September 16, 2012

September 16, 2012

Construction activity to begin Sunday, September 16 Project overview The Fairbanks Avenue Roadway & Wastewater Improvement Project includes the installation of a new gravity sewer system, the repaving of Fairbanks, and the beautification of the corridor between US Highway 17-92 and Interstate 4 (I-4). What does the project include? . Installation of new sewer system . Repaving & restriping of road to add new bicycle lanes . Replacement of two signalized intersections . Installation of decorative street lights . Improvements to pedestrian crosswalks What should businesses expect? . Most of the work on Fairbanks will take place in the evening after normal business hours. Two lanes of traffic eastbound and westbound are expected to be maintained during normal daytime business hours. If special signage is necessary, the city will make every effort to provide information to direct customers to your business. Maintenance of Traffic (MOT) will be done in accordance with Florida Department of Transportation (FDOT) requirements. Frequent changes to the MOT should be expected throughout the project as construction progresses. What should residents expect? . Residences directly behind the commercial Stay informed businesses on Fairbanks may be unavoidably impacted by nighttime construction activities. Updates to the construction schedule will be . Impact to residents from daytime force main posted regularly on the Fairbanks web page construction activities on Cambridge Boulevard, cityofwinterpark.org/fairbanks. Salisbury Road and Wymore Road, will be . To receive email updates follow these steps: minimized by using special construction . Visit the Fairbanks web page techniques. cityofwinterpark.org/fairbanks . Restricted access to driveways and properties . Click on “Sign Up Here for Email Updates” should be minimal and of short duration. button to enter your email information . All work will take place within existing state, . Select “Fairbanks AveNews” subscription county or city rights of way. [email protected] 407.643.1655 cityofwinterpark.org/fairbanks Project Schedule* 2012 September . Notice to Proceed: mobilization . Lift station construction begins at Jackson Avenue . Sewer & force main installation begins October thru April 2013 . New traffic signals installed at the intersections of Clay and Fairbanks avenues and Formosa & Fairbanks avenues . Decorative, vintage light poles installed . Sewer, force main & lift station work continues 2013 April . Milling & resurfacing of Fairbanks Avenue May . Final restriping & review of punch list activities August . Fairbanks Avenue Roadway & Wastewater Improvement Project complete *Please note . The dates and tasks above are subject to change based on the contractors means and methods. Stay informed . Check the Fairbanks web page cityofwinterpark.org/fairbanks for the most up-to-date information . Sign up for regular email updates at cityofwinterpark.org/fairbanks . Email [email protected] . Call 407.643.1655 .

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us