Q: Name a fixed signal which cannot be placed on a separate SHORT QUESTION-ANSWER post? A: Calling on signal. Q: What is the maximum speed of a train guided by shunt Q: Which gradient is treated as steep gradient for roller bearing signal? or bogie wagon? A: 15KMPH A: 1:400 Q: What is the maximum speed of train in automatic block Q: From where signal overlap distance is reckoned in case of system during fog if automatic signal is found double single line? yellow? A: From outermost trailing point. A: 30 KMPH. Q: What is the distance of passenger warning board from first Q: What is the speed of train at Dock platform? stop signal of a station or gate stop signal? A: 10 KMPH. A: 960meters. Q: What is the speed of train if automatic brake fails? Q: Block overlap distance or signal overlap distance- which can A: 8KMPH. be substituted? A: Signal overlap distance. Q: What is the speed of train during non-interlock work? A: 15 KMPH. Q: What should be the minimum gradient in ghat section? A: 1:200 and gradient is continuous Q: What is the maximum speed of train during fog in absolute block system? Q: From where signal overlap distance in multiple aspect A: 60 KMPH. signalling is counted in case of single line? A: 120 meters from outermost trailing point. Q: What is the validity period of Station Working Rule? Q: What is the colour of the post of inner distance signal? A: 5 correction slip or 5 years whichever is earlier. A: White. Q: What is the distance between Starter and Advance starter Q: What signals are used to receive a train in obstructed line? signal at a station in double line section? A: Calling on /Shunt signal. A: 120 meters. Q: What form will be issued to send ART in occupied block A: Booked speed. section in absolute block system? A: TA-602. Q: Mock Drill is done once in every -------- months. A: 2 months. Q: What form will be issued in case of prolonged failure of automatic signals but communication not available? Q: Distance of caution indicator board from speed restriction A: TB-912. zone is --------. A: 1200 meters. Q: What form will be issued in case of single line working on double line in absolute block system? Q: Turn out time of ART at night is--------------. A: TD-602 A: 45 minutes. Q: Name a form which is issued by guard to the driver? Q: Turn out time of medical van in case of single exit siding is - A: T-609. -----. A: 25 minutes. Q: What is the form number of Fog Signal Register? A: OPT-124. Q: In case of alarm chain pulling the whistle blown by the driver is -------- Q: How many parts are there in OPT-124? A: Two short one long. A: 4 parts (Particulars, Stock, Use, Testing- PSUT) Q: In case of train parting whistle blown by driver is------- Q: What form will be issued in case of prolonged failure of A: Long short long short. automatic signals but communication available? A: TD-912. Q: If railway crane is required it will be available at--------- in Q: What form is used in case of total failure of communication our Division. on double line in absolute block system? A: Beliaghata(Sealdah) A: TC-602. Q: What will be the speed of train via wrong line during single Q: What will be the speed of train in case of total failure of line working on double line on automatic block system? communication in double line? A: Not more than 25 kmph. A: 25/10/ KMPH/WP Q: In case of point zone track failure which button is used to Q: What will be the speed of second and subsequent train in operate point? case of single line working on double line in absolute block A: EWN button. system? Q: For cancelling signal overlap which button is used? A: Line close indication-yellow, line free indication-green A: EOVN button. and Line clear blocking key-In position. Q: What is the shunting speed of a coaching vehiclewith Q: Which button is to be pressed in UFSBI to stop section occupants? Buzzer? A: 5-8 KMPH. A: ACKN black button. Q: How many appendices are there in SWR? A: 7 appendices Q: To take line clear via UFSBI which buttons to be pressed? Q: What safety distance should be maintained with live OHE? A: Bell button (black) and train going to button (red) A: 2 meter (7 feet) simultaneously. Q: What is described in Appendix 7 of SWR? Q: In case of failure of BPAC what is the first duty of SM after A: Working of trains in Electrified Sections. arrival of a train at his station? A: To ensure complete arrival of the train by seeing tail Q: Which buttons are