheda Nadiad 66KV Dabhan -- Nadiad 78 Kheda Mehemdabad 66KV Sandhana 30-40 79 Vadodara Vadodara 132/66KV Nandesari 50-70 80 Vadodara Savli 66KV Rania (Moxi) GIDC 81 Vadodara Vadodara 66KV Nandesari-I 30-40 132 KV -- 82 Vadodara Savli 66KV Poicha Nandesari 83 Vadodara Vadodara 66KV Nandesari-III 50-60 84 Vadodara Vadodara 66KV Ranoli GIDC 30-40

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 9/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S Central Gujarat 85 Anand Anand 132/66KV Ode 50-70 86 Anand Anand 66KV Vasad 30-40 87 Anand Anand 66KV Sarsa 88 Anand Umreth 66KV Sureli 30-40 132 KV 89 Kheda 66KV Nesh -- Ode 90 Kheda Thasara 66KV Thasra 91 Anand Anand 66KV Bhalej 30-40 92 Anand Umreth 66KV Umreth 93 Kheda Thasara 66KV Rakhiyal 94 Dascroi 132/66KV Narol 50-70 95 Ahmedabad Dascroi 66KV Jetalpur 132 KV 96 Ahmedabad Dascroi 66KV Kankaj 30-40 -- Narol 97 Ahmedabad Dascroi 66 KV Navagam 98 Ahmedabad Dascroi 66KV (Kamod) 15-20 99 Ahmedabad Dascroi 220/66KV Barejadi 50-70 100 Kheda Kheda 66KV Bidaj (Vanch) 30-40 101 Ahmedabad Dascroi 66KV Vinjol (Gatrad) 102 Ahmedabad Dascroi 66KV Bhuvaldi 103 Ahmedabad Dascroi 66KV Bilasiya 220 KV -- 104 Ahmedabad Dascroi 66KV Vehlal Barejadi 30-40 105 Ahmedabad Dascroi 66KV Kanbha 106 Ahmedabad Dascroi 66KV Hirapur 107 Ahmedabad Dascroi 66KV Dhamatwan 108 Ahmedabad Dascroi 66 KV Nenpur 109 Mehsana Kadi 400/220/66KV Vadavi 50-70 110 Ahmedabad Ahmedabad 66KV (Shela) 400 KV 111 Ahmedabad Dascroi 66KV Bopal 40-50 Vadavi 112 Ahmedabad Dascroi 66KV Science City 113 Ahmedabad Dascroi 66KV Bhadaj 114 Ahmedabad Ahmedabad 132/66KV 50-70 -- 115 Gandhinagar Gandhinagar 66KV Adalaj 30-40 116 Gandhinagar Gandhinagar 66KV Sargasan 132 KV 117 Ahmedabad Ahmedabad City 66KV Traghad Sabarmati 118 Ahmedabad Dascroi 66KV Khoraj (shaligram) 30-40 119 Ahmedabad Dascroi 66 KV Goderej City 120 Narmada Tilakwada 132/66KV Tilakwada 50-70 121 Chhota Udaipur Bodeli 66KV Chalamali (Vanadha) 122 Chhota Udaipur Bodeli 66KV Koshindra 30-40 132 KV -- 123 Chhota Udaipur Naswadi 66KV Naswadi Tilakwada 124 Narmada Tilakwada 66KV Soikuva 40-50 125 Narmada Tilakwada 66KV Namalpur

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 10/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S Central Gujarat 126 Narmada Nandod 66KV Navagam 127 Narmada Nandod 66KV Amadla (Nandod) 50-70 128 Narmada Tilakwada 66KV Katkoi 129 Narmada Nandod 66KV Garudeshwar (Devaliya) 132 KV -- 130 Narmada Tilakwada 66KV Limpura (Utavdi) 30-40 Tilakwada 131 Vadodara Dabhoi 66KV Chandod 132 Vadodara Dabhoi 66KV Pisai (Sathod) 20-40 133 Vadodara Sinor 66KV Simli (Segwa) 134 Bharuch Zagadiya 220/132/66KV Achhalia 50-70 135 Bharuch Zagadiya 66KV Rajpardi 136 Bharuch Zagadiya 66KV Zagadia 30-40 137 Bharuch Zagadiya 66KV Bhalod (Govali) 138 Bharuch Zagadiya 66KV Panetha 30-40 139 Narmada Nandod 66KV Rajpipla 220 KV 140 Narmada Nandod 66KV Mota Raipura (Gopalpura) -- Achhalia 141 Narmada Nandod 66 KV Anijara (Lachhras) 25-30 142 Narmada Nandod 66KV Bhacharwada 143 Narmada Nandod 66 KV Amletha 144 Narmada Nandod 66KV Pratapnagar (Umalla) 145 Narmada Nandod 66 KV Rajuwadiya 50-70 146 Narmada Nandod 66KV Ori 147 Ahmedabad Sanand 220/66 KV Bhat 50-70 148 Ahmedabad Sanand 400/220/66 KV Chharodi 50-70 149 Ahmedabad Sanand 66KV Vinchhiya (Mankol) 40-50 150 Ahmedabad Dascroi 66KV Bhat (Bavla) 30-40 151 Ahmedabad Sanand 66KV Changodar 152 Ahmedabad Sanand 66KV Sanathal 220 KV 153 Ahmedabad Dascroi 66KV Visalpur -- Bhat 154 Ahmedabad Sanand 66KV Chharodi 155 Ahmedabad Viramgam 66KV Thuleta 30-40 156 Ahmedabad Sanand 66KV Madhavnagar 157 Ahmedabad Sanand 66 KV Shella 158 Ahmedabad Sanand 66 KV Ambali 159 Ahmedabad Sanand 66KV Sanand GIDC 160 Panchmahal Halol 220/66KV Chandrapura 50-70 161 Panchmahal Ghoghamba 66KV Ghoghamba 162 Panchmahal Ghoghamba 66KV Simaliya (Rinchhvani) 220 KV 163 Panchmahal Halol 66KV Shivrajpur Chandrapu -- 164 Panchmahal Ghoghamba 66KV Ranjitnagar 30-40 ra 165 Panchmahal Ghoghamba 66KV Kantu (Bor) 166 Panchmahal Halol 66KV GIDC Halol B 167 Panchmahal Halol 66KV Tarkhanda (Panchdevla)

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 11/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S Central Gujarat 168 Panchmahal Halol 66KV GIDC - Halol 30-40 169 Panchmahal Kalol 66KV Madhwas 30-40 220 KV 170 Vadodara Savli 66KV Ankaliya (Nharpura) Chandrapu -- 171 Panchmahal Halol 66KV Baska 30-40 ra 172 Panchmahal Halol 66KV KhaKharia 173 Panchmahal Godhra 220/132/66KV Godhra 50-70 174 Panchmahal Kalol 66KV 175 Panchmahal Kalol 66KV Kalol 30-40 176 Panchmahal Kalol 66KV Bhukhi (Gangadiya) 177 Panchmahal Kalol 66 KV Bhadroli Khurd 178 Panchmahal Godhra 66KV Lilesara 30-40 179 Panchmahal Godhra 66KV Santroad 180 Panchmahal Morvahadaf 66KV Rajayata 181 Panchmahal Morvahadaf 66KV Chandpur 30-40 220 KV -- 182 Panchmahal Morvahadaf 66KV Mota Amalia Godhra 183 Panchmahal Godhra 66KV Jafrabad (Govindi) 184 Panchmahal Godhra 66KV Timba 185 Panchmahal Godhra 66KV Tuva(kankanapur) 20-25 186 Panchmahal Morvahadaf 66KV Gokulpur (Morwa Raina) 187 Panchmahal 66KV Shehera 188 Panchmahal Shehra 66KV Nandarva 30-40 189 Panchmahal Shehra 66KV Panam Dam 190 Panchmahal Shehra 66KV Padardi 191 Vadodara Vadodara 220/132/66KV Jambuva 50-70 192 Vadodara Dabhoi 66KV Dabhoi 193 Chhota Udaipur Sankheda 66KV Sankheda 10-15 194 Chhota Udaipur Sankheda 66KV Rampura 195 Chhota Udaipur Sankheda 66KV Bhatpur 196 Vadodara Vadodara 66KV Indrapuri 220 KV 50-70 -- 197 Vadodara Vadodara City 66KV Waghodia Road Jambuva 198 Vadodara Vadodara 66KV Gajrawadi 30-40 199 Vadodara Vadodara City 66KV Motibaug 200 Vadodara Vadodara City 66KV Tarsali 201 Vadodara Vadodara City 66KV Makarpura-GIDC-B 50-70 202 Vadodara Vadodara City 66KV Makarpura GIDC-A 203 Vadodara Waghodiya 220/66KV Waghodia 50-70 220 KV Waghodia -- 204 Vadodara Padra 220/66KV Gavasad 50-70 205 Bharuch Jambusar 66KV Sarod (Hamodpore-Kanthariya) 40-50 220 KV 206 Vadodara Padra 66KV Karkhadi -- Gavasad 207 Vadodara Padra 66KV Gavasad 50-70 208 Vadodara Padra 66KV Mobha

