World Bank Document

World Bank Document

Years from April 2015 to July 2019 Public Disclosure Authorized nt Date Date) Quote Category Starting year Techn/Financial Package IFB Nr. Prior/Post review Bid Opening date TOR, RF, Bidding TOR, RF, Procurement Method Contract signing date TS, TOR, RF, Bidding TS, TOR, Doc/Invitation to Quote Doc/Invitation to Quote Shortlist, TS, TOR, RF, Shortlist, TS, TOR, Bidding Doc/Invitation to PMU Finalize Shortlist, TS, Delivery/ completion Latest Aprooved date for Shortlist, Contract amount ('000US$) PMU Submit to IDA for NO: SPN Date (Tender Invitation Description Supplier/Contractor/Consulta Vehicles for MSTs,Secretariat,Value 1 Chain Secretariat, PIU 2-Apr- 26-Jun- 29-Jun- Global Motors G NCB Prior 2015 2-Apr-15 22-Apr-15 30-Apr-15 4-Jun-15 84.87 Contra CARMAC2-PG-15-01/1 15 15 15 CJSC 14-Jul- 12- 98.74 Vekar LLC Contra CARMAC2-PG-15-01/2 15 Sep-15 Special Vehicles for VCS (Vet Service 13-Nov- 2 G NCB*** Post 2015 1-Oct-15 13-Oct-15 13-Oct-15 Centers, 1 vehicle) 15 Special Vehicles for VCS (Vet Service 23-Dec- 17- 8-Mar- Centers, 1 vehicle) Contra CARMAC2- G NCB Post 2015 2-Dec-15 3-Dec-15 1-Feb-16 14.84 Megna LLC Public Disclosure Authorized 15 Feb-16 16 PG-16-09 Servers for SSFS 15-Jul- 9-Nov- 8-Mar- Doxx Computers 2A G NCB Post 2015 27-Jul-15 4-Aug-15 6-Aug-15 7-Sep-15 124.16 Contra CARMAC2-PG-15-06 15 15 16 LLC Special Vehicles for SSFS CVFS&P (State Service for Food Safety and 18- 17-Oct- 28-Jul-16 28-Jul-16 28-Jul-16 9-Aug-16 91.13 Galoper LLC 3 Centre Veterinary, Food G SH Post 2016 Aug-16 16 Safety&Phytosanitary) Contra CARMAC2-PG-16-12 Special Vehicles for VCS (Vet Service 4 G NCB Post 2017 Centers, 4 vehicles) IT Equipment for Secretariat,Value 5 G SH Post 2016 Chain Secretariat, PIU IT Equipment for MSTs Contra 13- 14-May- 22-May- 24-Jul- 22- 5A G SH Prior 2015 12-May-15 9-Jun-15 11.56 Dolphin LLC CARMAC2-PG-15-02 May-15 15 15 15 Sep-15 IT Equipment for PIU Contra 10-May- 17-May- 23- 23-Jul- Doxx Computers Public Disclosure Authorized 5B G SH Post 2016 6.03 CARMAC2-PG-16-10 16 16 May-16 16 LLC Information Dissemination 6 G SH Post 2015 TBD (leaflets,sign-boards, etc) 9-Jun- 9-Aug- 1-Jun-15 1-Jun-15 8-Jun-15 0.33 Uniprint LLC 6A Contra CARMAC2-PG-15-04 (Booklet) G SH Post 2015 15 15 Public Disclosure Authorized Contra CARMAC2-PG-16-11 10-Jun- 13-Jun- 23-Jun- 6B G SH Post 2016 1-Jun-16 3-Jun-16 0.53 Uniprint LLC (Register) 16 16 16 7 Office furniture for PIU and MSTs G SH Post 2015 TBD Contra CARMAC2-PG-15-03 29-May- 11-Jun- 11-Jul- 7A G SH Post 2015 29-May-15 8-Jun-15 3.56 PE H.Avetisyan (Furniture) for MTS 15 15 15 Contra CARMAC2-PG-15-08 10-Nov- 17-Nov- 25- 24-Jan- G SH Post 2015 29-May-15 4.05 PE H.Avetisyan (Furniture) for APIU 15 15 Nov-15 16 Commun. Vets equipment and 8 G SH Post 2016 consumables 9 Equipment and furnitures for VSCs G SH Post 2016 17-Aug- 24-Aug- 1-Sep- 30- 7-Aug-17 17-Aug-17 9A Safeguard