APPENDIX I (See Paragraph – 6) FORM 1 (I) Basic Information SN Item Details 1

APPENDIX I (See Paragraph – 6) FORM 1 (I) Basic Information SN Item Details 1

Form-1 District Court Building at Pipliahana , Dist Indore (MP) APPENDIX I (See paragraph – 6) FORM 1 (I) Basic Information SN Item Details 1. Name of the project District Court Building , by Govt Of MP thorough Project Implementation Unit of Public Works Department of Govt of MP 2. Sr. No. in the Schedule 8 “A” 3. Proposed capacity/ area/ length/ Total Land Area = 11.161 Ha tonnage to be handles / command area / Total Built Up Area = 144492 sq mt lease area /number of wells to be drilled. 4. New/Expansion/Modernization New 5. Existing Capacity/ Area Total Area = 27.57 acres 6 Category of project A or B Category „B‟ 7. Does it attract the general condition? If The proposed Project does not located in Yes please specify whole or part within 10 km radius from the boundary of a. Protected areas notified under the wildlife (protection) act 1972 b. Critically polluted area as identified by CPCB c. Eco sensitive Area as notified under section 3 of the EP act 1986 d. Interstate boundaries and international boundaries 8 Does it attract the specific condition? If Not applicable Yes please specify 9. Location Village- Pipliahana , Indore (MP) Plot/survey/khsara no 526/1/1, 526/1/2 Village Pipliahana Block/Mandal Indore Tehsil Indore District Indore State M.P. 10. Nearest railway station/airport along Indore – 3 km with distance in km Air Port - 15 km 11 Nearest Town Indore City Indore District Headquarter Indore 12 Village Panchayat/Zila Indore Municipal Corporation, Indore (MP) 1 Form-1 District Court Building at Pipliahana , Dist Indore (MP) Parisad/Municipal Corporation/local Body 13 Name of the Applicant Shri Anand Rane ( Divisional Project Engineer) Project Implementation Unit- PWD Indore (MP) 14 Registered address Divisional Project Engineer Office of Divisional Project Engineer PIU-PED, Old Palasia , Indore (MP) 15 Address for correspondence Divisional Project Engineer Office of Divisional Project Engineer PIU-PED, Old Palasia , Indore (MP) Name Shri Anand Rane Designation (Owner/partner/CEO) Divisional Project Engineer Address Office of Divisional Project Engineer PIU-PED, Old Palasia , Indore (MP) E Mail [email protected] [email protected] Telephone No Mob . 98262-40750 Off – 0731-4900846 16 Details of alternative site examined, if No, as the land has been sanctioned for any, Location of these sites should be construction of Court and ownership has shown on a Top sheet retained by the Honorable High Court, Indore (MP) . The proposed land use is in accordance with Master Plan of Indore and MP Bhumi Vikas Adhiniyam 2012 17 Interlinked Project No 18 Whether separate application of Not Applicable interlinked project has been submitted 19 If Yes date of submission - 20 If no reason Project is not interlinked with other project 21 Whether the proposal involves Not required as none of comes in 10 km approval/clearance under, if yes details of radius the same a. The forest conservation act 1980 b. The wildlife protection act 1972 c. The CRZ notification 1991 22 Whether there is any Govt. order/Policy Permission from T&CP has already obtained. relevant/relating to the site The Land Use of the proposed site is residential/commercial as per Indore Development Plan and M.P. Bhumi Vikas Adhiniyam 2012. 23 Forest land involved No 2 Form-1 District Court Building at Pipliahana , Dist Indore (MP) 24 Whether there is any litigation pending Yes ( Pl refer details as enclosed Annexure-A) against the project and/or land in which the project is propose to be set up a. Name of court b. Case No c. Order/direction of the court, if any and its relevance with the proposed project (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. Information/Checklist Yes/ Details thereof (with approximate quantities No. confirmation No /rates, wherever possible) with source of information data 1.1 Permanent or temporary change Yes The land use of the proposed area is kept for in land use, land cover or domestic and commercial activities.. Presently topography including increase in the proposed land is plain and in possession intensity of land use (with respect of Honorable District Court. The land is to local land use plan) adjacent to the water body named as Pipliahana Pond. The building is proposed 30 mt away from the pond as per provision of T &CP. 1.2 Clearance of existing land, No As the land is flat terrain without any vegetation and buildings? undulation and of any buildings/forest growth. Hence the clearances for buildings and vegetation are not required. The proposed site is marked for the commercial development by the IMC/IDA 1.3 Creation of new land uses? Yes With construction of Building of district court may give rise to the development of other activities in the vicinity. 