World Bank Document

World Bank Document

Procurement Plan (updated as of November 29, 2016) Armenia: Lifeline Roads Network Improvement Project Review By BDs/ITQ Bid- Contract Procurement No. of Procurement Invitation Contract Contractual completion Actual Contract Actual Contract price in Contract price as of Changed contract Planned/Actual Description/ Location Length (km) Bank Submission to No objection Opening Evaluation No objection Award Start Completion date* Contractor/Supplier Physical Progress % Payment Progress % Contract ID Amendment Amendment sign date ref.# Packages Method Date signing date* price in USD the contract currency contract signing date amount /in AMD/ (PRIOR / Post) the Bank Date Date A B C D F G H I J K L M N O P Q R S T U V W X Y Z AA AB AC 1. WORKS Planned LRNIP Y1-Y2 program.M10-Nerkin 12/28/2012 1/16/2013 1/22/2013 3/7/2013 4/2/2013 5/13/2013 5/14/2013 6/11/2013 6/3/2013 10/30/2015 1 Getashen-VerinGetashen-Madina km 0+000 - 10.7 “Kapavor” Ltd $2,577,604 AMD 1,084,481,024 100% 100% Actual km10+100 12/25/2012 1/16/2013 1/19/2013 3/7/2013 4/2/2013 5/13/2013 5/14/2013 5/29/2013 6/3/2013 11/15/2015 Planned 2 ICB Prior Joint Venture 4/30/2013 12/28/2012 1/16/2013 1/22/2013 3/7/2013 4/2/2013 5/2/2013 5/17/2013 6/3/2013 12/26/2014 “Zangezurtransbuld” 2 LRNIP Y1-Y2 program. M12-Kornidzor 5.3 $1,699,252 AMD 691,674,275 100% 100% OJSC and Actual 12/25/2012 1/16/2013 1/19/2013 3/7/2013 4/2/2013 4/30/2013 5/2/2013 5/17/2013 6/3/2013 12/26/2014 “Kamurjshin” CJSC Planned LRNIP Y1-Y2 program.Mayakovski-Nor 1/9/2013 1/20/2013 2/4/2013 3/19/2013 4/6/2013 4/29/2013 4/30/2013 5/28/2013 6/3/2013 12/26/2014 3 Actual Gyugh-Kotayk-Kaputan-Zovashen km 0+000 - 17.4 1 ICB Prior “Khachhar” LLC $4,053,026 AMD 1,644,136,756 100% 100% km4+500 and km 7+000 - km 19+800 1/9/2013 1/31/2013 2/4/2013 3/19/2013 4/6/2013 4/29/2013 4/30/2013 5/22/2013 6/3/2013 12/26/2014 Planned 4/29/2013 LRNIP Y1-Y2 program.M1-Agarak-Byurakan- 12/28/2012 1/16/2013 1/22/2013 3/6/2013 3/29/2013 4/30/2013 5/28/2013 6/3/2013 12/26/2014 “Ararat-Chanshin” 4 Actual 8.7 $2,613,750 AMD 1,063,443,013 100% 100% Antarut km 0+000 – km8+650 12/25/2012 1/16/2013 1/19/2013 3/6/2013 3/29/2013 4/29/2013 4/30/2013 5/17/2013 6/3/2013 12/26/2014 LLC Planned 12/28/2012 1/16/2013 1/22/2013 3/6/2013 3/29/2013 4/29/2013 4/30/2013 5/28/2013 6/3/2013 6/20/2015 LRNIP Y1-Y2 program.M5-Nor Kesaria- 5 Actual 5.3 3 ICB Prior “Sisiani FPAT” LLC $1,543,140 AMD 627,792,289 100% 100% Shenavan-Getashen km1+900-km6+700 12/25/2012 1/16/2013 1/19/2013 3/6/2013 3/29/2013 4/29/2013 4/30/2013 5/20/2013 6/3/2013 6/20/2015 Planned 12/28/2012 