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 12/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S Central Gujarat 209 Bharuch Zagadiya 220/66KV Jhagadia 50-70 220 KV 210 Bharuch Zagadiya 66KV Randedi 50-70 -- Jhagadia 211 Bharuch Zagadiya 66KV Dadheda (Zagadia GIDC) 30-40 212 Bharuch Bharuch 132/66KV Bharuch 50-70 132 KV Bharuch -- 213 Bharuch Bharuch 220/132/66KV Haldarwa 50-70 214 Bharuch Amod 66KV Samni (Kurchan) 15-20 215 Bharuch Wagra 66KV Muller 216 Bharuch Bharuch 66KV Palej 40-50 217 Bharuch Bharuch 66KV Zanor (Nabipur) 20-25 218 Bharuch Bharuch 66KV Bharuch -B 220 KV 219 Bharuch Bharuch 66KV Bori (Hingala) -- 25-30 Haldarwa 220 Bharuch Wagra 66KV Wagra 221 Bharuch Bharuch 66KV Panchbatti 222 Bharuch Bharuch 66KV Kadod 30-40 223 Bharuch Bharuch 66KV Haldarva 30-40 224 Vadodara Karjan 66KV Rarod (Nareshwar) 20-25 225 Vadodara Karjan 66KV Saring 226 Kheda Kapadvanj 220/66KV Kapadwanj 50-70 227 Kheda Kapadvanj 66KV Kapadwanj GIDC 30-40 228 Kheda Kapadvanj 66KV Nirmali 229 Kheda Kapadvanj 66KV Attarsumba 25-30 230 Kheda Kapadvanj 66KV Hamirpura (Bhailakui) 231 Kheda Kapadvanj 66KV Torna 232 Kheda Kathalal 66KV Aral 30-40 233 Kheda Kathlal 66KV Chhipadi (Khalal) 234 Kheda Kathlal 66KV Kathlal 220 KV 235 Kheda Mahmedabad 66KV Aklacha 30-40 -- Kapadwanj 236 Kheda Kathlal 66KV Abhripur (Bharkunda) 237 Kheda Kathlal 66KV Anara 238 Kheda Thasra 66KV Mor Aambli 40-50 239 Kheda Thasra 66KV Chetarsumba 240 Mahisagar Balasinor 66KV Jorapura 241 Mahisagar Balasinor 66KV Relia 242 Kheda Galteshwar 66KV Sevalia 10-15 243 Kheda Balasinor 66KV Rozva 244 Mahisagar Balasinor 66KV Balasinor 245 Ahmedabad Dascroi 220/66KV Khanpur 50-70 220 KV 246 Ahmedabad Dascroi 66KV Kuha -- 30-40 Khanpur 247 Ahmedabad Dascroi 66 KV 248 Anand Anand 220/66KV Mogar 50-70 220 KV Mogar --

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 13/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S Central Gujarat 249 Bharuch Amod 220/66KV Amod 50-70 250 Bharuch Amod 66KV Sarbhan 220 KV -- 251 Bharuch Amod 66KV Ochhan (Telod -Ikhar) 10-15 Amod 252 Vadodara Karjan 66KV Handod 253 Vadodara Karjan 220/66KV Karjan 50-70 254 Vadodara Dabhoi 66KV Karvan (Kayavarohan) 255 Vadodara Karjan 66KV Simali 20-25 220 KV 256 Vadodara Sinor 66KV Sadhali -- Karjan 257 Vadodara Sinor 66KV Sinor 258 Vadodara Karjan 66KV Kashipura (Ramangamdi) 30-40 259 Vadodara Karjan 66KV Lakodara 30-40 260 Anand Anand 220/66KV Karamsad 50-70 261 Anand Anand 66KV Anand 262 Anand Anand 66KV Gopalpura 30-40 263 Anand Anand 66KV Anand Agri. University 264 Anand Anand 66KV Boriavi (Jol) 265 Anand Anand 66KV V.V. Nagar 30-40 266 Anand Anand 66KV Vithal Udyognagar 267 Anand Petlad 66KV Mahelav 268 Anand Petlad 66KV Changa 30-40 269 Kheda Nadiad 66KV Uttarsanda 270 Kheda Nadiad 66KV Akhdol 271 Anand Anand 66KV Karamsad 30-40 220 KV 272 Anand Anklav 66KV Anklav Karamsad / -- 273 Anand Anklav 66KV Bhetasi 220 KV 274 Anand Anklav 66KV Navakhal (Khedasa) Mogar 275 Anand Borsad 66KV Borsad 30-40 276 Anand Borsad 66KV Shinglav 277 Anand Anand 66KV Navli 278 Anand Anklav 66KV Khadol (Haldari) 279 Anand Borsad 66KV Ras 280 Anand Petlad 66KV Sundarna 30-40 281 Anand Petlad 66KV Virsad 282 Anand Petlad 66KV Nar 283 Anand Cambay 66KV Timba 30-40 284 Anand Petlad 66KV Petlad 285 Anand Sojitra 66KV Kasor 30-40

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 14/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S Central Gujarat 286 Ahmedabad Ahmedabad 220/132/66KV Ranasan 50-70 287 Ahmedabad Ahmedabad 66KV 288 Ahmedabad Ahmedabad 66KV 30-40 220 KV 289 Ahmedabad Ahmedabad 66KV Kathvada -- Ranasan 290 Gandhinagar Gandhinagar 66KV Muthia 30-40 291 Ahmedabad Dascroi 66KV 30-40 292 Ahmedabad Dascroi 66 KV Bhat 293 Vadodara Waghodiya 400/220/66KV Asoj 50-70 294 Vadodara Vadodara 132/66KV Fertilizarnagar 50-70 295 Vadodara Savli 66KV Khakhariya 30-40 296 Vadodara Savli 66KV Pratapnagar (Godampura) 297 Vadodara Waghodiya 66KV Asoj (Paldi) 400 KV 298 Vadodara Waghodiya 66KV Vyankatpura -- Asoj 299 Vadodara Waghodiya 66KV Jarod 30-40 300 Vadodara Vadodara 66KV Amaliyara 301 Vadodara Vadodara City 66KV Chhani-A 302 Vadodara Vadodara City 66KV Chhani -B 303 Vadodara Vadodara City 66KV Sama 304 Mahisagar Lunawada 220/66KV Savdasna Muvada 50-70 305 Mahisagar Lunawada 66KV Lunawada 306 Mahisagar Santrampur 66KV Movasa 307 Mahisagar Lunawada 66KV Kothamba 308 Mahisagar Lunawada 66KV Ved(vardhadari) 30-40 309 Mahisagar Santrampur 66KV Santrampur 310 Mahisagar Santrampur 66KV Valakhedi (Gothib)Vaneda 311 Dahod 66KV Lakhanpur 312 Dahod Fatepura 66KV Sarasva 313 Mahisagar Kadana 66KV Ditvas 220 KV 314 Mahisagar Khanpur 66KV Bakor (Lavana) 30-40 Savdasna -- 315 Mahisagar Khanpur 66KV Motakhanpur Mauda 316 Mahisagar Virpur 66KV Virpur 317 Mahisagar Balasinor 66KV Pandava (Parbia) 318 Mahisagar Lunawada 66KV Limbadiya 20-25 319 Mahisagar Virpur 66KV Salaiya 320 Mahisagar Virpur 66KV Debhari 321 Mahisagar Lunawada 66KV Budhajina Tekra 30-40 322 Aravalli Malpur 66KV Helodar 30-40 323 Mahisagar Santrampur 66KV Limda Muvadi (Moti Sarsan) 324 Mahisagar Santrampur 66KV Mora 25-30 325 Mahisagar Santrampur 66KV Malvan

