APPENDIX I (See paragraph – 6) FORM 1 (I) Basic Information SN Item Details 1. Name of the project District Court Building , by Govt Of MP thorough Project Implementation Unit of Public Works Department of Govt of MP 2. Sr. No. in the Schedule 8 “A” 3. Proposed capacity/ area/ length/ Total Land Area = 11.161 Ha tonnage to be handles / command area / Total Built Up Area = 144492 sq mt lease area /number of wells to be drilled. 4. New/Expansion/Modernization New 5. Existing Capacity/ Area Total Area = 27.57 acres 6 Category of project A or B Category „B‟ 7. Does it attract the general condition? If The proposed Project does not located in Yes please specify whole or part within 10 km radius from the boundary of

a. Protected areas notified under the wildlife (protection) act 1972 b. Critically polluted area as identified by CPCB c. Eco sensitive Area as notified under section 3 of the EP act 1986 d. Interstate boundaries and international boundaries 8 Does it attract the specific condition? If Not applicable Yes please specify 9. Location Village- Pipliahana , Indore (MP) Plot/survey/khsara no 526/1/1, 526/1/2

Village Pipliahana Block/Mandal Indore Tehsil M.P. 10. Nearest railway station/airport along Indore – 3 km with distance in km Air Port - 15 km 11 Nearest Town Indore City Indore District Headquarter Indore 12 Village Panchayat/Zila Indore Municipal Corporation, Indore (MP)

1 Form-1 District Court Building at Pipliahana , Dist Indore (MP)

Parisad/Municipal Corporation/local Body 13 Name of the Applicant Shri Anand Rane ( Divisional Project Engineer) Project Implementation Unit- PWD Indore (MP) 14 Registered address Divisional Project Engineer Office of Divisional Project Engineer PIU-PED, Old , Indore (MP) 15 Address for correspondence Divisional Project Engineer Office of Divisional Project Engineer PIU-PED, Old Palasia , Indore (MP)

Name Shri Anand Rane Designation (Owner/partner/CEO) Divisional Project Engineer Address Office of Divisional Project Engineer PIU-PED, Old Palasia , Indore (MP) E Mail [email protected] [email protected] Telephone No Mob . 98262-40750 Off – 0731-4900846 16 Details of alternative site examined, if No, as the land has been sanctioned for any, Location of these sites should be construction of Court and ownership has shown on a Top sheet retained by the Honorable High Court, Indore (MP) . The proposed land use is in accordance with Master Plan of Indore and MP Bhumi Vikas Adhiniyam 2012 17 Interlinked Project No 18 Whether separate application of Not Applicable interlinked project has been submitted 19 If Yes date of submission - 20 If no reason Project is not interlinked with other project 21 Whether the proposal involves Not required as none of comes in 10 km approval/clearance under, if yes details of radius the same a. The forest conservation act 1980 b. The wildlife protection act 1972 c. The CRZ notification 1991 22 Whether there is any Govt. order/Policy Permission from T&CP has already obtained. relevant/relating to the site The Land Use of the proposed site is residential/commercial as per Indore Development Plan and M.P. Bhumi Vikas Adhiniyam 2012. 23 Forest land involved No

2 Form-1 District Court Building at Pipliahana , Dist Indore (MP)

24 Whether there is any litigation pending Yes ( Pl refer details as enclosed Annexure-A) against the project and/or land in which the project is propose to be set up a. Name of court b. Case No c. Order/direction of the court, if any and its relevance with the proposed project

