The Urban Flood Control Project in the Mountainous Area in Hunan Province Loaned by the Asian Development Bank

The Urban Flood Control Project in the Mountainous Area in Hunan Province Loaned by the Asian Development Bank

The Urban Flood Control Project in the Mountainous Area in Hunan Province Loaned by the Asian Development Bank The External Resettlement Monitoring & Assessment Report (Lengshuijiang City, Lianyuan City, Shuangfeng County, Shaoyang City, Shaodong County, Longhui County, Jiangyong County, Xintian County, Jianghua County, Qiyang County, Ningyuan County, Chenzhou City, Zhuzhou City, Liling City, Zhuzhou County and Youxian County) No.1, 2008 Total No. 1 Hunan Water & Electricity Consulting Corporation (HWECC) September, 2008 Approved by: Wang Hengyang Reviewed by: Long Xiachu Prepared by: Long Xiachu, Wei Riwen 2 Contents 1. Introduction 2. Project Outline 2.1 Project Outline 2.2 Resettlement Outline 3. Establishment and Operation of Resettlement Organizations 3.1 Organization Arrangement 3.2 Organization Operation 4. Project Implementation Progress 4.1 Jiangyong County 4.2 Chenzhou City 5. Resettlement Implementation Progress 5.1 Resettlement Implementation Schedule 5.2 Resettlement Policy and Compensation Standards 5.3 Progress of Land Acquisition 5.4 Progress of Resettlement Arrangement 5.5 Removal Progress of Enterprises and Institutions 5.6 Progress of Resettlement Area Construction 5.7 Arrival and Payment of the Resettlement Fund 6. Psychology and Complaint of the Resettled People 6.1 Complaint Channel 6.2 Complaint Procedures 7. Public Participation, Consultation and Information Publicizing 7.1 Jiangyong County 7.2 Chenzhou City 8. Existed Problems and Suggestions 3 1. Introduction The Urban Flood Control Project in the Mountainous Area in Hunan Province (referred to as the Project in short) loaned by the Asian Development Bank (referred to as the Asian Bank in short) has started officially. According to the requirements of the Asian Bank, the Project has introduced the resettlement monitoring and assessment mechanism to monitor and assess the process of land acquisition and resettlement, as well as the quality and effect of the resettlement for the purpose of overall understanding of the resettlement and scientific decision-making by the Owner and the Asian Bank based on the monitoring assessment reports provided by the resettlement monitoring and resettlement institute. According to the Minutes of meeting held on Apr. 29, 2007 by the Project Office and the fax issued on Aug. 16, 2007 by the Asian Bank, Hunan Water & Electricity Consulting Corporation (referred to as HWECC) would be responsible for the external monitoring and assessment of 16 non-core sub-projects including Lengshuijiang City, Lianyuan City, Shuangfeng County, Shaoyang City, Shaodong County, Longhui County, Jiangyong County, Xintian County, Jianghua County, Qiyang County, Ningyuan County, Chenzhou City, Zhuzhou City, Liling City, Zhuzhou County and Youxian County. After signing of the resettlement monitoring and assessment contract, HWECC has contacted all project units actively and has signed resettlement monitoring and assessment contracts with 3 sub-projects including Jiangyong City, Chenzhou City and Liling City. Established in January of 2008, the Resettlement and Assessment Department for the Urban Flood Control Project in the Mountainous Area in Hunan Province 4 loaned by the Asian Development Bank (referred to the Resettlement and Assessment Department) in HWECC started its preparatory work, worked out the Resettlement Monitoring and Assessment Work Outline for the Urban Flood Control Project in the Mountainous Area in Hunan Province loaned by the Asian Development Bank (the draft) as well as the sub-project resettlement monitoring and assessment work outline and has begun the first stage monitoring and assessment. Since the Project has just started soon, the finished resettlement was not big and the progress was behind the resettlement plan. Therefore, the monitoring and assessment at this stage is focused on followings: (1). Establishment and operation of resettlement organizations. (2). Used resettlement policy and compensation standards . (3). Progress of land acquisition and Demolition. (4). Raising and payment of resettlement funds. 2. Project Outline 2.1 Project Outline The Urban Flood Control Project in the Mountainous Area in Hunan Province covers 35 county-level cities in the mountainous area in Hunan Province which suffer severe floods, including 8 prefecture-level cities (the Zhuzhou City, Xiangtan City, Hengyang City, Yongzhou City, Loudi City, Chenzhou City, Shaoyang City, Huaihua City and the Jishou City which is the capital city of the autonomous prefecture, as well as 27 counties (cities) under 12 Cities (prefecture). The contents of the 16 non-core sub-projects undertaken by the HWECC include flood control projects, waterlogging projects, river dredging and bridges, etc., and the total investment is 1862,1127 million RMB Yuan, while the resettlement costs account for 452,9304 million RMB Yuan. 5 After implementation, the flood control and waterlogging standards of