Notice for 84Th PCC Meeting

Notice for 84Th PCC Meeting

Tel No.:033-24235199, 24235005 FAX No.:033-24221802, 24221358 Web: www.erpc.gov.in NO. ERPC/PROTECTION/2019/ DATE: 09.10.2019 FAX MESSAGE NO. - 743 To, As per list enclosed. Sub: Notice for 84th Protection Coordination sub-Committee (PCC) meeting of ERPC Notice is hereby given that 84th PCC meeting of ERPC will be held on 23rd October 2019 (Wednesday) at 11:00 hrs at ERPC Conference Room, Kolkata. The tentative agenda items for discussion will be as follows: 1) Confirmation of the minutes of 83rd Protection sub-Committee Meeting of ERPC 2) Analysis of following grid disturbances of September, 2019: Load Sl GD/ Affected Gen loss Date Time Summary loss No GI System (MW) (MW) 400 kV Motihari – Gorakhpur D/C was not in service. Motihari was radially connected to Barh via a 400 kV D/C line. At 4:36 Hrs., 400kV Barh-Motihari D/C tripped leading to 04-09- a load loss of 240 MW in Bettia (traction), 1 GD-I 04:36 BSPTCL 240 0 2019 Ramnagar, Raxaul, Motihari. Nepal load at Parwanipur got interrupted due to this disturbance. Fault location is 10 km from Motihari. Tower collapse of 26/0 location reported. At 16:59 hrs., SPS operated for HVDC Talcher- Kolar pole II because of interruption of 24V Pole control system 1 and delayed 04-09- changeover from system 1 to system 2 2 GI-II 16:59 ISTS 0 210 2019 control system. 130 MW generation reduction occurred at JITPL (500 to 370 MW) and 80 MW generation reduction occurred at GMR (480 MW to 400 MW). 220 kV Dumka – Govindpur - II was idle charged from Dumka end. Due to improper 07-09- protection setting, Dumka end failed to clear 3 GD-I 17:32 JUSNL 180 0 2019 the fault in idle charged portion of 220 kV Dumka – Govindpur – II. To clear the fault, 400/220 kV ICTs at Maithon, 220 kV Maithon – Kalyaneshwari D/C, 220 kV Maithon – Dhanbad D/C, 220 kV Maithon – Dumka D/C also tripped resulting total power failure at Dumka and 220 kV side of Maithon S/S. Rangpo is having double main bus scheme. All elements except 400 kV Binaguri - Rangpo - II and 400 kV Dikchu-Rangpo S/C 13-09- were connected to bus I. At 21:42 hrs, bus I 4 GD-I 21:42 ISTS 30 830 2019 became dead resulting tripping of 400 kV Teesta V - Rangpo D/C, 400/220 kV ICTs at Rangpo. Units at Chujachen, Tashiding and Jorethang also got tripped. At 13:01 hrs., all poles associated with HVDC BNC - Agra (POLE 1&2) and ALIPURDWAR- AGRA(POLE 3&4) tripped due to line fault . Prior to tripping, flow from HVDC pole at Alipurduar was 1400 MW and from BNC pole 16-09- 550 5 GI-II 13:01 ISTS was 500 MW. To reduce the loading of AC 0 2019 (Manually) lines after tripping of HVDC poles, generation reduction was done manually at Teesta III, Teesta V, Tashiding, Jorethang and Dikchu by 200 MW, 200 MW, 50 MW, 50 MW and 50 MW respectively. 