(II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

S. Information/Checklist Yes/ Details thereof (with approximate quantities No. confirmation No /rates, wherever possible) with source of information data 1.1 Permanent or temporary change Yes The land use of the proposed area is kept for in land use, land cover or domestic and commercial activities.. Presently topography including increase in the proposed land is plain and in possession intensity of land use (with respect of Honorable District Court. The land is to local land use plan) adjacent to the water body named as Pipliahana Pond. The building is proposed 30 mt away from the pond as per provision of T &CP. 1.2 Clearance of existing land, No As the land is flat terrain without any vegetation and buildings? undulation and of any buildings/forest growth. Hence the clearances for buildings and vegetation are not required. The proposed site is marked for the commercial development by the IMC/IDA 1.3 Creation of new land uses? Yes With construction of Building of district court may give rise to the development of other activities in the vicinity. 1.4 Pre-construction investigations e.g. Yes Soil Testing has been carried out. No bore well bore houses, soil testing? is proposed . The soil testing report is enclosed as Annexure-3 1.5 Construction works? Yes Construction works will be initiated after obtaining Environment clearance from SEIAA/SEAC 1.6 Demolition works? No No Site Clearing is required 1.7 Temporary sites used for No No housing for labours is proposed. All the construction works or housing of construction material will be kept within the construction workers? project site. Local labours will be hired for the

3 Form-1 District Court Building at Pipliahana , Dist Indore (MP)

construction activity through contractor. Proper sanitation facility will be provided at the site. 1.8 Above ground buildings, structures Yes Most of the structures will be above the or earthworks including linear ground except basement. However structures, cut and fill or excavations will be involved for foundations. excavations 1.9 Underground works including or No No underground works is involved as no or tunneling? tunneling activities is proposed except basement construction activity. 1.10 Reclamation works? No No Reclamation works is required. 1.11 Dredging? No No Dredging activities will be involved. 1.12 Offshore structures? No No offshore structures is envisage for proposed activity 1.13 Production and manufacturing No District Court Building with associated processes? facilities 1.14 Facilities for storage of goods or Yes Separate material handling storage will be materials? made where cement and sand will be stored under cover in bales and tarpaulin respectively. Brick and steel will be kept open within the periphery of the project site. 1.15 Facilities for treatment or disposal Yes Plant is proposed of of solid waste or liquid effluents? capacity 350 KLD with SAFF technology. Mainly domestic and landscape waste will be generated as solid waste from the commercial complex during course of operation. It is estimated that at about 921 kg per day of waste will be generated from the Court complex during the operation, which includes waste generated by the floating and working population, canteen etc.

 Twin bin waste collection system will be used within the court complex – green bins for bio-degradable wastes and blue bins for non-biodegradable wastes shall be provided.  Segregation of wastes.  Sale of recyclable waste like news papers, cartoon, bottles, canes etc to recycling industry.  Transportation of non-biodegradable/non recyclable wastes to the municipal waste

4 Form-1 District Court Building at Pipliahana , Dist Indore (MP)

landfill site.  Personnel engaged in the collection, segregation will be trained and demonstrated to make them proactive and efficient in the solid waste management practices. 1.16 Facilities for long term housing of No No residential colony is proposed operational workers? 1.17 New road, rail or sea traffic during No No applicable, only approach road will be construction or operation? constructed 1.18 New road, rail, air waterborne or No No new transport facilities are proposed. other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No No closure or diversion of transporting transport routes or infrastructure facilities is proposed. leading to changes in traffic movements? 1.20 New or diverted transmission No No new or diversion of transmission line as lines or pipelines? well as for pipeline is proposed. 1.21 Impoundment, damming, No No culverting, realignment are envisaged. culverting, realignment or other There will not be any changes to the changes to the hydrology of hydrology of watercourses or aquifers. watercourses or aquifers? 1.22 Stream crossings? No No stream crossing is involved. 1.23 Abstraction or transfers of water No Required water will be met through IMC form ground or surface waters? water supply 1.24 Changes in water bodies or the No No changes in water bodies, drainage and land surface affecting drainage or land surface are anticipated, as the site is more run-off? or less flat without undulations. The Pipliahana pond is adjacent to the proposed site. The toe wall is proposed all along in the direction of said pond. Reverse elevation is proposed to avoid any discharge towards the pond. Further 30 mt green area/belt is proposed in between nearest building and bank of pond, which will act as buffer zone. 1.25 Transport of personnel or materials Yes A few vehicles will be provided for transport for construction, operation or of personnel during construction & operation decommissioning? of the court complex. Construction materials will be transported in contractor‟s vehicles. The raw materials will be transported in

