Highway Works Programme 2011/12

Highway Works Programme 2011/12

To: Maidstone Joint Transportation Board By: KCC Highways, Transportation & Waste Date: 16th October 2019 Subject: Highway Forward Works Programme – 2019/20 onwards Classification: Information Only Summary: This report updates Members on the identified schemes approved for construction 1. Introduction This report provides an update and summarises schemes that have been programmed for delivery in 2019/20. Kent County Council has agreed a substantial increase in the budget for planned highway works over the next three years, and as a result we are still in the process of identifying and designing schemes for inclusion in our full Year One to Two (2019/20 and 2020/21) and Year Three to Five (2021/22 to 2023/24) programmes. Because of this, we have decided to publish an interim programme, and to publish the full programmes later this year. For some assets this interim programme covers approximately the first six months of 2019/20, whilst for others it includes most of the works planned for the whole year. This programme is subject to regular review and may change for several reasons including budget allocation, contract rate changes, and to reflect KCC’s changing priorities. The programme and extent of individual sites within the programme may also be revised following engineering assessment during the design phase. Road, Footway & Cycleway Renewal and Preservation Schemes – see Appendix A Drainage Repairs & Improvements – see Appendix B Street Lighting – see Appendix C Transportation and Safety Schemes – see Appendix D Casualty Reduction Measures Externally funded schemes Local Growth Fund Developer Funded Works – see Appendix E Bridge Works – see Appendix F Traffic Systems – see Appendix G Combined Member Fund – see Appendix H Conclusion 1. This report is for Members’ information. Contact Officers: The following contact officers can be contacted on 03000 418181 Kirstie Williams Highway Manager Mid Kent Susan Laporte Maidstone District Manager Alan Casson Strategic Asset Manager Earl Bourner Drainage & Structures Asset Manager Sue Kinsella Street Light Asset Manager Toby Butler Traffic & Network Solutions Asset Manager Jamie Hare Development Agreements Manager Jamie Watson Schemes Programme Manager Appendix A – Footway and Carriageway Improvement Schemes The delivery of these schemes is weather dependent; should it prove not possible to carry out these works on the planned dates, new dates will be arranged, and the residents will be informed by a letter drop to their homes. Machine Resurfacing – Contact Officer Mr Byron Lovell Road Name Parish Extent of Works Current Status From the B2163 Upper Street Programmed 21st A274 Maidstone Road Langley to Warmlake Road November 2019 Watt Tyler Way and Wyke nd A20 King Street Maidstone Programmed 2 Manor Road December 2019 From Lancet Lane to Programmed A229 Linton Road Loose Rosemount Close 30th November 2019 From bridge deck over th Forstal Road Aylesford Programmed 8 motorway to Beddow Way November 2019 From Loose Road (through Programmed A229 Sheals Crescent Maidstone Hayle Road, College Road, 14th November Mill Street) to Bishops Way 2019 Mill Street and A249 Mote Programmed A229 Palace Avenue Maidstone Road 27th November 2019 A249 Mote Road to Old Tovil Programmed A229 Upper Stone Street Maidstone Road 11th December 2019 Maidstone Gyratory to To be A20/A26 Rocky Hill Maidstone Terrace Road programmed 2020 Footway Improvement - Contact Officer Mr Neil Tree Road Name Parish Extent and Description of Current Status Works From the junction with Square Hill Road to Willow Way Completed Mote Road Maidstone (Northern side) (Footway Reconstruction) Entire length Winifred Road Bearsted Completed (Footway Reconstruction). Entire length Royston Road Bearsted Completed (Footway Reconstruction). Entire length Rosemary Road Bearsted Completed (Footway Reconstruction). Entire length Designed and to Trenton Close Allington (Footway Reconstruction). be programmed. Entire length Beverley Road Barming Completed (Footway Protection) Entire length Egremont Road Bearsted Completed (Footway Protection) Entire length Roseholme Maidstone Completed (Footway Protection) Entire length Wesley Close Barming Completed (Footway Protection) Entire length Broomshaw Road Barming Completed (Footway Protection) Surface Treatments – Contact Officer Mr Jonathan Dean Micro Surfacing Road Name Parish Extent and Description of Current Status Works Glebe Lane Maidstone Tonbridge Road to Farleigh Completed (Barming) Lane Maidstone Gatland Lane (Barming) Farleigh Lane to Fant Lane Completed Lenham Faversham Road Whole Road Completed Lenham West Street Faversham Road to Flint Lane (West Street) Lenham Completed Marden Marden Road Battle Lane to "Mountain Farmhouse" Completed Marden Maidstone Road "Hartridge" to 150m north of j/w Milebush