1/16/2013 1/22/2013 3/6/2013 3/29/2013 4/29/2013 4/30/2013 5/28/2013 6/3/2013 12/4/2014 6 Actual LRNIP Y1-Y2 program.M7-Arevashogh 2.5 “Arghishti-1” LLC $907,986 AMD 368,924,535 100% 100% 12/25/2012 1/16/2013 1/19/2013 3/6/2013 3/29/2013 4/29/2013 4/30/2013 5/20/2013 6/3/2013 12/4/2014 Planned Public Disclosure Authorized 2/20/2013 3/15/2013 3/26/2013 5/8/2013 6/7/2013 7/3/2013 7/3/2013 8/1/2013 7/22/2013 12/30/2016 Variation Order 1 10/25/2013 -12,888,843 Actual Variation Order 2 10/30/2013 5,983,359 LRNIP Y1-Y2 program. Joint venture of Variation Order 3 6/11/2014 5,121,606 Rehabilitation&Мaintenance of M9-Arteni- “KHACHHAR” Contract CW-ICB-LRNIP - 7 23.4 1 ICB Prior 1/31/2016 $5,595,681 AMD 2,288,257,723 100% 99% AMD 2,295,071,870 Aragats-Getap km 25+940 - km 49+250 road LLC and “Kapavor” 2013/4 6/7/2013 7/3/2013 Variation Order 4 12.08.2014 -1,649,864 (R&M Pilot project) 2/26/2013 3/21/2013 3/26/2013 5/8/2013 7/3/2013 7/18/2013 7/22/2013 Ltd Variation Order 5 10/17/2014 -7,547,369 Variation Order 6 12/20/2014 1,880,820 Variation Order 7 12/22/2015 2,286,144 Planned LRNIP Y3-Y4 program.Road Safety and 3/13/2015 4/14/2015 4/20/2015 4/27/2015 5/1/2015 5/10/2015 12/30/2016 Contract CW-NCB-LRNIP- Varation Order 1 7/10/2015 -107,660 8 Black Spot improvement (CW-NCB-LRNIP- 1 NCB Post N/A N/A N/A Khachhar LTD 1/1/2016 $216,517 AMD 103,425,450 100% 100% AMD 107,901,184 Actual 2015/12-RS 2015/12-RS) - 4/9/2015 5/5/2015 5/25/2015 5/25/2015 6/1/2015 6/8/2015 12/17/2015 Varation Order 2 12/9/2015 -4,368,074 Planned 2/17/2015 3/10/2015 3/12/2015 4/13/2015 4/22/2015 4/28/2015 4/28/2015 5/1/2015 5/10/2015 12/30/2017 Varation Order 1 9/14/2015 7,259,932 Actual LRNIP Y3-Y4 program.Agarak- Yahdan- Koghes-Mghart-Arevatsag-KarmirAgheg-Tsater- Varation Order 2 10/9/2015 -8,176,980 Aygehat-Ardvi- Odzun-M6, km0+000- Contract CW-NCB-LRNIP- 9 15.7 1 NCB Prior Khachhar LTD 11/1/2016 $3,005,286 AMD 1,414,360,538 100% 98% AMD 1,421,000,000 km15+706 (CW-NCB-LRNIP -2015/3) 2015/3 Variation Order 3 5/10/2016 -821,390 2/17/2015 3/11/2015 3/13/2015 4/14/2015 5/8/2015 5/19/2015 5/20/2015 6/1/2015 6/8/2015 8/9/2016 Variation Order 4 7/26/2016 -1,962,474 Variation Order 5 8/12/2016 -2,938,550 Planned 2/17/2015 3/12/2015 3/16/2015 4/16/2015 4/24/2015 4/30/2015 5/1/2015 5/4/2015 5/14/2015 12/30/2017 Variation Order 1 9/24/2015 -21,409,603 Actual Variation Order 2 12/17/2015 3,045,239 LRNIP Y3-Y4 program.Agarak- Yahdan- Contract CW-NCB-LRNIP- Koghes-Mghart-Arevatsag-KarmirAgheg-Tsater- 6.2 Chanaparh LLC 11/4/2016 $905,292 AMD 434,847,209 100% 90% AMD 453,888,971 2015/2. lot1 Varation Order 3 5/13/2016 3,409,248 