used to cancel line clear in UFSBI? board or tail lamp or by issuing T/1410. A: Cancel co-operation button and Cancel button. Q: In case of failure of BPAC before resetting it what is the duty Q: Fog Signal Post is provided at ------ meters away from first of station master? stop signal of a block station. A: To notice error code. If we start resetting error codes A: 270 meters. cannot be observed. Q: Which officer put his signature in appendix D of SWR? Q: Accidents are classified in how many heads? A: Sr. DOM. A: 5 heads. Q: Which officers put their signature in SWR? Q: How many categories of accidents are there in I R? A: DOM and DSTE. A: 16 categories. Q: What is the full form of UFSBI? Q: During accident what is the first duty of SM? A: Universal Fail Safe Block Interface. A: To note down the time of first information. Q: Before asking line clear through UFSBI what should be Q: Can dead loco be attached with super fast train? verified by SM? A: Yes. Q: What is the normal speed of DMT? Q: Name an approved substitute of signal overlap. A: 40 Kmph. A: Sand Hump. Q: What is the speed of B class ODC? Q: Maximum how many persons can travel on a heavy duty A: 40/16 kmph.(straight route/curvature) motor trolley? A: 16 persons Q: What is the speed of C class ODC? A: 25/8kmph/dead slow.(Straight route/curvature/while Q: Minimum how many persons should travel on a motor passing a fixed structure) trolley on S/L? A: 6 persons. Q: Whose approval is needed to run C class ODC? A: CRS. Q: Can we take off last stop signal for shunting? A: No. Q: During foggy weather what is the maximum speed of train in automatic block system if the automatic signal is double Q: What is the separation distance between two motor trolleys? yellow? A: 100 meters A: 30 Kmph. Q: What is the separation distance between train and trolley? Q: During foggy weather what is the maximum speed of train A: 150 meters. in absolute block system and in automatic block system if automatic signal remains in green position? Q: how to receive a train on a non signalled line? A: 60 kmph. A: Bypiloting with T/409. Q: What is ruling gradient? Q: What register is kept by trackman to take signature of A: Steepest gradient of the section is called ruling driver at stop indication board? gradient. A: Restriction Book. Q: Can shunt signal be placed below advance starter? Q: What does oooooo(6) beats indicate? A: Yes. A: Danger or obstruction. Q: Why T/431 form is used? Q: During failure under which code can Relay room key be A: Train Examination advice memo. drawn? A: Code 5 Q: Is repeating signal a stop signal? A: No. A: Particulars of fog signal man and their assurance. Q: Goods warning board is provided at what distance from first stop signal or gate stop signal? Q: What is written on OP/T124 part-II? A: 1400 meters. A: Particulars of receipt of detonators and stock of detonators. Q: Goods warning board is provided at what distance from first stop signal or gate stop signal in Rajdhani route? Q: What is written on OPT-124 Part-III? A: 1500 meters. A: Particulars of fog, fog signal man on duty, number of detonators used, date, and time. Q: What is the use of track circuit? A: It indicates presence of vehicle in the portion of track. Q: What is written on OP/T124 Part-IV? A: Particulars of testing of detonators. Q: For reception of train in non signalled line, how far line should be kept clear? Q: What is the distance between speed indicator and speed A: Up to outermost trailing point of the non signalled line. restriction zone? A: 30 meters. Q: What is the authority to proceed on double line for motor trolley? Q: What is the distance between stop indicator and speed A: T/1525. restriction zone? A: 30 meters. Q: What is the form number of Conditional line clear ticket for down line used in case of total failure of communication on Q: What is the speed of goods train in case of bad riding in the single line? section? A: T/H602. A: 16 kmph. Q: What is the maximum number of person to board on a Q: For how long records of caution orders are preserved in motor trolley on S/L & D/L? station? A: 10 A: One year. Q: Before giving line clear to a train SM will exchange private Q: For how long records of accident cases of serious nature is number with the gate man of non-interlock gate with what preserved in station? information? A: 5 years.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages51 Page
-
File Size-