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 15/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S Central Gujarat 326 Ahmedabad Bavla 220/66KV Salejada 50-70 327 Ahmedabad Bavla 220/66KV Bagodara 50-70 328 Ahmedabad Bavla 66KV Juval rupavati 329 Ahmedabad Bavla 66KV Kerala 25-30 330 Ahmedabad Sanand 66KV Zamp 331 Ahmedabad Sanand 66KV Daduka (Rethal) Maximum 50-70 332 Ahmedabad Bavla 66KV Bavla MW RE 333 Ahmedabad Sanand 66KV Nani Devti injection 334 Ahmedabad Sanand 66KV Rajoda feasible 335 Ahmedabad Sanand 66KV Moraiya 336 Ahmedabad Sanand 66KV Vendor Park 25-30 337 Ahmedabad Sanand 66KV Bol-2(GIDC) 338 Ahmedabad Sanand 66KV Sanand-2 220 KV 339 Ahmedabad Bavla 66KV Bol-1(GIDC) Salejada 340 Ahmedabad Bavla 66KV Kalyangadh 341 Ahmedabad Dholka 66KV Dholka City 30-40 342 Ahmedabad Dholka 66KV Koth 343 Ahmedabad Dholka 66KV Raipur 30-40 344 Ahmedabad Dholka 66KV Simej Maximum 50-70 345 Ahmedabad Dholka 66KV Walthera MW RE 346 Ahmedabad Dholka 66KV Ingoli road injection 347 Ahmedabad Dholka 66KV Dholka GIDC feasible 348 Ahmedabad Dholka 66KV Pisawada 30-40 349 Ahmedabad Dholka 66 KV Shetra 350 Ahmedabad Dholka 66KV Chandisar (Keliya Vasna) 30-40 351 Kheda Nadiad 66KV Navagam (Nyka) 30-40 352 Vadodara Waghodiya 220/66KV Vyankatpura 40-50 353 Panchmahal Halol 66KV Madar (Koprej) 30-40 220 KV 354 Vadodara Waghodiya 66KV Rustampura 30-40 Vyankatpur -- 355 Chhota Udaipur Bodeli 66KV Surya a 356 Vadodara Vadodara 66KV Khatamba 40-50 357 Vadodara Vadodara City 66KV Harni

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 16/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S North Gujarat 1 Ahmedabad Viramgam 220/66KV Viramgam 40-50 Maximum 70- 2 Ahmedabad Viramgam 66KV Jakhawada 15-20 220 KV 100 MW RE 3 Ahmedabad Sanand 66KV Chharodi Viramgam injection 15-20 4 Ahmedabad Viramgam 66KV Thuleta feasible 5 Gandhinagar Gandhinagar 132/66KV Chiloda 50-70 6 Gandhinagar Gandhinagar 66KV Unava 7 Gandhinagar Dehgam 66KV Sadra 8 Gandhinagar Mansa 66KV Pethapur 30-40 132 KV -- 9 Sabarkantha Prantij 66KV Kamalpur Chiloda 10 Gandhinagar Mansa 66KV Manekpur (Grambharti) 11 Gandhinagar Gandhinagar 66KV Shahpur 10-15 12 Gandhinagar Gandhinagar 66KV 30-40 13 Banaskantha 132/66KV Deesa 50-70 14 Banaskantha Deesa 66KV 15 Banaskantha Deesa 66KV Lorwada 30-40 16 Banaskantha Deesa 66KV Balodhar 132 KV -- 17 Banaskantha 66KV Manekpura Deesa Deesa 30-40 18 Banaskantha 66KV Juna Deesa 19 Banaskantha 66KV Ranpur Deesa 30-40 20 Banaskantha 66KV Kant 21 Patan 400/220/66KV Charanka 50-70 -- 400 KV 22 Patan Santalpur 66KV Santalpur -- 10-15 Charanka 23 Patan Santalpur 66KV Bamroli -- 24 Patan Patan 132/66KV Patan 40-50 25 Patan Patan 66KV Kamliwada 30-40 132 KV -- 26 Patan Saraswati 66KV Kansa Patan 10-15 27 Patan Shihori 66KV Anganwada 28 Patan Sidhpur 132/66KV Siddhpur 50-70 29 Banaskantha 66KV Basu 30-40 30 Banaskantha Vadgam 66KV Kakoshi 31 Banaskantha Vadgam 66KV 30-40 132 KV 32 Mehsana Unjha 66KV Kahoda 30-40 -- Siddhpur 33 Patan Sidhpur 6KV Khali 30-40 34 Patan Unjha / Mehsana 66KV Tundav 35 Patan Sidhpur 66KV Mudana 10-15 36 Patan Sidhpur 66KV Sujanpur 37 Sabarkantha Prantij 132/66KV Talod 50-70 38 Sabarkantha Prantij 66KV Prantij 39 Sabarkantha Prantij 66KV Talod GIDC 30-40 132 KV 40 Sabarkantha Prantij 66KV D'Muvadi -- Talod 41 Sabarkantha Prantij 66KV Tajpur 42 Sabarkantha Talod 66KV Ujediya 15-20 43 Sabarkantha Talod 66KV Harsol 30-40

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 17/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S North Gujarat 44 Banaskantha Lakhani 220/66KV Agathala 50-70 45 Banaskantha 66KV Rantila 46 BanaskanthaLakhni, Deodar 66KV Lakhani 15-20 -- 47 Banaskantha 66KV Agathala 48 Banaskantha 66KV Soni Deodar, Lakhani 30-40 49 Banaskantha 66KV Shergadh 220 KV 50 Banaskantha 66KV Kotda (D) Lakhani 30-40 Agathala 51 Banaskantha 66KV Chekara 52 Banaskantha Lakhani 66KV Motakapra 53 Banaskantha Deesa 66KV Rampura Dama 30-40 -- 54 Banaskantha Deesa 66KV Nesda 55 Banaskantha Deodar 66KV Jalota 20-25 56 Banaskantha 66KV Taruva 30-40 57 Sabarkantha Himmatnagar 220/66KV Agiyol 50-70 58 Sabarkantha Himmatnagar 66KV Dedhrota 59 Sabarkantha Himmatnagar 66KV Munpur 20-25 60 Sabarkantha Himmatnagar 66KV Hansalpur 61 Sabarkantha Himmatnagar 66KV Kali Dungar 62 Sabarkantha Himmatnagar 66KV Chandrani 15-20 63 Sabarkantha Himmatnagar 66KV Moti Demai 64 Sabarkantha Himmatnagar 66KV Kaniyol 65 Sabarkantha Prantij 66KV Amodara 20-25 66 Sabarkantha Himmatnagar 66KV Sonasan 220 KV -- 67 Sabarkantha Himmatnagar 66KV Hajipur Agiyol 30-40 68 Sabarkantha Himmatnagar 66KV Dalpur 69 Sabarkantha Himmatnagar 66KV Himmatnagar-1 70 Sabarkantha Himmatnagar 66KV Parabda 20-25 71 Sabarkantha Himmatnagar 66KV Gadhoda 72 Sabarkantha Himmatnagar 66KV Nikoda 20-25 73 Sabarkantha Himmatnagar 66KV Gadhi 74 Sabarkantha Himmatnagar 66KV Gambhoi 75 Sabarkantha Himmatnagar 66KV Rupal 20-25 76 Sabarkantha Himmatnagar 66KV Himmatnagar-2 77 Patan Bechraji / Mehsana 220/66KV Bechraji 50-70 220 KV 78 Patan Chanasma 66KV Maniyari -- 10-15 Becharaji 79 Patan Bechraji / Mehsana 66KV Modhera 80 Gandhinagar Kalol 220/66KV Chhatral 50-70 81 Gandhinagar Kalol 66KV Pansar 30-40 82 Gandhinagar Kalol 66KV Chhatral GIDC 220 KV -- 83 Gandhinagar Kalol 66KV Borisana Chhatral 30-40 84 Gandhinagar Kalol 66KV Vadsar 85 Gandhinagar Kalol 66KV Kalol 30-40