1.4 Pre-construction investigations e.g. Yes Soil Testing has been carried out. No bore well bore houses, soil testing? is proposed . The soil testing report is enclosed as Annexure-3 1.5 Construction works? Yes Construction works will be initiated after obtaining Environment clearance from SEIAA/SEAC 1.6 Demolition works? No No Site Clearing is required 1.7 Temporary sites used for No No housing for labours is proposed. All the construction works or housing of construction material will be kept within the construction workers? project site. Local labours will be hired for the 3 Form-1 District Court Building at Pipliahana , Dist Indore (MP) construction activity through contractor. Proper sanitation facility will be provided at the site. 1.8 Above ground buildings, structures Yes Most of the structures will be above the or earthworks including linear ground except basement. However structures, cut and fill or excavations will be involved for foundations. excavations 1.9 Underground works including or No No underground works is involved as no or tunneling? tunneling activities is proposed except basement construction activity. 1.10 Reclamation works? No No Reclamation works is required. 1.11 Dredging? No No Dredging activities will be involved. 1.12 Offshore structures? No No offshore structures is envisage for proposed activity 1.13 Production and manufacturing No District Court Building with associated processes? facilities 1.14 Facilities for storage of goods or Yes Separate material handling storage will be materials? made where cement and sand will be stored under cover in bales and tarpaulin respectively. Brick and steel will be kept open within the periphery of the project site. 1.15 Facilities for treatment or disposal Yes Sewage Treatment Plant is proposed of of solid waste or liquid effluents? capacity 350 KLD with SAFF technology. Mainly domestic and landscape waste will be generated as solid waste from the commercial complex during course of operation. It is estimated that at about 921 kg per day of waste will be generated from the Court complex during the operation, which includes waste generated by the floating and working population, canteen etc. Twin bin waste collection system will be used within the court complex – green bins for bio-degradable wastes and blue bins for non-biodegradable wastes shall be provided. Segregation of wastes. Sale of recyclable waste like news papers, cartoon, bottles, canes etc to recycling industry. Transportation of non-biodegradable/non recyclable wastes to the municipal waste 4 Form-1 District Court Building at Pipliahana , Dist Indore (MP) landfill site. Personnel engaged in the collection, segregation will be trained and demonstrated to make them proactive and efficient in the solid waste management practices. 1.16 Facilities for long term housing of No No residential colony is proposed operational workers? 1.17 New road, rail or sea traffic during No No applicable, only approach road will be construction or operation? constructed 1.18 New road, rail, air waterborne or No No new transport facilities are proposed. other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No No closure or diversion of transporting transport routes or infrastructure facilities is proposed. leading to changes in traffic movements? 1.20 New or diverted transmission No No new or diversion of transmission line as lines or pipelines? well as for pipeline is proposed. 1.21 Impoundment, damming, No No culverting, realignment are envisaged. culverting, realignment or other There will not be any changes to the changes to the hydrology of hydrology of watercourses or aquifers. watercourses or aquifers? 1.22 Stream crossings? No No stream crossing is involved. 1.23 Abstraction or transfers of water No Required water will be met through IMC form ground or surface waters? water supply 1.24 Changes in water bodies or the No No changes in water bodies, drainage and land surface affecting drainage or land surface are anticipated, as the site is more run-off? or less flat without undulations. The Pipliahana pond is adjacent to the proposed site. The toe wall is proposed all along in the direction of said pond. Reverse elevation is proposed to avoid any discharge towards the pond. Further 30 mt green area/belt is proposed in between nearest building and bank of pond, which will act as buffer zone. 1.25 Transport of personnel or materials Yes A few vehicles will be provided for transport for construction, operation or of personnel during construction & operation decommissioning? of the court complex. Construction materials will be transported in contractor‟s vehicles. The raw materials will be transported in 5 Form-1 District Court Building at Pipliahana , Dist Indore (MP) trucks by road estimated 05-10 truck per day. The existing road known as ring road and Ring road to Bicholi Mardana road which are adjacent to the site in South and East direction is capable of handling the additional vehicular traffic due to the proposed activities.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    14 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us