Draft Universe of Projects—Revised

Draft Universe of Projects—Revised

FFYs 2020-24 TIP Universe of Projects Boston Region MPO 11/15/18 Table 1. TIP Projects to Consider for Programming REVISED 2/6/19 MassDOT Project PROJIS/TI MAPC Highway Evaluate in MPO Investment Municipality Proponent Project Name P ID Design Status Cost Estimate Subregion District 2018/2019 Program Notes Inner Core Reconstruction and Signal Improvements Newton Newton on Walnut Street, from Homer Street to 601704 25% design $ 4,648,360 ICC 6 Complete Streets Route 9 Added to the list of new projects to Boston Boston Neponset River Greenway (Phase 3) 608943 PRC-approved $ 4,972,500 ICC 6 X Bicycle and evaluate post 11/15/19 MPO meeting and Pedestrian initial TIP universe Pre-PRC; PRC- Reconstruction of Beacham Street from Everett Everett 609257 approval expected $ 9,180,000 ICC 4 X Complete Streets Broadway to the Chelsea City Line Dec. 2018 Pre-PRC; PRC- Traffic and Safety Improvements at Two Intersection Lynn Lynn 609254 approval expected $ 5,870,300 ICC 4 X Locations on Broadway Improvements Dec. 2018 Pre-PRC; PRC- Lynn Lynn Rehabilitation of Essex Street 609252 approval expected $ 16,925,000 ICC 4 X Complete Streets Dec. 2018 Staff was not able to evaluate this project Community Path, Belmont Component of Bicycle and this year. This is a section of a larger Belmont Belmont 609204 PRC approved $ 16,703,600 ICC 4 the MCRT (Phase 1) Pedestrian project that could be considered for the LRTP. Reconstruction of Tremont Street, from Boston Boston 601274 25% design $ 2,681,260 ICC 6 Complete Streets Court Street to Boylston Street Boston, Boston, Mountfort St. and Commonwealth Ave. PRC approved Intersection Staff was not able to evaluate this project 608956 $ 916,883 ICC 6 Brookline Brookline Connection (2017) Improvements this year. Reconstruction of Tremont Street, from PRC approved Boston Boston 601507 $ 4,400,000 ICC 6 Complete Streets Stuart Street to Marginal Road (1,830 ft.) (1996) Traffic Signal Improvements at Eight Intersection Boston Boston 606556 PRC approved $ 3,603,960 ICC 6 Locations Improvements Leverett Circle Pedestrian Bridge over Bicycle and Boston MassDOT 606703 PRC approved $ 11,040,000 ICC 6 Route 28, I-93 Ramps and Storrow Drive Pedestrian Reconstruction on (Route 203) Gallivan Boston Boston Boulevard, from Neponset Circle to East of 606896 PRC approved $ 11,500,000 ICC 6 Complete Streets Morton Street Intersection Improvements on (Route 203) Morton Boston Boston Street, from West of Gallivan Boulevard to 606897 PRC approved $ 11,500,000 ICC 6 Complete Streets Shea Circle Innovation Boulevard Streetscape and Cambridge Cambridge Pedestrian Improvements, between Main 604993 25% design $ 992,163 ICC 6 Complete Streets Street and Binney Street (Phase I) Beacham and Williams Street Chelsea Chelsea 609083 PRC approved $ 8,281,525 ICC 6 Complete Streets Reconstruction Reconstruction of Beacham Street, from Chelsea Chelsea na Pre-PRC ICC 6 Complete Streets Spruce St. to the Everett City Line 1 FFYs 2020-24 TIP Universe of Projects Boston Region MPO 11/15/18 Table 1. TIP Projects to Consider for Programming REVISED 2/6/19 MassDOT Project PROJIS/TI MAPC Highway Evaluate in MPO Investment Municipality Proponent Project Name P ID Design Status Cost Estimate Subregion District 2018/2019 Program Notes Reconstruction on Route 30 PRC approved Newton Newton (Commonwealth Avenue), from