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 18/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S North Gujarat 86 Gandhinagar Kalol 66KV Dhanot 30-40 87 Mehsana Kalol 66KV Karannagar 88 Mehsana Kadi 66KV Khavad 89 Mehsana Kadi 66KV Sadra 30-40 220 KV -- 90 Mehsana Kadi 66KV Rangpurda (Nanikadi) Chhatral 91 Mehsana Kadi 66KV Nandasan 92 Mehsana Kadi 66KV Indrad (Ratnamani) 30-40 93 Mehsana Kadi 66KV Rajpur 94 Aravali Bhiloda 220/66KV Bhutiya 50-70 95 Aravali 66KV Bhiloda 96 Aravali 66KV Ubsal 97 Aravali 66KV Torada -- 98 Aravali Bhiloda, Vijaynagar66KV Bhiloda 30-40 99 Aravali 66KV Vijaynagar 100 Aravali 66KV Pal 101 Aravali 66KV Dantod 102 Aravali Bhiloda 66KV Shamlaji (Palla) 103 Aravali Bhiloda 66KV Bhetali (Mehru) 220 KV 10-15 104 Aravali Bhiloda 66KV Vankaner Bhutiya 105 Aravali Bhiloda 66KV Kheradi 106 Sabarkantha Khedbrahma 66KV Tandaliya 10-15 107 Sabarkantha 66KV Kundala Vijaynagar, Vadali 30-40 -- 108 Sabarkantha 66KV Choriwad 109 Sabarkantha 66KV Chitroda Idar 30-40 110 Sabarkantha 66KV Badoli 111 Sabarkantha Idar 132/66KV Idar 50-70 112 Sabarkantha 66KV Sudarpur Idar 15-20 113 Sabarkantha 66KV Lai Ranasan 114 Aravali Bayad, Dhansura 220/66 KV Dhansura 50-70 115 Aravali Bayad, Dhansura 66KV Ambaliyara 116 Kheda Kapadvanj 66KV Vyas Vasna 10-15 117 Aravali Bayad, Dhansura 66KV Akrund(Haripura) 118 Aravali Bayad 66KV Demai 119 Aravali Bayad 66KV Bayad 20-25 220 KV -- 120 Aravali Bayad 66KV Sangal (Vasnirel) Dhansura 121 Aravali Dhansura 66KV Vadagam 30-40 122 Aravali Bayad 66KV Untarada 30-40 123 Aravali Talod 66KV Rozad 124 Sabarkantha 66KV Punsari Talod 15-20 125 Sabarkantha 66KV Bayal

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 19/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S North Gujarat 126 Gandhinagar Gandhinagar 220/66KV Jamla 50-70 127 Gandhinagar Gandhinagar 66KV Randheja 30-40 128 Gandhinagar Gandhinagar 66KV Moti Adrej 129 Gandhinagar Kalol 66KV Soja - II 130 Gandhinagar Kalol 66KV Nardipur 20-25 131 Mehsana Kadi 66KV Karjisan 220 KV 132 Gandhinagar Kalol 66KV Veda -- Jamla 133 Gandhinagar Kalol 66KV Itla 30-40 134 Mehsana Gozariya 66KV Gozaria 135 Mehsana Gozariya 66KV Gozariya-2 136 Mehsana Gozariya 66KV Boru 30-40 137 Mehsana Gozariya 66KV Charada 138 Mehsana Gozariya 66KV Kharna 139 Aravali Modasa 220/66KV Faredi 50-70 140 Aravali Malpur, Meghraj 66KV Malpur 141 Aravali Malpur, Meghraj 66KV Limbodara 15-20 142 Aravali Malpur, Meghraj 66 KV Ramgadhi 143 Aravali Malpur, Meghraj 66KV Dugarwada (Kolikhad) 144 Aravali Meghraj 66KV Meghraj 220 KV 145 Aravali Meghraj 66KV Relawada -- Faredi 146 Aravali Meghraj 66KV Panchal 147 Aravali Meghraj 66KV Kasana 15-20 148 Aravali Meghraj 66KV Waghpur 149 Aravali Meghraj 66KV Rajpur (Ramghadi) 150 Aravali Meghraj 66KV Navagam (isari) Kantalu 151 Aravali Meghraj 66KV Lakshmanpura (Lusadiya) 152 Banaskantha Deesa 220/66KV Jangral 50-70 153 Banaskantha Deesa 66KV Sadarpur 154 Banaskantha Deesa 66KV Samau 20-25 155 Banaskantha Deesa 66KV Bhatsan 156 Banaskantha Deesa 66KV Rasana 157 Banaskantha Deesa 66KV Aseda 30-40 158 Banaskantha Deesa 66KV Samdhi 159 Banaskantha Sihori 66KV Sampra 220 KV -- 160 Banaskantha Sihori 66KV Umbari 30-40 Jangral 161 Banaskantha Sihori 66KV Kamboi 162 Banaskantha 66KV Gadh 30-40 163 Patan Sarasvati 66KV Mesar 10-15 164 Patan Sarasvati 66KV Dharusana 30-40 165 Patan Saraswati 66KV Jangral 30-40 166 Patan Saraswati 66KV Kimbuva 15-20 167 Patan Sidhpur 66KV Kalyana 30-40

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 20/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S North Gujarat 168 Gandhinagar Dehgam 66KV Rakhiyal 30-40 169 Gandhinagar Dehgam 66KV Halisa 170 Gandhinagar Dehgam 66KV Khanpur (Lihoda) 25-30 171 Gandhinagar Gandhinagar 66KV Chhala 172 Gandhinagar Dehgam 66KV Dehgam 30-40 173 Gandhinagar Dehgam 66KV Kadadar(Zak) 220 KV -- 174 Gandhinagar Dehgam 66KV Chiskari Khanpur 175 Gandhinagar Dehgam 66KV Mirapur 30-40 176 Kheda Kathlal 66KV Apruji 177 Gandhinagar Gandhinagar 66KV Kadjodra 30-40 178 Gandhinagar Gandhinagar 66KV Bahial 30-40 179 Gandhinagar Gandhinagar 66KV Kudasana(Koba) 180 Mehsana Mehsana 220/132/66KV Mehsana 50-70 181 Patan Chanasma 66 KV Dhinoj 20-25 182 Mehsana Becharji 66KV Motap 183 Mehsana Mehsana 66KV Palavasna 30-40 184 Mehsana Mehsana 66KV Nagalpur (Mehsana-II) 220 KV -- 185 Mehsana Visnagar 66KV Basna Mehsana 186 Mehsana Visnagar 66KV Udalpur 15-20 187 Mehsana Visnagar 66 KV Kherva 188 Mehsana Visnagar 66KV Bhandu 30-40 189 Mehsana Visnagar 66KV Valam 190 Mehsana Visnagar 132/66KV Visnagar 50-70 191 Mehsana Visnagar 66KV Bhalak (Transwad) 30-40 132 KV -- 192 Mehsana Visnagar 66KV Gothwa 30-40 Visnagar 193 Mehsana Visnagar 66KV Kamana 30-40 194 Mehsana Kheralu 220/66KV Kheralu 50-70 195 Mehsana Kheralu 66KV Sakari 196 Banaskantha Vadgam 66KV Moriya 197 Banaskantha Vadgam 66KV Sukhpura 20-25 198 Banaskantha Vadgam 66KV Panchada 199 Banaskantha Vadgam 66KV Kodram 200 Banaskantha Danta 66KV 220 KV 201 Banaskantha Danta 66KV Gorad -- Kheralu 202 Banaskantha Danta 66KV Kuvarsi 20-25 203 Banaskantha Danta 66KV Solsanda 204 Mehsana Satlasana 66KV Dharoi 205 Banaskantha Danta 66KV Satalsana 206 Mehsana Kheralu 66KV Kheralu 30-40 207 Mehsana Kheralu 66KV Mandali 25-30 208 Mehsana Unjha 66KV Dasaj