5 Form-1 District Court Building at Pipliahana , Dist Indore (MP)

trucks by road estimated 05-10 truck per day. The existing road known as ring road and Ring road to Bicholi Mardana road which are adjacent to the site in South and East direction is capable of handling the additional vehicular traffic due to the proposed activities. During operation of facility, parking arrangement will be done for 3124 ECS. 1.26 Long-term dismantling or No No such works are envisaged. decommissioning or restoration works? 1.27 Ongoing activity during No No such works are envisaged decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes During construction local people will be temporarily or permanently? involved. During operation of facility local people shall be employed for administration/support services purposes. 1.29 Introduction of alien species? No 1.30 Loss of native species or genetic No diversity? 1.31 Any other actions? No

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S.No. Information/checklist Yes/ Details thereof (with approximate confirmation No quantities /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or Yes Total 27.57 acres of land has been provided agricultural land (ha) for construction of court building and owned by the Govt of MP . Land use of the area is kept for domestic and commercial activities as per local land use plan. 2.2 Water (expected source & Yes i) Construction Phase : 40-50 KLD per day competing users) unit: KLD (ii) Operation Phase : During the operational phase, water will be primarily sourced through Public Water Supply as well as from reuse of treated effluent. It is estimated that --- 365 cum per day water is required per day, out of which 292 cum of treated effluent will be used through recycling.

6 Form-1 District Court Building at Pipliahana , Dist Indore (MP)

2.3 Minerals (MT) No 2.4 Construction material – stone, Yes Aggregate - 34545 Cum aggregates, sand / soil (expected Steel - 3985 Mt source – MT) Cement- 21250 Mt Bricks - 27700 CUM Sand- 29790 CUM 2.5 Forests and timber (source – MT) No 2.6 Energy including electricity and Yes It is estimated that total 637 KW of power is fuels (source, competing users) required while facility will be in operation Unit: fuel (MT), energy (MW) and provision will be made for 100 percent back up supply. A stand-by power supply system through DG sets shall be provided, which can be quickly/automatically started in case of power failure. To meet the requirement of back-up power, 2DG sets of 400- KVA is required 2.7 Any other natural resources (use No appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S.No. Information/Checklist Yes/ Details thereof (with approximate confirmation No quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, No No usage of Hazardous Chemicals/ Material which are hazardous (as per during Construction/ Operational Activities. MSIHC rules) to human health HSD will be stored for the DG sets but below or the environment (flora, the threshold limit as specified in MSIHC fauna, and water supplies) rules. 3.2 Changes in occurrence of No Proper sanitation and waste management disease or affect disease vectors practices shall be adopted so that unhygienic (e.g. insect or water borne condition shall not be developed in the diseases) proposed project. 3.3 Affect the welfare of people e.g. Yes Not Applicable as the proposed project will by changing living conditions? create more employment opportunities during the construction and operational stage and thereby a substantial improvement in the socio-economic status. 3.4 Vulnerable groups of people No who could be affected by the

7 Form-1 District Court Building at Pipliahana , Dist Indore (MP)

project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No

4. Production of solid wastes during construction or operation or decommissioning (MT/month) S.No. Information/Checklist Yes/ Details thereof (with approximate confirmation No quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine No The dug soil during excavation will be used wastes for filling of low-lying areas and making reverse elevation towards said water body 4.2 Municipal waste (domestic and Yes Mainly domestic and landscape waste will be or commercial wastes) generated as solid waste from the court complex during course of operation. It is estimated that at about 921 kg per day of waste will be generated from the facility during the operation, which includes waste generated by the floating and working population, canteen etc. Adequate number of collection bins, separates for bio degradable and non biodegradable waste shall provided as per the MSW ( management & Handling) Rule 2008. Waste form such bin shall collected separately on daily basis. All the collection bins shall be properly maintained on regular basis. Arrangement will be made with IMC for the collection and disposal of waste. 4.3 Hazardous wastes (as per Yes Spent oil generation from the DG set is Hazardous Waste envisaged. The DG sets will be kept as Management Rules) standby arrangement and utilized in case of power failure only 4.4 Other industrial process wastes No Not applicable 4.5 Surplus product No Not applicable 4.6 Sewage sludge or other sludge Yes Sludge at about 30-35 kg per day will be from effluent treatment generated and will be disposed off at landfill site of Indore 4.7 Construction or demolition Yes Construction wastes will be disposed off as wastes per guidelines. 4.8 Redundant machinery or No No redundant machinery will be kept in the equipment premises.