system for Mets Parni VSC G SH Post 2017 17 17 17 Sep-17 1C software with scanning equipment 18-Aug- 25-Aug- 1-Sep- 30- 9B G SH Post 2017 7-Aug-17 18-Aug-17 for Mets Parni VSC 17 17 17 Sep-17 10 Medicines and supplies for VSCs G SH Post 2016 11- 13, Analitical and Lab Equipment for Local G NCB Post 2016 16- Food Inspectors, SSFS, CV&P, SVC 17 Furniture for SSFS One stop shop 14-Feb- 15- 25- 25-Jan-17 3-Feb-17 8-Feb-17 7.18 Gaudi LLC 11A Contra CARMAC2-PG-17-16 (SSFS G SH Post 2017 17 Feb-16 Feb-16 Furniture) IT Equipment for SSFS One stop shop 15-Feb- 15- 6-Mar- 25-Jan-17 3-Feb-17 9-Feb-17 3.51 SRS-Zvezda LLC 11B Contra CARMAC2-PG-17-17 (SSFS G SH Post 2017 17 Feb-16 16 Equipm) Field equipment for SVC (Scientific 30- 30-Jun- Concern 20-Jul-15 20-Oct-15 28-Oct-15 9-Nov-15 70.85 14 Center for Vegetables) Contra G SH Post 2015 Nov-15 17 Energomash CJSC CARMAC2-PG-15-07 (GH Equip) Field equipment for SVC (Scientific 26-Aug- 4-Oct- 3-Dec- 26-Aug-16 26-Aug-16 5-Sep-16 27.33 SpecmashLLC 14A Center for Vegetables) Contra G SH Post 2016 16 16 16 CARMAC2-PG-16-13 (GH Equip) Greenhouse equipment for SCV 23-Sep- 7-Oct- 6-Dec- HGH Company 23-Sep-16 23-Sep-16 3-Oct-16 33.10 15 Contra CARMAC2-PG-16-14 (GH G SH Post 2016 16 16 16 LLC Equip) Office equipment (IT and furniture) for 19-Feb- 5-Apr- 4-Jun- 18 G SH Post 2016 10-Jan-17 30-Jan-17 4-Feb-17 SCV 17 17 17 Analytical Equipment for Agrochemical 15-Feb- 25-Feb- 1-Mar- 1-May- Concern 10-Feb-17 10-Feb-17 86.28 19 Center Contra CARMAC2-PG-17-18 G SH Post 2017 17 17 17 17 Energomash CJSC (Lab Equip) Analytical Equipment for Agrochemical 16-Aug- 30- 29- 20 G SH Post 2018 7-Jul-18 27-Jul-18 1-Aug-18 Center 18 Sep-18 Nov-18 Additional IT equipment (MIS) 11-Sep- 1-Oct- 1-Dec- Doxx Computers 20-Jul-15 1-Sep-15 1-Sep-15 9.24 21 Contra CARMAC2-PG-15-05 (MIS G SH Post 2015 15 15 15 LLC Equipm) 677.3 12-Feb- 14-Mar- 13- 9-Nov- 9-Dec-16 7-Feb-17 22 VSC Civil works CW SH Post 2016 17 17 May-17 17 SSFS One stop shop renovation CW 14-Feb- 15- 11- Master- 25-Jan-17 3-Feb-17 8-Feb-17 30.07 22A Contra CARMAC2-CW-17-6/02 (SSFS CW SH Post 2017 17 Feb-16 Mar-16 Constracshen LLC CW) SSFS One stop shop renovation supervision 16-Feb- 15- 11- 22B CS CQ Post 2017 25-Jan-17 9-Feb-17 0.54 Micto HEK LLC Contra CARMAC2-CW-17-6/02 (SSFS 16 Feb-16 Mar-16 CW) Contra CARMAC2-CW-16-5/01-04 9-Aug- 6-Sep- QVE nakhagits 22C 1-Aug-16 1-Aug-16 4.83 (Parni VSC Design&Author) 16 16 LLC Contra CARMAC2-CW-16-5/02 (Parni 20-Sep- 30-Sep- 7-Oct- 9-Jun- 22D 20-Sep-16 20-Sep-16 94.77 Vordi Hrair LLC VSC CW) 16 16 16 17 Contra CARMAC2-CW-16-5/03 (Parni 13-Sep- 7-Oct- 9-Jun- 22E 13-Sep-16 1.86 Alternative LLC VSC Supervision) 16 16 17 Reconstruction of Glass Greenhouses 23 CW SH Post 2015 for SCV Contra CARMAC2-CW-15-1/01-04 15-May- 1-Jun- 31-Jul- 23A CS CQ Post 2015 4-Feb-15 5.95 HGSHN LLC (Glass Greenhouse Design&Author) 15 15 15 Contra CARMAC2-CW-15-1/02 (Glass 15-Oct- 