prefecture-level cities will be increased to 1-in-50 years and 1-in-20 years respectively, while the standards of county-level cities will be increased to 1-in-20 years and 1-in-10 years respectively, which means significant social and economic benefits. The basic information of the 16 sub-projects is shown in Table 2.1. Table 2.1 Basic information of 16 non-core sub-projects Planned Investment Resettlement No Project name Project Contents Schedule X103RMB X103RMB Total (1).8.27 km dike. (2).11 culvers & construction gates. (3).2 drainage stations. period: 36 Lengshuijiang 1 (4).Flood control commanding months (33 97750 23346.6 City system and necessary months for management facilities. main project). (1).Including 4 protection zones (Lantian, Guangming Street, Shimashan, Chengbei), 4 dikes with total length of 15.895 km Total Lianyuan (2.233 km embankment and construction 2 98758.2 16544.4 City 13.662 km flood control wall). period :48 (2).10 culverts and gates. (3). months Flood control commanding system and necessary management facilities. (1).9.8 km dike. (2).12 culverts Total and gates. (3).2 drainage stations. Shuangfeng construction 3 (4).A 1.605km flood discharge 105460 15197.8 County period:48 channel, 2 flood discharge months. culverts with length of 1.13 km. 6 (1).Including 6 protection zones (Baitian, Shentan, Xiwaiwan, Shaoshuidonglu, Shaoshuixi, Total Shaoyang Maoping, Hongqihe), 7 dikes with construction 4 206530 33041.8 City total length of 12.174 km. (2).9 period: 48 culverts and gates. (3).1 months communication gate. (4).7 drainage stations (4800KW). (1).Including 3 protection zones (Liangshitang, Xinglong and Meiling), 7 dikes with total length of 11.686km (11.148km embankment, 0.538km earth & rock embankment), 3.704 km Total slope protection, 3.069km bank construction protection. (2).7 culverts and gates period: 34 Shaodong 5 and 2 communication gates. months (23 127900 45625.6 County (3).Demolition of Caojiaba Dam, months for 10 abandoned pumping houses, 1 main bridge pier, 4 waste heaps. (4). project) 1.53km Majiawan flood discharge channel. (5).4 drainage stations (1290KW). (6). Flood control commanding system and necessary management facilities. (1).8.219km dike. (2).5 culverts and gates, 2 communication gates. (3).3 drainage stations with 6 Total pumps and capacity of 784KW. Longhui construction 6 (4).1.8km river dredging and 3 76430 15423.1 County period: 48 sand dunes in the riverbed months (452,000m3). (5). Flood control commanding system and necessary management facilities. Total (1). 4 dikes with total length of construction 6.67km (4.48 km embankment, period: 24 Jiangyong 2.19km flood control wall). (2). 4 7 months (20 44940 6900.8 County culverts and gates. (3). months for Consolidation and improvement main of 4 flood discharge channels. project) 7 (1).Enlargement of existing stone dike (6.514km). (2). 9.789 Total embankment. (3). 2.033km flood Xintian construction 8 control wall. (4). 0.61km bank 39824.5 11869 County period: 36 protection. (5). 2 culverts and months gates. (6). 2 pumping stations (4 units and 644 KW). (1).3.6 km dike (2.85 km embankment, 0.75km masonry Total wall). (2). 3.6 km grass slope construction protection and 2.85 km masonry period: 34 Jianghua slope protection. (3).3 electric 9 months (28 52130 10748.7 County drainage stations (660KW). (4).3 months for culverts and gates. (5).3.6 km main surface hardening of flood control project) dike. (6). clearing up obstacles in the river. (1). 13.63 km dike (9.28km for Total the Xiangjiang River and 4.355km construction for the Qishui River). (2).10 period: 48 Qiyang 10 culverts and gates and 3 drainage months (44 132830 32378.4 City stations (880KW). (3).13.635km months for surface hardening of flood control main dike. project) (1).8.06 km flood control dike. Total Ningyuan (2).4 culverts and gates. (3). construction 11 56530 9858.1 County Improvement of 4 flood discharge period: 34 channels. months (1).5.83 km dike (including 2.14 km natural slope cutting). Total (2).11.19km flood control wall. Chenzhou construction 12 (3).15 culverts and gates. (4). 15 177850 44889.2 City period: 24 flood discharge channels with months total length of 2960m. (5). River dredging. 8 (1).33.057 km dike consolidation (13.638km in Qingxiangtian Zone, 11.645km in Heming Zone and 7.774 km in Qujian Zone). (2).6.723 km anti-leakage treatment within the dike (3km in Qingxiangtian Zone, 1 km in Heming Zone and 2.723 km in Qujian Zone). (3). Renovation of 7 culverts and gates (4 in Qingxiangtian Zone, 1 in Heming Zone and 2 in Qujian Zone). 13 Total (4).6.678km slope protection construction (4.878 km in Qingxiangtian Zone, period: 48 1.8 km in Heming Zone). (5).5.47 months (47 km dike grouting (3.5 km in Zhuzhou months for Qingxiangtian Zone, 0.97 km in 377900 116692.1 City main Heming Zone and 1 km in Qujian project) Zone). (6). There are 30 drainage stations with 53 pumps (6218KW), of which 10 drainage stations with 28 pumps (5150KW) are available, and 39 new pumps (12863KW) will be installed.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    57 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us