8 Form-1 District Court Building at Pipliahana , Dist Indore (MP)

4.9 Contaminated soils or other No Not envisaged materials 4.10 Agricultural wastes No Not envisaged 4.11 Other solid wastes Yes Landscape waste will be generated which will be disposed off with other solid waste at Municipal landfill site.

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S.No. Information/Checklist Yes/ Details thereof (with approximate confirmation No quantities/rates, wherever possible) with source of information data 5.1 Emissions from combustion of Yes The operation of proposed project does not fossil fuels from stationary or envisage any major air pollutants generating mobile sources sources except DG sets and vehicular movements. DG sets will be operated only in case of power failure and 250 liters per hours of diesel will be consumed on full load. 5.2 Emissions from production No Not Applicable processes 5.3 Emissions from materials Yes During the handling of construction materials handling including storage or , Fugitive emission is expected and it will be transport restricted to construction phase 5.4 Emissions from construction Yes Some dust emissions will be generated during activities including plant and construction. Dust curtains will be provided equipment all round the work area to prevent the dust emissions. Trapulin cover will be provided over raw material storage area. Water spraying will be done to prevent the dust emission due to vehicular movement. 5.5 Dust or odours from handling of Yes No manual handling of sewage is proposed, materials including construction all the sewage will be will be treated in materials, sewage and waste sewage treatment plant. Some dust emissions will be generated during construction. Dust curtains will be provided all round the work area to prevent the dust emissions. Trapulin cover will be provided over raw material storage area. 5.6 Emissions from incineration of No Not envisaged waste 5.7 Emissions from burning of waste No Not envisaged in open air (e.g. slash materials,

9 Form-1 District Court Building at Pipliahana , Dist Indore (MP)

construction debris) 5.8 Emissions from any other No Not envisaged sources

6.0 Generation of Noise and Vibration, and Emissions of Light and Heat: S.No. Information/Checklist Yes/ Details thereof (with approximate confirmation No quantities/rates, wherever possible) with source of information data with source of information data 6.1 From operation of equipment Yes The sources of noise generation during e.g. engines, ventilation plant, operational phase will be DG sets etc.. Noise crushers enclosures will be provided to DG Sets. On site traffic will have minimal noise generation due to honking as the roads provided within the proposed project site are sufficient in width. Noise pollution from the traffic over the road is assumed to similar in nature during operation of facility, and it will be within the limit within the court complex. Ambient noise levels will be in accordance with MOEF notification dated 14-02-2000 i.e. noise levels will be < 75 dB (A) during daytime and < 70 dB (A) during night time. 6.2 From industrial or similar No Not envisaged processes 6.3 From construction or yes Construction equipment like air compressor, demolition loader, concrete mixture truck, concrete pumper, vibrator, dump truck, generator, hammering, jackhammer, pile driver etc. will cause some noise. All the machineries deployed for the construction work will be highest standard and it is estimated that these equipments will emit the noise level in between 81-90 dB(A). Ear plugs will be provided to construction workers who work near the noise generating equipment. 6.4 From blasting or piling No No 6.5 From construction or Yes Vehicles used by construction staff are operational traffic minimal. The noise levels will be in accordance with MOEF notification dated 14- 02-2000 during the operation of office

10 Form-1 District Court Building at Pipliahana , Dist Indore (MP)

complex. 6.6 From lighting or cooling systems Yes 85-90 dB(A) noise level is expected from cooling system. Noise shield and barriers shall be adopted to attenuated the noise level. 6.7 From any other sources No