Weston 600932 $ 2,208,000 ICC 6 Complete Streets (1996) Town Line to Auburn Street Improvements of Route 128/I-95 and PRC approved Newton Newton 607940 $ 10,000,055 ICC 6 Complete Streets Grove Street (2014) Newton, Resurfacing and Related Work on Route 9, MassDOT 608821 PRC approved $ 7,337,000 ICC 6 Complete Streets Brookline from Dearborn Street to Natick Town Line Minuteman Advisory Group on Interlocal Coordination Littleton Littleton Reconstruction of Foster Street 609054 PRC approved $ 3,600,000 MAGIC 3 X Complete Streets MetroWest Regional Collaborative Pedestrian Hybrid Beacon Installation at Bicycle and Framingham MassDOT 608006 25% design $ 886,228 MWRC 3 Route 9 and Maynard Road Pedestrian Intersection and Signal Improvements on Part of currently programmed 608566 (FFY Marlboroug Intersection MassDOT Route 20 (East Main Street/Boston Post 604231 25% design $ 1,706,600 MWRC 3 2023); District still prioritizing; funding h Improvements Road) at Concord Road years would need to be coordinated Rehabilitation and Rail Crossing Bicycle and Ashland Ashland 608436 PRC approved $ 990,000 MWRC 3 X Improvements on Cherry Street Pedestrian Traffic Signal Installation at Edgell Road at Intersection Framingham Framingham 608889 PRC approved $ 1,680,000 MWRC 3 X Central Street Improvements Resurfacing and Related Work on Route 9, Wellesley MassDOT 607340 PRC approved $ 16,462,400 MWRC 6 Complete Streets from Dearborn Street to Natick Town Line Intersection Improvements - Boston Post Intersection Weston Weston 608940 PRC approved $ 1,219,250 MWRC 6 Road (Route 20) at Wellesley Street Improvements Weston MassDOT Reconstruction on Route 30 608954 PRC approved $ 8,117,562 MWRC 6 Complete Streets North Suburban Planning Council Reconstruction on Route 38 (Main Street), Wilmington Wilmington 608051 25% design $ 10,802,316 NSPC 4 X Complete Streets from Route 62 to the Woburn City Line Pre-PRC; PRC- Intersection Improvements at Lowell St. Intersection Wilmington Wilmington 609253 approval expected $ 3,400,000 NSPC 4 X and Woburn St. Improvements Dec. 2018 Middlesex Canal Park Improvements, from PRC approved Bicycle and Woburn Woburn Alfred Street to School Street (Phase II - 606304 $ 799,820 NSPC 4 No current updates; no FDR on file (2010) Pedestrian Segment 5) Intersection Reconstruction at Route 3 PRC approved Intersection Woburn MassDOT (Cambridge Road) and Bedford Road and 608067 $ 1,440,000 NSPC 4 Design not being advanced currently (2014) Improvements South Bedford Street 2 FFYs 2020-24 TIP Universe of Projects Boston Region MPO 11/15/18 Table 1. TIP Projects to Consider for Programming REVISED 2/6/19 MassDOT Project PROJIS/TI MAPC Highway Evaluate in MPO Investment Municipality Proponent Project Name P ID Design Status Cost Estimate Subregion District 2018/2019 Program Notes North Shore Task Force Reconstruction on Collins Street, from Danvers Danvers 602310 75% design $ 5,183,121 NSTF 4 Complete Streets Sylvan Street to Centre and Holten Streets Bicycle and Peabody MassDOT Independence Greenway Extension 609211 PRC approved $ 1,921,075 NSTF 4 X Pedestrian Beverly, Resurfacing and Related Work on Route Manchester- MassDOT 607707 PRC approved $ 2,300,000 NSTF 4 Complete Streets Possible scope change; no FDR on file 127 by-the-Sea Manchester- Manchester-by- Pine Street - Central Street (Route 127) to Pre-PRC; PNF na NSTF 4 Complete Streets No current updates; no