1:400 Q: from Where Signal Overlap Distanc

1:400 Q: from Where Signal Overlap Distanc

Q: Name a fixed signal which cannot be placed on a separate SHORT QUESTION-ANSWER post? A: Calling on signal. Q: What is the maximum speed of a train guided by shunt Q: Which gradient is treated as steep gradient for roller bearing signal? or bogie wagon? A: 15KMPH A: 1:400 Q: What is the maximum speed of train in automatic block Q: From where signal overlap distance is reckoned in case of system during fog if automatic signal is found double single line? yellow? A: From outermost trailing point. A: 30 KMPH. Q: What is the distance of passenger warning board from first Q: What is the speed of train at Dock platform? stop signal of a station or gate stop signal? A: 10 KMPH. A: 960meters. Q: What is the speed of train if automatic brake fails? Q: Block overlap distance or signal overlap distance- which can A: 8KMPH. be substituted? A: Signal overlap distance. Q: What is the speed of train during non-interlock work? A: 15 KMPH. Q: What should be the minimum gradient in ghat section? A: 1:200 and gradient is continuous Q: What is the maximum speed of train during fog in absolute block system? Q: From where signal overlap distance in multiple aspect A: 60 KMPH. signalling is counted in case of single line? A: 120 meters from outermost trailing point. Q: What is the validity period of Station Working Rule? Q: What is the colour of the post of inner distance signal? A: 5 correction slip or 5 years whichever is earlier. A: White. Q: What is the distance between Starter and Advance starter Q: What signals are used to receive a train in obstructed line? signal at a station in double line section? A: Calling on /Shunt signal. A: 120 meters. Q: What form will be issued to send ART in occupied block A: Booked speed. section in absolute block system? A: TA-602. Q: Mock Drill is done once in every -------- months. A: 2 months. Q: What form will be issued in case of prolonged failure of automatic signals but communication not available? Q: Distance of caution indicator board from speed restriction A: TB-912. zone is --------. A: 1200 meters. Q: What form will be issued in case of single line working on double line in absolute block system? Q: Turn out time of ART at night is--------------. A: TD-602 A: 45 minutes. Q: Name a form which is issued by guard to the driver? Q: Turn out time of medical van in case of single exit siding is - A: T-609. -----. A: 25 minutes. Q: What is the form number of Fog Signal Register? A: OPT-124. Q: In case of alarm chain pulling the whistle blown by the driver is -------- Q: How many parts are there in OPT-124? A: Two short one long. A: 4 parts (Particulars, Stock, Use, Testing- PSUT) Q: In case of train parting whistle blown by driver is------- Q: What form will be issued in case of prolonged failure of A: Long short long short. automatic signals but communication available? A: TD-912. Q: If railway crane is required it will be available at--------- in Q: What form is used in case of total failure of communication our Division. on double line in absolute block system? A: Beliaghata(Sealdah) A: TC-602. Q: What will be the speed of train via wrong line during single Q: What will be the speed of train in case of total failure of line working on double line on automatic block system? communication in double line? A: Not more than 25 kmph. A: 25/10/ KMPH/WP Q: In case of point zone track failure which button is used to Q: What will be the speed of second and subsequent train in operate point? case of single line working on double line in absolute block A: EWN button. system? Q: For cancelling signal overlap which button is used? A: Line close indication-yellow, line free indication-green A: EOVN button. and Line clear blocking key-In position. Q: What is the shunting speed of a coaching vehiclewith Q: Which button is to be pressed in UFSBI to stop section occupants? Buzzer? A: 5-8 KMPH. A: ACKN black button. Q: How many appendices are there in SWR? A: 7 appendices Q: To take line clear via UFSBI which buttons to be pressed? Q: What safety distance should be maintained with live OHE? A: Bell button (black) and train going to button (red) A: 2 meter (7 feet) simultaneously. Q: What is described in Appendix 7 of SWR? Q: In case of failure of BPAC what is the first duty of SM after A: Working of trains in Electrified Sections. arrival of a train at his station? A: To ensure complete arrival of the train by seeing