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 21/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S North Gujarat 209 Mehsana Kheralu 66KV Varetha 210 Mehsana Satlasana 66KV Sudasana (Umari) 10-15 211 Palanpur Satlasana 66KV Motasada 212 Mehsana Satlasana 66KV Otalpur 213 Mehsana Unjha 66KV Unjha 214 Mehsana Unjha 66KV Karali 20-25 220 KV 215 Mehsana Visnagar 66KV Umta -- Kheralu 216 Mehsana Visnagar 66 KV Thalota 217 Mehsana Vadnagar 66KV Vadnagar 218 Mehsana Vadnagar 66KV Undhai (Pipaldhar) 219 Mehsana Vijapur 66KV Jantral 10-15 220 Mehsana Vijapur 66KV Sundarpur 221 Mehsana Vijapur 66KV Ladol 222 Mehsana Jotana 220/66 KV Mitha 50-70 223 Mehsana Mehsana 66KV Asjol 15-20 224 Mehsana Mehsana 66KV Balol 25-30 225 Mehsana Jotana 66KV Mitha 30-40 226 Mehsana Jotana 66KV Suraj 227 Mehsana Jotana 66KV Kasalpur (Jotana) 220 KV 10-15 -- 228 Mehsana Jotana 66KV Mudarda Mitha 229 Mehsana Detroi / Ahmedabad 66KV Katosan 230 Mehsana Mehsana 66KV Langhnaj 231 Mehsana Mehsana 66KV Linch 30-40 232 Mehsana Mehsana 66KV Mandali 233 Mehsana Mehsana 66KV Akhaj 234 Patan Radhanpur 220/66KV Radhanpur 50-70 220 KV 235 Patan Radhanpur 66KV Bhandhvad (Dev) -- 8-10 Radhanpur 236 Patan Kankrej 66KV Jakhel 237 Banaskantha Palanpur 220/66KV Palanpur 50-70 238 Banaskantha 66KV Amirgadh 239 Banaskantha Amirgadh 66KV Iqbagadh 30-40 240 Banaskantha Amirgadh 66KV Juni Sarotri (Balundra) 241 Banaskantha Amirgadh 66KV Hebatpur 242 Banaskantha Amirgadh 66KV Bhayala 220 KV 243 Banaskantha Amirgadh 66KV -- Palanpur 244 Banaskantha Amirgadh 66KV Malan 30-40 245 Banaskantha Amirgadh 66KV Vasan 246 Banaskantha Amirgadh 66KV Palanpur-2 247 Banaskantha Vadgam, Danta 66KV Jalotra 248 Banaskantha Vadgam, Danta 66KV Danta 30-40 249 Banaskantha Vadgam, Danta 66KV Gangva

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 22/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S North Gujarat 250 Banaskantha Vadgam, Danta 66KV Gidasan 251 Banaskantha Vadgam, Danta 66KV Vadgam 25-30 252 Banaskantha Vadgam, Danta 66KV Pilucha 253 Banaskantha Vadgam, Palanpur 66KV 254 Banaskantha Vadgam, Palanpur 66KV Lalwada 25-30 255 Banaskantha Vadgam, Palanpur 66KV Gadalwada 220 KV -- 256 Banaskantha Dantiwada, 66KV Bhakar Palanpur 30-40 257 Banaskantha Dantiwada, 66KV Chandisar 258 Banaskantha Dantiwada, 66KV Dantiwada 259 Banaskantha Palanpur 66KV Rajpur (Pakhanva) 20-25 260 Banaskantha Dantiwada, 66KV Bhutedi 261 Banaskantha Palanpur 66KV Palanpur-1 30-40 262 Patan Sankhari 220/66KV Sankhari 50-70 263 Patan Sankhari 400/220/66KV Veloda (Sankhari) 50-70 264 Patan Chanasma 66KV Chanasma 265 Patan Chanasma 66KV Kamboi 8-10 220 KV 266 Patan Chanasma 66KV Ziliya (Keshani) -- Sankhari 267 Patan Patan 66KV Balisana 268 Patan Patan 66KV Manud 15-20 269 Patan Patan 66KV Norta (Mandotri) 270 Patan Unjha / Mehsana 66KV Unava 271 Banaskantha Tharad 220/66KV Tharad 50-70 272 Banaskantha 66KV Runi 273 Banaskantha 66KV Rampura 274 BanaskanthaBhabar, Vav 66KV Tithgam 10-15 275 Banaskantha 66KV Balodhan 276 Banaskantha 66Kv Bhabar 277 Banaskantha 66KV Kotarwada 278 Banaskantha 66KV Makhanu 279 Banaskantha 66KV Mera Deodar, Tharad 10-15 280 Banaskantha 66KV Chalva 220 KV 281 Banaskantha 66KV Jetda -- Tharad 282 Banaskantha 66KV Del 283 Banaskantha 66KV 284 Banaskantha 66KV Asodar Tharad 20-25 285 Banaskantha 66KV Rah 286 Banaskantha 66KV Pathamda 287 Banaskantha Tharad 66KV Tadav 8-10 288 Banaskantha 66KV Piluda 289 Banaskantha 66KV Dedarada Tharad 8-10 290 Banaskantha 66KV Dudhva 291 Banaskantha 66KV Tharad

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 23/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S North Gujarat 292 Banaskantha 220/66KV Thavar 50-70 293 Banaskantha Dhanera 66KV Dhanera 294 Banaskantha Dhanera 66KV Voda 20-25 295 Banaskantha Dhanera 66KV Samarvada 296 Banaskantha 66KV Jadiyali Lakhani 30-40 297 Banaskantha 66KV Nandala 298 Banaskantha Dhanera 66KV Dhakha 30-40 299 Banaskantha Tharad 66KV Duva 220 KV 300 Banaskantha Dhanera 66KV Jadia Thavar -- 301 Banaskantha Dhanera 66KV Bhatib 15-20 (Dhanera) 302 Banaskantha Dhanera 66KV Dharnodhar 303 Banaskantha Dhanera 66KV Kuvarala 304 Banaskantha Dhanera 66KV Lavara 30-40 305 Banaskantha Dhanera 66KV Nanuda 306 Banaskantha Dhanera 66KV Malotra 307 Banaskantha Dhanera 66KV Siya 8-10 308 Banaskantha Deesa 66KV Nanameda 309 Banaskantha Dhanera 66KV Vaktapura 310 Banaskantha Deodar 66KV Jasanvada (Khandosan) 25-30 311 Banaskantha Kankrej 66KV Terwada 312 Banaskantha Kankrej 66KV Jalmor 313 Banaskantha Sihori 66KV Sihori 15-20 314 Banaskantha Sihori 66KV Padardi 315 Banaskantha Sihori 66KV Dugrasan 20-25 316 Banaskantha Sihori 66KV Thara 317 Banaskantha Mera 66KV Mera 318 Banaskantha Mera 66KV Mitha 25-30 319 Banaskantha Mera 66KV Vadiya 320 Banaskantha Deodar 66KV Vakha 321 Banaskantha Deodar 66KV Ravel 10-15 220 KV 322 Banaskantha Deodar 66KV Chamanpura -- Deodar 323 Banaskantha Kankrej 66KV Khimana 324 Banaskantha Deesa 66KV Ramvas 15-20 325 Banaskantha Deodar 66KV Khoda 326 Banaskantha Deodar 66KV Mithipaldi 327 Banaskantha Deodar 66KV Duchakwada 20-25 328 Banaskantha Deodar 66KV Vatam 329 Banaskantha Deodar 66KV Kotda (F) 330 Banaskantha Deodar 220/66KV Deodar 50-70 331 Banaskantha Deodar 66KV Deodar 30-40 332 Banaskantha Deodar 66KV Raiya 333 Banaskantha Kankrej 66KV Kuvarva 5-25 334 Banaskantha Kankrej 66KV Arniwada