Lane (Kiln Farm) Completed Headcorn Road Chain Gate Road to Station Platts Heath / Approach, Lenham Completed Lenham Headcorn Road Headcorn Road to Sandway Sandway Road Completed Sandway Road Headcorn Road to "Little Sandway Biggen" Completed Gallants Lane East Farleigh Lower Road to Heath Road Completed River Beult bridge (Clapper Hunton Road Marden Green) to "Reed Court Completed Cottages" Boughton Old Tree Lane/Cliff Hill Monchelsea From The Quarries to Combe To Be Bank House - Programmed Sandway Road Platts Heath Around "Sandway Triangle" Completed Kenward Road Yalding Hunt Street to Yalding Hill Completed Bow Road Wateringbury Corner after bridge to Hunt Completed Street Smith’s Hill Yalding To Be Confirmed Completed Surface Treatments – Contact Officer Mr Jonathan Dean Surface Dressing Road Name Parish Extent and Description of Current Status Works Near j/w Old Mill Road to j/w A20 Ashford Road Hollingbourne Roundwell Programmed for August 2019 A20 Ashford Road Old Ashford Road to Hollingbourne Northdown Close Programmed for August 2019 Programmed for Charlton Lane From Chartway Street to East Sutton Church Lane August 2019 Appendix B - Drainage Drainage Repairs & Improvements - Contact Officer Earl Bourner Road Name Parish Description of Works Current Status Work is in progress. Green Repair the culvert and edge of Chart Sutton Hopefully completed by Lane road/ verge/ ditch. 1/9/19. Tufa Walderslade Relocation of soakaway Completed Close Cleansing works Smith’s complete further West Farleigh Investigation works Hill investigation required at Shingle Barn Lane. It has been identified that the issue is due to The Surface water system the Southern Water Maidstone Broadway surcharging system. Southern Water will now be responsible for this site Dray Further investigation works Corner Headcorn Awaiting start date required Road Dunn Bredhurst Repair broken pipe Awaiting start date Street Fisher Reports of broken pipes and Maidstone Awaiting start date Street repairs to be carried out Lower East Farleigh Repair broken pipes Awaiting start date Road West Hunton Repair broken pipes Awaiting start date Street Originally programmed To carry out a drainage CCTV for 18/8/19, abandoned The survey and cleanse to locate Boxley due to TM issues on the Street outfall of system and check for day. New programme defects. date is Sunday 8/9/19. Sheals To carry out drainage CCTV Maidstone Awaiting start date Crescent investigation. Appendix C – Street Lighting Column replacement testing of KCC owned streetlights has identified the following as requiring replacement. A status of complete identifies that the column replacement has been carried out. Programme dates are identified for those still requiring replacement. Street Lighting Column Replacement – Contact Officer Sue Kinsella Road Name Column Parish Description of Works Status Lit Sign Replacement KWAI502 Completion end Warwick Place Maidstone September 2019 Lit Sign replacement KWAI501 Completion end Warwick Place Maidstone September 2019 Replacement of Street Light KBFE010 Completion by Brishing Lane Maidstone December 2019 Replacement of Street Light High Street KHDO053 Staplehurst Completed Lit Sign replacement Milton Street KMCW503 Maidstone Completed Lit Sign replacement Whitmore KWCR501 Completion by Maidstone Street December 2019 Replacement of Street Light KSFA029 Completion by Station Road Staplehurst December 2019 Replacement of Street Light Castle Dene KCAO002 Maidstone Completed Replacement of Street Light Impton Lane KIAC001 Boxley Completed Replacement of Street Light Maynards KMBY002 Marden Completed Replacement of Street Light KEAQ003 Completion by Egerton Road Ringlestone December 2019 Replacement of Street Light KKAM009 Completion by King Street Maidstone December 2019 Replacement of Street Light Woodlands KXEF107 Boxley Completed Replacement of Street Light KHFD002 Completion by March Howard Drive Allington 2020 Replacement of Street Light KHFD016 Completion by March Howard Drive Allington 2020 Replacement of Street Light KTCI016 Completion by March Trevor Drive Allington 2020 Replacement of Street Light ERNEST KEBA004 Completion by March ALLINGTON DRIVE 2020 Replacement of Street Light LEONARD KLBG004 Completion by March ALLINGTON CLOSE 2020 Replacement of Street Light BRACKEN KBIC008 Completion by March BOXLEY HILL 2020 Replacement of Street Light OLD KOAI001 Completion by March CHATHAM BOXLEY 2020 ROAD Replacement of Street Light BELLGROVE KBIF001 Completion by March BOXLEY COURT 2020 Replacement of Street Light BRACKEN KBIC008 Completion by March BOXLEY HILL 2020 Replacement of Street Light WILDFELL KWFE016 Completion by March BOXLEY CLOSE 2020 Replacement of Street Light VICTORIA KVAJ003 Completion by March BRIDGE STREET

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    25 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us