400 kV HEL – Subhasgram – I was under shutdown on that day. HEL was radially connected through 400 kV HEL – 21-09- Subhasgram – II to Subhasgram S/S. At 12:43 6 GD-I 12:43 WBSETCL 0 571 2019 Hrs. 400 KV HEL - Subhasgram II tripped due to R –Y – N fault. Consequently, both running units (2*300 MW) at HEL tripped due to loss of evacuation path. At 17:13 hrs., 220 KV Ranchi-Hatia D/C and 24-09- 7 GD-I 17:13 JUSNL 220 KV Patratu-Hatia D/C tripped leading to 169 0 2019 total power failure in 220 K Hatia s/s. Due to blockage of HVDC Talcher-Kolar pole 2, power order of HVDC Talcher Kolar 29-09- reduced from 1500 MW to 1000 MW. 8 GI-II 21:02 ISTS 0 40 2019 Generation reduction occurred at JITPL by 40 MW (from 380 MW to 340 MW). There was no unit in service at GMR. 3) Single line tripping incidences of September-2019 is enclosed at Annexure-I. You are requested to kindly furnish the detail report along with all records (SLD, SOE, DR, Relay and schematic diagram of auxiliary supply, wherever applicable) related to above trippings for meaningful analysis during the meeting. You are also requested to upload the details in on-line tripping incident reporting system implemented in Protection Database Management System www.erpc-protectiondb.in. Your participation in the meeting is highly solicited. Please confirm your participation in the meeting along with name and designation of the participants. Yours faithfully, Sd- (J. Ganeswara Rao) Executive Engineer LIST OF ADDRESSES: Chief Engineer, Trans (O&M) Electrical Superintending Engineer (CRITL) Bihar State Power Transmission Limited, Vidyut Bihar State Power Transmission Limited, Vidyut Bhawan, Bailey Road, Patna-800021 Bhawan, Bailey Road, Patna-800021 Chief Engineer (SLDC) Chief Engineer (CTC) Damodar Valley Corporation, GOMD-I Premises, Damodar Valley Corporation, P.O. Maithon Dam, P.O.- Danesh Seikh Lane, Howrah- 711109 Dist. Dhanbad, Jharkhand-828207 Chief Engineer, (CRITL) Electrical Superintending Engineer (CLD) Jharkhand Urja Sancharan Nigam Limited Jharkhand Urja Sancharan Nigam Limited, Kusai Colony, Doranda, Ranchi-834002 Kusai Colony, Doranda, Ranchi-834002 Chief General Manager (O&M), Sr. General Manager (PPA), Technical Wing, OPTCL, Janpath, Bhubaneswar, OHPCL, Orissa State Police Housing & Welfare Odisha – 751 022. FAX: 0674-2542932 Corpn. Bldg. Vanivihar Chowk, [email protected] Janpath,Bhubaneswar-752022 Chief Load Dispatcher, SLDC Chief Engineer (Testing), WBSETCL OPTCL, P.O. Mancheswar Rly. Colony Central Testing Laboratory, Abhikshan, Salt Lake, Bhubaneswar-751017 Kolkata-700091 ( Fax no. 2367-3578/1235 ) Chief Engineer (CLD) Addl. Chief Engineer (ALDC) WBSETCL, P.O. Danesh Sheikh Lane, West Bengal Electricity Distribution Company Ltd Andul Road, Howrah-711109 Vidyut Bhavan, 7th Floor, Bidhannagar, Sector-I Salt Lake City, Kolkata-700091(Fax-033-2334-5862) Dy. Chief Engineer (Testing)/ Sr. Manager (Testing) General Manager (O&M) CESC Ltd.,4, Sasi Sekhar Bose Road, KhSTPS, NTPC Ltd., P.O. Deepti Nagar, Kolkata-700025 Dist. Bhagalpur, Bihar-813203 General Manager(O&M) Dy. General Manager ( Engineering), FSTPS, NTPC Ltd., P.O. Nabarun, WBPDCL,OS Dept. Corporate Office, 3/C,L.A Block, Dist. Murshidabad, West Bengal-742236 Salt Lake-III, Kolkata-700098 ( Fax-033-23350516) General Manager (O&M) General Manager (OS), ERHQ-II, NTPC Ltd., 3rd flr. Barh STPS, NTPC Ltd., P.O. NTPC Barh, OLIC Building, Plot no. N 17/2, Nayapalli, Unit-8 Dist. Patna, Bihar-803213 Bhubaneswar- 751012 (Fax No. 0674-2540919) General Manager(O&M), TSTPS, NTPC Ltd., General Manager (O&M), POWERGRID, Odisha P.O.Kaniha, Dist. Angul, Orissa-759117 Projects, Sahid Nagar, Bhubaneswar – 751 007 General Manager(OS), ERHQ-I, NTPC