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 24/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S North Gujarat 335 Banaskantha Deesa 400/220/66KV Zerda 50-70 336 Banaskantha Dantiwada 66KV Jegol 337 Banaskantha Dantiwada 66KV Ganguvada 10-15 338 Banaskantha Dantiwada 66KV Panthwada 339 Banaskantha Deesa 66KV Vithodar 340 Banaskantha Lakhani 66KV Devsari 341 Banaskantha Lakhani 66KV Pechhdal 10-15 342 Banaskantha Deesa 66KV Nagfana 343 Banaskantha Deesa 66KV 30-40 400 KV 344 Banaskantha Deesa 66KV Ramun Kansari -- 10-15 345 Banaskantha Deesa 66KV Sherpura (Zerda) 346 Banaskantha Deesa 66KV Zerda 347 Banaskantha Dhanera 66KV Bhatram 10-15 348 Banaskantha Deesa 66KV Khimat 349 Banaskantha Deesa 66KV Dama 30-40 350 Banaskantha Deesa 66KV Samsherpura 351 Banaskantha Deesa 66KV Gadha 352 Banaskantha Dantiwada 66KV Kotha 30-40 353 Banaskantha Deesa 66KV 354 Gandhinagar 66KV Mansa Mansa 30-40 355 Gandhinagar 66KV Lodra 356 Mehsana Mansa 66 KV Vihar 357 Mehsana Visnagar 66KV Kada 30-40 358 Sabarkantha 66KV Mau Idar 359 Sabarkantha 66KV Vasai 360 Mehsana Vijapur 220/66KV Vijapur 50-70 220 KV 361 Mehsana Vijapur 66KV Pilwai (Veda) 20-25 -- Vijapur 362 Mehsana 66KV Malosan 363 MehsanaVijapur 66KV Tatosan 15-20 364 Mehsana 66KV Vadasan 365 Mehsana Vijapur 66KV Ranasan 366 Mehsana Vijapur 66KV Sanghpur 20-25 367 Mehsana Himmatnagar 66KV Derol 368 Mehsana Vijapur 66KV Hirpura 369 Gandhinagar Kalol 66KV Moti Bhoyan 30-40 370 Gandhinagar Kalol 66KV Khatraj 30-40 371 Gandhinagar Kalol 66KV Santej 372 Mehsana Kadi 66KV Kadi 30-40 400 KV 373 Mehsana Kadi 66KV Laxmipura -- Vadavi 374 Ahmedabad 66KV Katosan 30-40 375 Mehsana Kadi 66KV Meda Adraj 376 Mehsana Kadi 66KV Meda 30-50 377 Mehsana Kadi 66KV Thol

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 25/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S Saurashtra Maximum 40-50 1Rajkot Jamkandorna 132/66KV Bhayavadar 40-50 132 KV 2Rajkot 66KV Arni 20-25 MW RE Bhayavada 3Rajkot 66KV injection 10-15 r 4Rajkot Dhoraji 66KV Moti Vavdi feasible Maximum 40-50 5 Junagadh Junagadh 132/66KV Junagadh 40-50 132 KV 6 Junagadh Junagadh 66KV Bilkha MW RE 20-25 Junagadh 7 Junagadh Bhesan 66KV Chhodvadi injection 8 Jamnagar Jamnagar 132/66KV Naghedi 40-50 9 Jamnagar Jamnagar 66KV Dhichada 30-40 10 Jamnagar Jamnagar 66KV Shapar (Baid) 30-40 Maximum 40-50 11 Jamnagar Jamnagar 66KV Lakha Baval 132 KV MW RE 12 Jamnagar Jamnagar 66KV Lal Bangalow Naghedi injection 13 Jamnagar Jamnagar 66KV Bedeshwar 20-30 feasible 14 Jamnagar Jamnagar 66KV Saatrasta 15 Jamnagar Jamnagar 66KV Hapa GIDC 16 Jamnagar Jamnagar 66KV Jamnagar-C 30-40 Devbhumi 17 Jam- 66KV Vadinar 30-40 132 KV Sikka -- Dwarka 18 Gir Somnath Veraval 132/66KV Talaja 40-50 19 Gir Somnath Veraval 66KV Veraval Maximum 40-50 20 Gir Somnath Veraval 66KV Moraj 132 KV MW RE 21 Gir Somnath Veraval 66KV Adri 30-40 Talaja injection 22 Gir Somnath Talala 66KV Jepur feasible 23 Gir Somnath Veraval 66KV Ghusia 24 Rajkot 132/66KV Vikram 40-50 25 Rajkot Rajkot 66KV Punitnagar (Rajkot-B) 26 Rajkot Rajkot 66KV Mavdi Rd. (Rajkot) 27 Rajkot Rajkot 66KV Shastri medan 30-40 28 Rajkot Rajkot 66KV Laxminagar 29 Rajkot Rajkot 66KV Mota Mava 30 Rajkot Rajkot 66KV Khokhadad Maximum 40-50 31 Rajkot Rajkot 66KV Tramba 132 KV MW RE 32 Rajkot Rajkot 66KV Kherdi Vikram injection 33 Rajkot Rajkot 66KV Faldang 10-15 feasible 34 Rajkot Rajkot 66KV Magharvada 35 Rajkot Rajkot 66KV Hadmatiya (Golida) 36 Rajkot Rajkot 66KV Raj Samadhiyala 37 Rajkot Rajkot 66KV Punitnagar-II 30-40 38 Rajkot Rajkot 66KV Kotharia 30-40 39 Rajkot Rajkot 66KV Nilkanth

