Study on Orient / East-Med TEN-T Core Network Corridor

Study on Orient / East-Med TEN-T Core Network Corridor

Study on Orient / East-Med TEN-T Core Network Corridor 2nd Phase Final Report December 2017 Transport Study on Orient / East-Med TEN-T Core Network Corridor, 2nd Phase, Draft Final Report Table of content Table of content ................................................................................................ 1 Figures ............................................................................................................. 3 Tables .............................................................................................................. 4 Abstract ........................................................................................................... 5 Declaration by the Consultant ............................................................................. 5 Disclaimer ........................................................................................................ 5 Information on current version ............................................................................ 6 Abbreviations .................................................................................................... 7 1 Information on the Study .............................................................................. 8 1.1 Background and objective ...................................................................... 8 1.2 Consortium information .......................................................................... 9 1.3 Outline ................................................................................................10 2 Summary of the Study.................................................................................11 2.1 Characteristics of the Corridor ................................................................11 2.2 Traffic demand and forecast ..................................................................11 2.3 Compliance with the technical infrastructure requirements ........................13 2.4 Accomplished actions on the OEM Corridor ..............................................15 2.5 Current and Future Corridor Infrastructure Compliance – challenges and need for action ......................................................................................................16 2.6 Administrative and operational barriers ...................................................19 2.7 Urban Nodes Analysis ...........................................................................21 2.8 Innovation and environmental impact .....................................................22 2.9 Potential market uptake of IWT / Modal Shift ...........................................23 2.10 Overall investment analysis ...................................................................24 2.11 Estimation of socio-economic impact of the Corridor .................................26 3 Conclusions and key aspects from the analysis ...............................................27 3.1 Compliance with the technical infrastructure parameters of the TEN-T guidelines - 2016 ...........................................................................................28 3.2 Accomplished projects ..........................................................................32 3.3 Demand for the Corridor .......................................................................33 3.4 The identified projects to be realised by 2030 ..........................................38 3.5 Future challenges on the OEM Corridor ...................................................40 3.6 Administrative and operational barriers ...................................................57 3.7 Urban nodes ........................................................................................60 3.8 Wider elements of the Work Plan ............................................................62 3.9 Infrastructure investments and funding ...................................................68 3.10 Impact to jobs and growth ....................................................................73 3.11 Pilot initiative - the Rail Border Two Hour Goal .........................................74 4 Inland Water Transport: Potential market uptake ............................................75 4.1 Objective.............................................................................................75 4.2 Competitive analysis .............................................................................75 4.3 Potential intermodal transport vs. direct trucking .....................................77 4.4 Regulatory restrictions ..........................................................................81 5 Rail: Reducing barriers in Corridor-wide rail operation .....................................82 5.1 Cooperation with Rail Freight Corridor .....................................................82 5.2 Pilot initiative – the Rail Border Two Hour Goal.........................................85 5.3 Proposed actions for achieving the Two-hour goal ....................................87 6 Clustering of Corridor projects ......................................................................92 6.1 Key objective criteria to cluster investments ............................................92 6.2 Assessment of Project relevance ............................................................92 6.3 Assessment of Project maturity ..............................................................95 6.4 Calculation ..........................................................................................96 6.5 Results ................................................................................................97 7 Jobs & Growth Analysis for Corridor projects ................................................ 102 7.1 Multiplier-based growth and jobs analysis .............................................. 102 7.2 Direct Jobs Analysis ............................................................................ 104 December 2017 2 Study on Orient / East-Med TEN-T Core Network Corridor, 2nd Phase, Draft Final Report 8 Summary of actions already accomplished ................................................... 108 8.1 Progress of Corridor Development ........................................................ 108 8.2 Accomplished rail projects ................................................................... 109 8.3 Accomplished IWW projects ................................................................. 110 8.4 Accomplished maritime projects ........................................................... 111 8.5 Accomplished road projects ................................................................. 111 8.6 Accomplished RRT projects .................................................................. 112 8.7 Accomplished airport projects .............................................................. 113 8.8 Selection of accomplished projects with highest contribution to KPI .......... 113 9 Acknowledgement ..................................................................................... 115 10 Appendix .............................................................................................. 115 Figures Figure 1: OEM Corridor Alignment ..................................................................11 Figure 2: OEM project list in terms of modal categories and total cost in million € .25 Figure 3: OEM project list and number of projects per MS ..................................25 Figure 4: Number of projects per Member State and overlaps ............................39 Figure 5: OEM rail compliance map for 2030 ...................................................42 Figure 6: Compliance Map 2030 of the OEM IWW network .................................48 Figure 7: Compliance Map 2030 of the OEM IWW network with respect to reduced draught standard ............................................................................49 Figure 8: Compliance Map 2030 of the OEM motorway / express road network ....54 Figure 9: Road – Compliance Map of IRU registered commercial parking areas .....60 Figure 10: Forecasted freight modal share for 2030 scenarios ..............................64 Figure 11: Freight (bln tonnes-km) per mode of transport ...................................65 Figure 12: Passengers (bln pkm) per mode of transport ......................................65 Figure 13: Emissions from freight and passenger transport (mln tonnes CO2 equivalent) ....................................................................................66 Figure 14: Climate Change Main Risks per OEM country ......................................67 Figure 15: Analysis of the funding and financing sources .....................................68 Figure 15: Financial Sustainability of OEM projects .............................................69 Figure 17: Overview scope market potential continental container market (NUTS-3 regions) .........................................................................................76 Figure 18: Handling costs in IWT ......................................................................78 Figure 19: Project relevance indicator per cluster ...............................................94 Figure 20: Project mapping calculation ..............................................................97 Figure 21: Number of OEM CNC projects per overall score ...................................97 Figure 22: Number of OEM CNC projects: score per transport mode .....................98 Figure 23: Number of OEM CNC projects: overall maturity scoring........................98 Figure 24: Number of OEM CNC projects:

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    115 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us