Tata Steel Plant Kalinganagar

Tata Steel Plant Kalinganagar

Home Kalinganagar The Project Community Care Events Media FAQs Contact www.tatasteelindia.com Project Profile Project Progress Tat a St eel Parivar R and R Overview Yo u are in: Home > The Project > Project Profile Social Rehabilitation Economic Rehabilitation Success Stories R and R Init iat ives In partnership with the Government of Odisha, Tata Kalinganagar – Project Highlights Education Steel is committed to set up a 6 million tonne per annum integrated steel plant at Kalinganagar Healthcare Industrial Complex at Duburi, in the Jajpur district. MOU for the steel project was signed The Steel Works will be established in two modules between the Government of Odisha and Infrastructure of 3 million tonnes of steel each and when Tata Steel on November 17, 2004. Women Empowerment completed, will have a capacity of 6 million tonnes As per the MoU, Odisha Government per annum. Sports agreed to provide 3,471.808 acres of land, earlier acquired through the S p e c ia l attention has been given to all the Industrial Development Corporation of find us on: requirements of the families in rehabilitation Orissa. colonies and resettlement camps that are fully equipped with all amenities. With Kalinganagar MOU was also signed with the Nippon emerging as the steel hub of Odisha, Tata Steel will Steel Corporation on August 28, 2005 for help boost the pace of industrialisation and socio- offering technical assistance for the economic development, not only in the State but in project. the Country as well. When operational, the Kalinganagar Works is projected to generate revenues In 2012, Maniapatala village was added where 39 in the range of Rs 2,200 crores per families are to be displaced, taking the total annum and also provide direct and number of families to be displaced to 1234. As of December 15, 2012, 993 families (out of 1234 indirect employment to about 20,000 families) have relocated voluntarily in support of the people. project. Details of the Plant Site The proposed plant site happens to be a part of six revenue villages - Gobaraghati, Chandia, Gadapur, Nuagaon, Khurunti and Baragadia - of the Sukinda Tehesil in Jajpur District. The specific details are given in the table below: Area (In Acres) Sl. Revenue Village No Private Land Government Land Total Land 1 Gobaraghati 731.600 61.940 793.540 2 Chandia 1083.810 263.345 1347.155 3 Nuagaon 90.70 15.82 106.52 4 Gadapur 388.49 135.749 524.239 5 Khurunti 128.006 0.540 128.546 6 Baragadia 236.78 123.63 360.41 Total 2659.386 >601.024 3260.410 Optimised for 1024 x 768 pixels screen resolution | © Copyright Tata Steel 2014 | Sitemap.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us