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 26/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S Saurashtra 40 Bhavnagar Mahuva 220/66KV Otha (Mahuva) 50-70 41 Bhavnagar Mahuva 66KV Kalsar 42 Bhavnagar Talaja 66KV Datha 15-20 Maximum 50-70 220 KV 43 Bhavnagar Talaja 66KV Pithalpur MW RE Mahuva 44 Bhavnagar Mahuva 66KV Dudhal-2 injection (Otha) 45 Bhavnagar Mahuva 66KV Nana Asrana feasible 5-10 46 Bhavnagar Mahuva 66KV Khuntvada 47 Bhavnagar Mahuva 66KV Bila 48 Gir Somnath Girgadhada 220/66KV Dhokadva 50-70 49 Gir Somnath Una 66 KV Dandi 25-30 50 Gir Somnath Girgadhada 66KV Dhokadva 51 Gir Somnath Girgadhada 66KV Gir Gadhada 30-40 52 Gir Somnath Girgadhada 66KV Rabarika Maximum 50-70 53 Gir Somnath Girgadhada 66 KV Navaugla 220 KV MW RE 54 Gir Somnath Una 66KV Una Dhokadava injection 55 Gir Somnath Una 66KV Delwada 30-40 feasible 56 Gir Somnath Una 66KV Tad (Paldi) 57 Gir Somnath Girgadhada 66KV Bodidar 10-15 58 Gir Somnath Kodinar 66KV Adpokar/ Mitiyaz 59 Gir Somnath Una 66KV Vajadi 20-25 60 Jamnagar Jamnagar 220/66KV Jamnagar 50-70 61 Jamnagar Jamnagar 66KV Aliabada 62 Jamnagar Jamnagar 66KV Jamvanthali 10-15 Maximum 50-70 63 Jamnagar Jamnagar 66KV Hamapar 220 KV MW RE 64 Jamnagar Jamnagar 66KV Jamnagar-B Jamnagar injection 65 Jamnagar Jamnagar 66KV Chella 25-30 feasible 66 Jamnagar Jamnagar 66KV Morkanda 67 Jamnagar Lalpur 66KV Rajhans (GIDC Ph-III) 30-40 68 Rajkot Kotda-sangdi 132/66 KV Padavala 50-70 Maximum 50-70 69 Rajkot Kotda-sangdi 66KV Piplana 30-40 132 KV MW RE 70 Rajkot Kotda-sangdi 66KV Kotda (S) Padavala injection 71 Rajkot Kotda-sangdi 66KV Sarvoday 50-70 feasible 72 Rajkot Kotda-sangdi 66KV Veraval (Rajkot) 73 Rajkot Gondal 220/66 KV Gondal 50-70 74 Rajkot Gondal 66KV Movia 10-15 75 Rajkot Kotda-sangdi 66KV Satapar (J) Maximum 50-70 76 Rajkot Gondal 66KV Shrinathgadh 220 KV MW RE 77 Rajkot Gondal 66KV 20-25 Gondal injection 78 Rajkot 66KV Sanathali feasible 79 Rajkot Gondal 66KV Gondal-2 40-50 80 Rajkot Gondal 66KV Gomta 25-30

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 27/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S Saurashtra 81 Rajkot Kotda-sangdi 220/66KV Kangasiyali 50-70 82 Rajkot Kotda-sangdi 66KV Shapar 83 Rajkot Kotda-sangdi 66KV Siddheshwar (Shapar-II) 50-70 Maximum 50- 220 KV 84 Rajkot Kotda-sangdi 66KV Hirni 100 MW RE Kangashiy 85 Rajkot Rajkot 66KV Vavdi injection 30-35 ali 86 Rajkot Rajkot 66KV Kothariya (Solvant) feasible 87 Rajkot Lodhika 66KV Lodhika 30-50 88 Rajkot Rajkot 66KV Khambha 89 Junagadh Keshod 220/66KV Keshod 50-70 90 Junagadh Keshod 66KV Keshod 30-35 91 Junagadh Mendarda 66KV Patrama (Khalipipli) 92 Junagadh Keshod 66KV Sondarada 10-15 93 Junagadh Keshod 66KV Ajab 94 Junagadh Keshod 66KV Koylana 95 Junagadh Maliya Hatina 66KV Vadala (Dharampur) 10-15 96 Junagadh Maliya Hatina 66KV Amrapar 97 Junagadh Keshod 66 KV Bhat Simroli Maximum 50-70 98 Junagadh Keshod 66 KV Moti Ghasri 20-25 220 KV MW RE 99 Junagadh Mangrol 66 KV Mangrol Keshod injection 100 Junagadh Keshod 66 KV Khirsara 30-35 feasible 101 Junagadh Keshod 66 KV Ishara 102 Junagadh Maliya Hatina 66KV Malia (Hatina) 103 Junagadh Maliya Hatina 66 KV Kadaya 5-10 104 Junagadh Maliya Hatina 66KV Chorwad (Gadu) 105 Junagadh Maliya Hatina 66KV Chuldi 106 Junagadh Maliya Hatina 66KV Mendarda 15-20 107 Junagadh Maliya Hatina 66KV Nani Khodiyar 108 Junagadh Mangrol 66KV Chotli Vidi 30-35 109 Junagadh Maliya Hatina 66KV Budhecha 110 Surendranagar Limbdi 220/132/66KV Limbdi 40-50 111 Surendranagar Muli 66KV Muli 10-15 220 KV 112 Surendranagar Sayla 66KV Sayla -- Limbdi 113 Surendranagar Wadhwan 66KV Tuva (Timba) 8-10 114 Surendranagar Wadhwan 66KV Surendranagar 30-40 115 Rajkot Rajkot 220/66KV Nyara 50-70 116 Rajkot Lodhika 66KV Metoda 117 Rajkot Lodhika 66KV Metoda GIDC-II 25-30 118 Rajkot Lodhika 66KV Central Metoda GIDC 119 Rajkot Lodhika 66KV Khirsara Maximum 50- 120 Rajkot 66KV PadadhriI 220 KV 100 MW RE 121 Rajkot Paddhari 66KV Sarapdad Nyara injection 122 Rajkot Paddhari 66KV Targhadi 25-30 123 Rajkot Paddhari 66KV Mota Khijadia feasible 124 Rajkot Paddhari 66KV Nyara 125 Rajkot Rajkot 66KV Ghanteshwar (Rajkot-D) 126 Rajkot Rajkot city 66KV University Rd. 50-70 127 Rajkot Rajkot 66KV Raiyadher

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 28/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S Saurashtra 128 Junagadh Vanthali 220/132/66KV Shapur 50-70 129 Junagadh Bhesan 66KV Mendpara 130 Junagadh Junagadh City 66KV Junagadh (GIDC) 131 Junagadh Junagadh City 66KV Zanzarda (JU. City) 20-25 132 Junagadh Junagadh 66KV Choki 133 Junagadh Junagadh 66KV Majevadi Maximum 50-70 134 Junagadh Mendarda 66KV Arniyana 220 KV MW RE 135 Junagadh Vanthali 66KV Mahobatpur (Navagam) 15-20 136 Junagadh Vanthali 66KV Vadala Shapur injection 137 Junagadh Manavadar 66KV Katakpara 30-40 feasible 138 Junagadh Keshod 66KV Raningpara 30-40 139 Junagadh Vanthali 66KV Shapur 25-30 140 Junagadh Vanthali 66KV Kanza 141 Junagadh Vanthali 66KV Agatrai 20-25 142 Junagadh Vanthali 66KV Bamanasa 143 Gir Somnath Kodinar 220/66KV Timbdi 50-70 144 Gir Somnath Sutrapada 66KV Moradiya 30-40 145 Gir Somnath Kodinar 66KV Sindhaj 10-15 146 Gir Somnath Kodinar 66KV Aranej 147 Gir Somnath Sutrapada 66KV Lodhwa (Singsar) 148 Gir Somnath Sutrapada 66 KV Gorakhmadi 30-40 149 Gir Somnath Sutrapada 66KV Prashnavada 150 Gir Somnath Sutrapada 66KV Kanjotar(Barda) 151 Gir Somnath Sutrapada 66KV Singasar 30-40 152 Gir Somnath Sutrapada 66KV Sutrapada 153 Gir Somnath Veraval 66KV Veraval (GIDC) 50-70 154 Gir Somnath Veraval 66KV (GIS) Maximum 50-70 155 Gir Somnath Veraval 66KV Prabhas Patan 220 KV MW RE 156 Gir Somnath Kodinar 66 KV Kodinar 30-40 Timbdi injection 157 Gir Somnath Kodinar 66 KV Devli feasible 158 Gir Somnath Kodinar 66 KV Jantrakhadi 20-25 159 Gir Somnath Kodinar 66 KV Advi 160 Gir Somnath Veraval 66KV Bhetali 20-25 161 Gir Somnath Talala 66KV Amblash 162 Gir Somnath Talala 66KV Raydi 30-40 163 Gir Somnath Talala 66KV Ankolwadi 164 Gir Somnath Talala 66KV Dhava 15-20 165 Gir Somnath Talala 66KV Jasadhar 166 Gir Somnath Sutrapada 66KV Pranchi 167 Gir Somnath Kodinar 66KV Ghantwad 30-40 168 Gir Somnath Kodinar 66KV Alidar