FDR on file by-the-Sea the-Sea Rockwood Heights Road submitted 12/27/16 South Shore Coalition Improvements on Route 3A from Otis Street/Cole Road, including Summer PRC approved Hingham Hingham 605168 $ 7,500,001 SSC 5 Complete Streets Street and Rotary; Rockland Street to (2009) George Washington Boulevard Corridor Improvements and Related Work Holbrook Holbrook on South Franklin Street (Route 37) from 608543 PRC approved $ 4,000,200 SSC 5 Complete Streets No current updates; no FDR on file Snell Street to King Road Corridor Improvements along Nantasket Pre-PRC; PNF Hull Hull na SSC 5 Complete Streets No current updates; no FDR on file Avenue from Moutford Road to A Street submitted 6/30/16 Reconstruction on Route 3A, including Weymouth Weymouth Pedestrian and Traffic Signal 608231 PRC approved $ 10,780,100 SSC 6 Complete Streets Improvements Resurfacing and Related Work on Route Weymouth MassDOT 608483 PRC approved $ 2,400,000 SCC 6 Complete Streets 3A South West Advisory Planning Committee Rehabilitation on Route 16, from Route PRC approved Milford MassDOT 608045 $ 2,700,000 SWAP 3 Complete Streets 109 to Beaver Street (2014) South Main Street (Route 126) - Elm Street Pre-PRC; PNF No current updates; no FDR on file; Bellingham Bellingham na SWAP 3 Complete Streets to Douglas Drive Reconstruction submitted 3/13/17 proponent prioritizing 608887 Resurfacing and Intersection Design not being advanced currently; Franklin MassDOT Improvements on Route 140, from Beaver 607774 PRC approved $ 4,025,000 SWAP 3 Complete Streets minor improvements accomplished Street to I-495 Ramps recently 3 FFYs 2020-24 TIP Universe of Projects Boston Region MPO 11/15/18 Table 1. TIP Projects to Consider for Programming REVISED 2/6/19 MassDOT Project PROJIS/TI MAPC Highway Evaluate in MPO Investment Municipality Proponent Project Name P ID Design Status Cost Estimate Subregion District 2018/2019 Program Notes Three Rivers Interlocal Council Reconstruction of Canton Street and PRC approved Staff was not able to evaluate this project Westwood Westwood 608158 $ 2,880,000 TRIC 6 Complete Streets Everett Street (2015) this year. Intersection Westwood MassDOT Traffic Signal Improvements on Route 109 608947 PRC approved $ 453,600 TRIC 6 Improvements Multiple Subregions Multi-use Trail Connection, from Added to the list of new projects to Recreation Road to Upper Charles River ICC, Bicycle and Newton, Weston MassDOT 609066 PRC approved $ 2,661,498 6 X evaluate post 11/15/19 MPO meeting and Greenway including Reconstruction of MWRC Pedestrian initial TIP universe Pedestrian Bridge N-12-078=W-29-062 Intersection Improvements - Squantum PRC approved Intersection Milton Milton 608955 $ 979,763 ICC, TRIC 6 Street at Adams Street (2017) Improvements Reconstruction on Granite Avenue, from Milton MassDOT 608406 25% design $ 3,665,146 ICC, TRIC 6 Complete Streets Neponset River to Squantum Street Already evaluated; reconsider for programming Evaluate for the first time this year Not evaluated; no data for evaluation Subregions: ICC = Inner Core Committee. MAGIC = Minuteman Advisory Group on Interlocal Coordination. MWRC = MetroWest Regional Collaborative. NSTF = North Shore Task Force. NSPC = North Suburban Planning Council. SSC = South Shore Coalition. SWAP = South West Advisory Planning Committee. TRIC = Three Rivers Interlocal Council.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us