Aygehat-Ardvi- Odzun-M6, km15+706- 2/17/2015 3/11/2015 3/13/2015 4/14/2015 5/8/2015 5/20/2015 5/20/2015 6/4/2015 6/11/2015 8/8/2016 10 km21+900 (lot1) and 2 NCB Prior Varation Order 4 8/8/2016 -3,650,926 km21+900-km28+240 (lot2) (CW-NCB-LRNIP-2015/2, lot1 and lot2) Varation Order 5 8/11/2016 -435,720 Planned 2/17/2015 3/12/2015 3/16/2015 4/16/2015 4/24/2015 4/30/2015 5/1/2015 5/4/2015 5/14/2015 12/30/2017 Contract CW-NCB-LRNIP- Varation Order 1 9/23/2015 -25,691,028 6.3 Argishti-1 LTD 11/5/2016 $1,747,341 AMD 835,936,865 100% 100% AMD 835,999,999 Actual 2015/2. lot 2 Public Disclosure Authorized 2/17/2015 3/11/2015 3/13/2015 4/14/2015 5/8/2015 5/20/2015 5/21/2015 6/5/2015 12.06..2015 12/2/2015 Varation Order 2 11/10/2015 25,627,894 Planned N/A N/A 3/17/2015 4/17/2015 4/27/2015 N/A 5/2/2015 5/4/2015 5/14/2015 12/30/2017 Variation Order 1 12/17/2015 -14,494,929 LRNIP Y3-Y4 program.Agarak- Yahdan- Actual Koghes-Mghart-Arevatsag-KarmirAgheg-Tsater- Aygehat-Ardvi- Odzun-M6, Access to Ardvi, Contract CW-NCB-LRNIP- 11 3.5 1 NCB Post Chanaparh LLC 11/2/2016 $536,134 AMD 256,194,462 100% 90% AMD 258,950,952 Variation Order 2 5/16/2016 13,870,260 km0+000-km2+571 and Access to Mghart, 2015/6 km0+000-km0+907 N/A N/A 3/13/2015 4/14/2015 5/25/2015 N/A 5/25/2015 6/2/2015 6/9/2015 8/8/2016 (CW-NCB-LRNIP -2015/6) Variation Order 3 8/5/2016 -2,131,821 Planned N/A N/A 3/17/2015 4/17/2015 4/27/2015 N/A 5/2/2015 5/4/2015 5/14/2015 12/30/2017 Variation Order 1 12/17/2015 -24,886,332 LRNIP Y3-Y4 program.Agarak- Yahdan- Actual Koghes-Mghart-Arevatsag-KarmirAgheg-Tsater- Aygehat-Ardvi- Odzun-M6, Access to Contract CW-NCB-LRNIP- 12 Arevatsag-Tsater km0+000-km3+877 and 7.8 1 NCB Post Chanaparh LLC 11/2/2016 $1,114,113 AMD 532,030,232 100% 90% AMD 513,887,775 2015/7 Variation Order 2 12/17/2015 40,613,190 Section Arevatsag-Karmir Aghek km0+000- N/A N/A 3/13/2015 4/14/2015 5/25/2015 N/A 5/25/2015 6/2/2015 6/9/2015 8/8/2016 km3+973 (CW-NCB-LRNIP -2015/7) Variation Order 3 8/5/2016 2,415,599 LRNIP Y3-Y4 program.M2-Shaki-Sisian- Planned Tolors-Bnunis-Torunik-Dastakert, km0+000- N/A N/A 3/19/2015 4/20/2015 4/28/2015 5/4/2015 5/5/2015 5/6/2015 5/14/2015 12/30/2017 km6+000 and access to Shaki km 0+000 - km 6.6 Actual 0+600 (lot1) and km6+000-km9+340 (lot2) N/A N/A 3/18/2015 4/20/2015 5/25/2015 N/A 5/25/2015 5/27/2015 6/3/2015 12/15/2015 Contract CW-NCB-LRNIP- 13 2 NCB Post Sisiani FPAT LLC 10/27/2016 $3,021,938 AMD 1,447,939,105 100% 100% AMD 1,271,011,071 Variation Order 1 11/30/2015 176,928,034 2015/8.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    3 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us