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 29/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S Saurashtra 169 Bhavanagar Bhavnagar 220/66KV Vartej 50-70 170 Bhavanagar Bhavnagar 66KV Bandar Road 30-40 171 Bhavanagar Bhavnagar 66Kv Sardarnagar 172 Bhavanagar Bhavnagar 66KV Sidsar 173 Bhavanagar Ghogha 66KV Mamsa-2 174 Bhavanagar Bhavnagar 66KV Bhumbhali 10-15 175 Bhavanagar Bhavnagar 66KV Bhadi 176 Bhavanagar Ghogha 66KV Nathugadh Bhavnagar 177 Bhavanagar 66KV Bhavnagar Maximum 50-70 178 Bhavanagar Bhavnagar 66KV Valketgate 30-40 220 KV MW RE 179 Bhavanagar Bhavnagar 66KV Vartej-II (Chitra) Vartej injection 180 Bhavanagar Bhavnagar 66KV Nari Road feasible 181 Bhavanagar Bhavnagar 66KV Desainagar 30-35 182 Bhavanagar Ghogha 66KV Kharakdi (Samdhiyara) 183 Bhavanagar Shihor 66KV Songadh 20-25 184 Bhavanagar Shihor 66KV Sar 185 Bhavanagar Bhavnagar 66KV Navagam (Kardej) 186 Bhavanagar Shihor 66KV Shihor 30-40 187 Bhavanagar Shihor 66KV Sihor-2 188 Bhavanagar Shihor 66KV Nesda 15-20 189 Bhavanagar Shihor 66KV Ghanghali 190 Bhavanagar Palitana 220/66KV Sagapara (Palitana) 50-70 191 Bhavanagar Bhavnagar 66KV Tana 192 Bhavanagar Ghogha 66KV Dihor Bhavnagar 193 Bhavanagar 66KV Trapaj Maximum 50-70 194 Bhavnagar Talaja 66KV Mannar 220 KV MW RE 195 Bhavnagar Ghogha 66KV Navagam (Kukad) 10-15 Sagapara injection 196 Bhavnagar Talaja 66KV Talaja feasible 197 Bhavnagar Talaja 66KV Pasvi 198 Bhavnagar Talaja 66KV Devalia 199 Bhavanagar Ghogha 66KV Timana 200 Bhavanagar Bhavnagar 66KV Godidhal 8-10 201 Junagadh Visavadar 220/66KV Visavadar 50-70 202 Junagadh Visavadar 66KV Dhebar 203 Junagadh Visavadar 66KV Bhalgam 15-20 204 Junagadh Visavadar 66KV Navihaliyad Maximum 50-70 205 Junagadh Bhesan 66KV Junidhari Gundali (TadkaPipliya) 220 KV MW RE 206 Junagadh Bhesan 66KV Chuda Visavadar injection 207 Junagadh Bhesan 66KV feasible 208 Junagadh Bhesan 66KV Chanaka 10-15 209 Junagadh Bhesan 66KV Ishwariya 210 Junagadh Bhesan 66KV Bhesan 211 Junagadh Visavadar 66KV Mota Kotda

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 30/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S Saurashtra 212 Junagadh Visavadar 66KV Ratang (Magharadi) 213 Junagadh Mendarda 66KV Itali 15-20 214 Junagadh Visavadar 66KV Baradia Maximum 50-70 215 Junagadh Visavadar 66KV Khambhaliya (Ozat) 30-40 220 KV MW RE 216 Junagadh Visavadar 66KV Govindpara (Jetalvad) 30-40 Visavadar injection 217 Junagadh Visavadar 66KV Moti Monpari 20-25 feasible 218 Junagadh Visavadar 66KV Kankchiyala 8-10 219 Junagadh Visavadar 66KV Bhutdi 220 Amreli Savarkundla 66 KV Badhada 221 Amreli Khambha 66 KV Mota Samadhiyala 8-10 222 Amreli Dhari 66 KV Devla 223 Amreli Dhari 66KV Chalala Maximum 40-50 25-30 220 KV 224 Amreli Dhari 66KV Hudali MW RE Savarkundl 225 Amreli Savarkundla 66KV Ambardi 25-30 injection a 226 Amreli Amreli 66KV Savarkundla 30-40 feasible 227 Amreli Amreli 220/66KV Savarkundla 50-70 228 Amreli Savarkundla 66KV Hathsani 25-30 229 Amreli Dhari 66KV Nagadhra 230 Bhavnagar Gariyadhar 220/66KV Mesanka 50-70 Maximum 50-70 220KV 231 Bhavnagar Gariyadhar 66 KV Gariyadhar MW RE injection 10-15 Mesanka 232 Bhavnagar Gariyadhar 66 KV Virdi feasible 233 Amreli Amreli 400/220/66KV Amreli 50-70 234 Amreli Amreli 66KV Mota Ankadiya (Limbadia) 20-25 Maximum 50-70 235 Amreli Amreli 66KV Amreli - A 400 KV MW RE 236 Amreli Amreli 66KV Amreli - B Amreli injection 8-10 237 Amreli Amreli 66KV Jaliya feasible 238 Amreli Amreli 66KV Gavadka (Amreli-C) 239 Rajkot Jetpur 400/220/66KV Jetpur 50-70 240 Amreli Kunka-vav 66KV Vadiya 241 Amreli Kunka-vav 66KV Amrapar 8-10 242 Amreli Kunka-vav 66KV Nava Ujala (Kajuri Pipaliya) 243 Amreli Kunka-vav 66KV Tori 244 Rajkot Dhoraji 66 KV Moti Parabdi (Toraniya) 25-30 245 Rajkot Jetpur 66KV Jetpur-A 20-25 Maximum 50-70 246 Rajkot Jetpur 66KV Dhoraji Bypass 20-25 400 KV MW RE 247 Rajkot Jetpur 66KV Mandlikpur Jetpur injection 248 Rajkot Jetpur 66KV Jetalsar 10-15 feasible 249 Rajkot Jetpur 66KV Arab Timbadi 250 Rajkot Jetpur 66KV Devki Galol 251 Junagadh Bhesan 66KV Khambhaliya (Mandva) 8-10 252 Amreli Kunka-vav 66KV Hanuman Khijadiya 253 Rajkot Jetpur 66KV Jetpur-B 254 Rajkot Jetpur 66KV Jetpur (Dhareshwar) 25-30 255 Rajkot Jetpur 66 KV Amrapar (Reshamadi Galol) 25-30

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 31/32 Details of district wise substations for RE integration as on January-2021 Note: (1) This list is indicative only and does not stipulate available evacuation capacity at these substations. (2) Based on application for connectivity by applicant, feasibility of point of interconnection and stregthning requirement, if any, shall be assessed. (3) Maximum RE power integration at 66 KV level shall be upto 30-50 MW for each 66 KV outlet from EHV substation and 40-70 MW at 66 KV Bus of EHV substation. (4) RE power integration at EHV level shall be finalized after detailed system study. (5) The availability of required feeder bays at each GETCO substation is to be checked seperately after receipt of an application. In acse of line bay issue at a specified substation, developer has to select nearby substation from the list. (6) Total maximum capacity for respective EHV substation (specifically in Saurashtra aera) shall be limited to the quantum mentioned. In case more than one bidder in same cluster, the connectivity shall be granted to lowest tariff bidder.

Sr. Name fo Tentative feasible Name of Name of Taluka Name of Substation RE integration (in EHV Source Remark No. District MW) S/S Saurashtra 256 Rajkot Rajkot 400/220/66KV Hadala 50-70 257 Rajkot Rajkot 66KV Navagam (Rajkot - F) 30-40 Maximum 50-70 258 Rajkot Rajkot 66KV Vijaynagar (Hadala) 30-35 400 KV MW RE 259 Rajkot Rajkot 66KV Aji Dahisarda 30-40 Hadala injection 260 Rajkot Rajkot 66KV Kagdadi 30-40 feasible 261 Rajkot Rajkot 66KV Popatpara 30-40

D:\E_Drive\RE\Web‐site‐Update\Jan‐21\RE‐Integration‐66KV‐Jan21.xlsx 32/32