Ltd., Manager (Electrical), Adhunik Power & Natural Loknayak Jaiprakash Bhawan, (2nd Floor), Resources Ltd. “Lansdowne Towers, Kolkata-700020 Dak Bunglow Chawk, Patna-800001 ( Fax No. 033-2289 0285) Executive Director (O&M) Electrical Superintending Engineer, TTPS, NHPC Ltd., NHPC Office Complex, Sector-33, Tenughat Vidyut Nigam Ltd., Lalpania, Dist. Bokaro, Faridabad, Haryana-121003 ( Fax-01292272413 ) Jharkhand-829149 Dy. General Manager (Electrical) General Manager (OS), ER-I IB Thermal Power Station, OPGCL Power Grid Corporation of India Ltd., Banhapalli, Dist. Jharsuguda-768234,Orissa Alankar Place, Boring Road, Patna-800001 Chief Engineer (Trans.) Sr. Manager (CTMC) Power Deptt., Govt. of Sikkim, Gangtok-731010 Durgapur Projects Limited, Durgapur-713201 Executive Director, Head Construction, ENCIL, Siliguri-7340051 ERLDC, POSOCO, Tollygunge,Kolkata-700033 General Manager (OS), ER-II Shri A.K.Nayak/Shri Sumit S Ghosh Power Grid Corporation of India Ltd., Maithon Power Limited, Maithon Office, MA 5 J-I-15, Block-EP, Sector-V,Salt Lake,Kolkata-91 Gogna, Dist. Dhanbad, Jhankand State, PIN-828207 General Manager (P&O), PTC Ltd., Vice President, Vedanta Ltd. Kanchanjunga Bldg.,18, Barakhamba Road, 1st Floor, Module C/2, Fortune Tower, C S Pur, New Delhi-110001 Bhubaneswar- 751023 Managing Director, Bhutan Power Corporation Managing Director, Druk Green Power Corprn. Post Box no. 580, Thimpu, Bhutan. P.O. Box-1351, Thimpu, Bhutan. General Manager, Darbhanga(Bihar), Darbhanga Shri Brajesh Kumar Pande, Plant Head, JITPL. Motihari Transmission Company Limited (DMTCL) (FAX:011-26139256-65) Shri D. P. Bhagava, Chief Consultant (O&M), Teesta Director (GM Division), Central Electricity Authority Urja Limited, New Delhi (FAX:011-46529744) Sewa Bhawan, R. K. Puram, New Delhi-110066 Director (NPC), CEA, NRPC Building, Katwaria President, Dans Energy Pvt. Ltd, 5th Floor, DLF Sarai, New Delhi- 110016 Building No. 8, Tower-C, Gurgaon - 722OO2 Director, Shiga Energy Pw. Ltd., 5th Floor, DLF DGM (E&I), HALDIA ENERGY LIMITED, BARIK Building No. 8, Tower-C, Gurgaon - 722OO2 BHAWAN, KOKATA-700072, FAX: 033-22360955 CC: ASSISTANT SECRETARY, ERPC ANNEXURE-I From Tripping Name Tripping Date & Time Element Type Element Name From Station FIR(F) DR(F) EL(F) To Owner To Station FIR(T) DR(T) EL(T) Owner 400KV KISHANGANJ(PG)-TEESTA-III-SC 30-09-2019 08:51:00 Transmission Line 400 KV-KISHANGANJ 400KV-400 KV-Teesta III-1 POWERGRID 400 KV-KISHANGANJ 400KV No No No TUL 400 KV-Teesta III Yes Yes Yes 220 KV-Maithon(400/220kV)-220 KV- 220KV MAITHON-DUMKA-I 29-09-2019 22:22:00 Transmission Line POWERGRID 220 KV-Maithon(400/220kV) No No No JUSNL 220 KV-Dumka_MADANPUR(220/132kV) Yes Yes Yes Dumka_MADANPUR(220/132kV)-1 220KV BEGUSARAI-NEW PURNEA-I 29-09-2019 20:17:00 Transmission Line 220 KV-BEGUSARAI 220KV-220 KV-NEW PURNEA 400KV-1 BSPTCL 220 KV-BEGUSARAI 220KV No No No POWERGRID 220 KV-NEW PURNEA 400KV No No No 400KV ROURKELA-JHARSUGUDA-I 29-09-2019 17:07:00 Transmission Line 400 KV-ROURKELA 400KV-400 KV-JHARSUGUDA 765 KV-1 POWERGRID 400 KV-ROURKELA 400KV No No No POWERGRID 400 KV-JHARSUGUDA 765 KV No No No 400KV

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    7 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us