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

S.No. Information/Checklist Yes/ Details thereof (with approximate confirmation No quantities/rates, wherever possible) with source of information data 7.1 From handling, storage, use or No Waste oil will be stored in covered HDPE spillage of hazardous materials drums and will be given to approved vendors. Hence there will not be any spillage, which will affect the environment. 7.2 From discharge of sewage or No Entire volume of treated effluent will be other effluents to water or the recycled for flushing, horticulture purposes. land (expected mode and place of No contamination is expected from the discharge) handling of effluent. Excess treated effluent ,if any, will be disposed off at drainage network of IMC. 7.3 By deposition of pollutants No Deposition of pollutants in air is not emitted to air into the land or into envisaged as no major air pollution source is water envisaged for the proposed commercial complex. 7.4 From any other sources No Not envisaged 7.5 Is there a risk of long term build No Not envisaged up of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

S.No. Information/Checklist Yes/ Details thereof (with approximate confirmation No quantities/rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires No No hazardous substance will be stored etc from storage, handling, use within the premises of commercial complex. or production of hazardous HSD will also be purchased within the substances threshold quantity as and when required.

11 Form-1 District Court Building at Pipliahana , Dist Indore (MP)

Further fire hydrant network and all safety measure shall be taken care off to prevent any fire hazard. 8.2 From any other causes No Not envisaged 8.3 Could the project be affected by No Not envisaged natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)?

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

S. Information/Checklist Yes/ Details thereof (with approximate No. confirmation No quantities/rates, wherever possible) with source of information data 9.1 Lead to development of Yes During operation of facility and court supporting. activities, direct and indirect employment utilities, ancillary development opportunity will be increased in the area. or development Further supply of commodity material will stimulated by the project which also be increased. Proposed Area may be could have impact on the further developed in terms of environment e.g.: communication, infrastructure, and  Supporting infrastructure upgradaed transportation. (roads, power supply, waste or waste water treatment, etc.)  housing development  extractive industries  supply industries  other 9.2 Lead to after-use of the site, No Not applicable which could havean impact on the environment 9.3 Set a precedent for later No Not envisaged developments 9.4 Have cumulative effects due to No Not envisaged proximity to other existing or planned projects with similar effects

(III) Environmental Sensitivity

12 Form-1 District Court Building at Pipliahana , Dist Indore (MP)

S. Areas Name/ Aerial distance (within 15 No. Identity km.) proposed project location boundary 1 Areas protected under international No Not Applicable conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for No The Pipliahana pond is ecological reasons - Wetlands, watercourses adjacent to the proposed site. or other water bodies, coastal zone, The toe wall is proposed all biospheres, mountains, forests along in the direction of said pond. Reverse elevation is proposed to avoid any discharge towards the pond. Further 30 mt green area/belt is proposed in between nearest building and bank of pond, which will act as buffer zone. 3 Areas used by protected, important or No Not Applicable sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground No Not Applicable waters 5 State, National boundaries No Not Applicable 6 Routes or facilities used by the public for No Not Applicable access to recreation or other tourist, pilgrim areas 7 Defence installations No Not Applicable 8 Densely populated or built-up area Yes The area is moderately populated with residential colony, colleges and business organizations. 9 Areas occupied by sensitive man-made land Yes There are number of uses (hospitals, schools, places of worship, nurshing home, hospitals, community facilities) schools, colleges, community facilities within the 15 km radius of the proposed site. 10 Areas containing important, high quality or No Not Applicable scarce resources (ground water resources, surface resources,

13 Form-1 District Court Building at Pipliahana , Dist Indore (MP)

forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or No Not Applicable environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which No Not Applicable could cause the project to present environmental problems earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

I hereby given undertaking that the data and information given in the application and enclosures are true to best of my knowledge and behalf and I am aware that if any part of data and information submitted is found to be false or misleading at any stage the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost

Date Signature of applicant with name & Full address (Project Proponent/ Authorized Signatory) Place

14