Electric Cost Optimization for ESP Saves Estimated USD 480,000 For

Electric Cost Optimization for ESP Saves Estimated USD 480,000 For

TECH REPORT COLOMBIA CARACARA SUR GOR, ft3/bbl [m3/m3] 200 [35,615] Electric Cost Optimization for ESP Saves Estimated Bubblepoint 150 pressure, psi [MPa] [1.03] USD 480,000 for Cepsa Bottomhole 1,200–2,300 pressure, psi [MPa] [8.3–15.9] Lift IQ service obtains real-time data to enable 16% reduction Pump setting 4,000–6,000 in electric costs during field test depth, ft [m] [1,219–1,829] 6,000–8,000 Well depth, ft [m] 18,000 [1,829–2,438] kW.h per month, before optimization kW.h per month, after optimization Using Lift IQ service, Schlumberger 16,000 monitored the ESP operational data for the 14,000 Caracara Sur field, evaluated the statistical Background 12,000 information, and also reviewed production With the current economic climate, the Schlumberger 10,000 trends, surface and downhole variables, well ASLC encouraged Compañía Española de Petróleos 8,000 intervention history, failure cause, and total (Cepsa) to evaluate system operations to increase 6,000 electric cost and consumption. efficiency. The installed ESPs were designed based 4,000 Based on this evaluation, Schlumberger on predicted reservoir and production conditions. 2,000 used DesignPro software and PIPESIM 0 However, at the current stage of production, the ESPs Well 1 Well 2 Well 3 simulator to optimize electric cost for the were encountering 90% water cut with motor load ESPs, reducing electric costs by 16% per of less than 45%, which made them inefficient and month across three wells—an approximate USD 6,951 savings of USD 79,000 per year. Once expensive to run. USD 43,443 Total economic savings per month introduced to the remaining wells, total Technologies USD 36,492 savings are expected to reach USD 480,000. ■ Lift IQ* production life cycle management service This optimization enabled Cepsa to reinvest ■ DesignPro* ESP design software these expenses in other operational areas and improve overall electrical stability ■ PIPESIM* steady-state multiphase flow simulator and infrastructure. Total expenses Total optimized per month expenses per month slb.com/liftiq *Mark of Schlumberger Other company, product, and service names are the properties of their respective owners. Copyright © 2017 Schlumberger. All rights reserved. 16-AL-231815.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us