tail Q: Which buttons are used to cancel line clear in UFSBI? board or tail lamp or by issuing T/1410. A: Cancel co-operation button and Cancel button. Q: In case of failure of BPAC before resetting it what is the duty Q: Fog Signal Post is provided at ------ meters away from first of station master? stop signal of a block station. A: To notice error code. If we start resetting error codes A: 270 meters. cannot be observed. Q: Which officer put his signature in appendix D of SWR? Q: Accidents are classified in how many heads? A: Sr. DOM. A: 5 heads. Q: Which officers put their signature in SWR? Q: How many categories of accidents are there in I R? A: DOM and DSTE. A: 16 categories. Q: What is the full form of UFSBI? Q: During accident what is the first duty of SM? A: Universal Fail Safe Block Interface. A: To note down the time of first information. Q: Before asking line clear through UFSBI what should be Q: Can dead loco be attached with super fast train? verified by SM? A: Yes. Q: What is the normal speed of DMT? Q: Name an approved substitute of signal overlap. A: 40 Kmph. A: Sand Hump. Q: What is the speed of B class ODC? Q: Maximum how many persons can travel on a heavy duty A: 40/16 kmph.(straight route/curvature) motor trolley? A: 16 persons Q: What is the speed of C class ODC? A: 25/8kmph/dead slow.(Straight route/curvature/while Q: Minimum how many persons should travel on a motor passing a fixed structure) trolley on S/L? A: 6 persons. Q: Whose approval is needed to run C class ODC? A: CRS. Q: Can we take off last stop signal for shunting? A: No. Q: During foggy weather what is the maximum speed of train in automatic block system if the automatic signal is double Q: What is the separation distance between two motor trolleys? yellow? A: 100 meters A: 30 Kmph. Q: What is the separation distance between train and trolley? Q: During foggy weather what is the maximum speed of train A: 150 meters. in absolute block system and in automatic block system if automatic signal remains in green position? Q: how to receive a train on a non signalled line? A: 60 kmph. A: Bypiloting with T/409. Q: What is ruling gradient? Q: What register is kept by trackman to take signature of A: Steepest gradient of the section is called ruling driver at stop indication board? gradient. A: Restriction Book. Q: Can shunt signal be placed below advance starter? Q: What does oooooo(6) beats indicate? A: Yes. A: Danger or obstruction. Q: Why T/431 form is used? Q: During failure under which code can Relay room key be A: Train Examination advice memo. drawn? A: Code 5 Q: Is repeating signal a stop signal? A: No. A: Particulars of fog signal man and their assurance. Q: Goods warning board is provided at what distance from first stop signal or gate stop signal? Q: What is written on OP/T124 part-II? A: 1400 meters. A: Particulars of receipt of detonators and stock of detonators. Q: Goods warning board is provided at what distance from first stop signal or gate stop signal in Rajdhani route? Q: What is written on OPT-124 Part-III? A: 1500 meters. A: Particulars of fog, fog signal man on duty, number of detonators used, date, and time. Q: What is the use of track circuit? A: It indicates presence of vehicle in the portion of track. Q: What is written on OP/T124 Part-IV? A: Particulars of testing of detonators. Q: For reception of train in non signalled line, how far line should be kept clear? Q: What is the distance between speed indicator and speed A: Up to outermost trailing point of the non signalled line. restriction zone? A: 30 meters. Q: What is the authority to proceed on double line for motor trolley? Q: What is the distance between stop indicator and speed A: T/1525. restriction zone? A: 30 meters. Q: What is the form number of Conditional line clear ticket for down line used in case of total failure of communication on Q: What is the speed of goods train in case of bad riding in the single line? section? A: T/H602. A: 16 kmph. Q: What is the maximum number of person to board on a Q: For how long records of caution orders are preserved in motor trolley on S/L & D/L? station? A: 10 A: One year. Q: Before giving line clear to a train SM will exchange private Q: For how long records of accident cases of serious nature is number with the gate man of non-interlock gate with what preserved in station? information? A: 5 years.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    51 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us