30-Oct- 2-May- 23B CW SH Post 2015 31-Jul-15 25-Sep-15 5-Oct-15 202.20 Saz-Agro LLC Greenhouse CW) 15 15 16 Contra CARMAC2-CW-15-1/03 (Glass 15-Oct- 30-Oct- 2-May- 23C CS CQ Post 2015 4-Feb-15 2.96 Shinindustria LLC Greenhouse Supervis) 15 15 16 Reconstruction of Glass Greenhouses CW SH Post 2016 for SCV Contra CARMAC2-CW-16-4/01-04 16-Feb- 29-Jul- 31- 23D CS CQ Post 2016 19-Jul-16 7.90 HGSHN LLC (Glass Greenhouse Design&Author) 16 16 Aug-16 Contra CARMAC2-CW-16-4/02 (Glass 30-Aug- 22- 23- Nik-Dav Group 23E CW SH Post 2016 19-Sep-15 25-Sep-15 9-Sep-16 199.28 Greenhouse CW) 16 Sep-16 May-17 CJSC Contra CARMAC2-CW-16-4/03 (Glass 16-Feb- 22- 23- 23F CS CQ Post 2016 1-Sep-16 3.25 Shinindustria LLC Greenhouse Supervis) 16 Sep-16 May-17 Refurbishment of Plastic Greenhouses 24 CW SH for SCV 24A SCV Plastic Greenhouses CW CW SH Post 2017 7-Apr-17 24B SCV Plastic Greenhouses Supervision CS CQ Post 2017 24C SCV improvement CW CW SH Post 2017 7-Mar-17 24D SCV improvement CW Supervision CS CQ Post 2017 25 Refurbishment of Phytopathology Lab CW SH Post 2015 10-Nov-15 Contra CARMAC2-CW-15-2/01-04 10- 10- 25A CS CQ Post 2015 4-Feb-15 2-Sep-15 9.28 HGSHN LLC (Glass Greenhouse Design&Author) Sep-15 Nov-15 Contra CARMAC2-CW-15-2/02 (Glass 10- 7-Jun- Hydroveranorogum 25B CW SH Post 2015 30-Oct-15 30-Oct-15 30-Oct-15 9-Nov-15 197.38 Greenhouse CW) Dec-15 16 LLC Contra CARMAC2-CW-15-2/03 (Glass 25-Nov- 10- 7-Jun- 25C CS CQ Post 2015 4-Feb-15 2.57 Shinindustria LLC Greenhouse Supervision) 15 Dec-15 16 Reconstruction of Glass Greenhous CW SH Post 2016 Boiler for SCV Contra CARMAC2-CW-16-3/01-04 20-Jan- 29- 4-Feb-15 8-Jan-16 9.52 HGSHN LLC 25D (Glass Greenhouse Boiler CS CQ Post 2016 16 Feb-16 Design&Author) Contra CARMAC2-CW-16-3/02 (Glass 11-Apr- 6-May- 6-Jan- Hydroveranorogum 25E CW SH Post 2016 4-Mar-16 1-Apr-16 1-Apr-16 194.22 Greenhouse Boiler CW) 16 16 17 LLC Contra CARMAC2-CW-16-3/03 (Glass 16-Feb- 29-Apr- 6-May- 6-Jan- 25F CS CQ Post 2016 3.15 Shinindustria LLC Greenhouse Boiler Supervision) 16 16 16 17 969.7 Prior/ 27 Preparation of PLMDP CS QCBS/ CQ 2015 Post Preparation of PLMDP for 50 15- 25-Mar- 15- 28- 10-Mar-15 22-Mar-15 9-Apr-15 192.00 Wide Gate LLC 27A communities Contra CS CQ Prior 2015 Mar-15 15 May-15 Feb-16 CARMAC2-CS-15/02 (PMP) Preparation of PLMDP for 50 20-Apr- 14-May- 27- 28- 15-Apr-16 27-Apr-16 29-Apr-16 187.30 Wide Gate LLC 27B communities Contra CS CQ Post 2016 16 16 May-16 Feb-17 CARMAC2-CS-16/13 (PMP) Preparation of PLMDP for 4 29-May- 13-Jun- 3-Jul- 30-Oct- 27C CS CQ Post 2017 29-May-17 15.42 Wide Gate LLC communities 17 17 17 17 Ongoing 28 Grassland/pasture expert CS IC Post 2016 through the Project 29 Expert depending on needs CS IC Post 2015 Community Development expert 12- 14-May- 15-May- 3-Jun- 30-Jun- 10-May-15 1-Jun-15 21.79 T.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    17 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us