Look Online at How We Are Building a Better M1 Between Brisbane And

Look Online at How We Are Building a Better M1 Between Brisbane And

Getting you to We want you to get where you’re your destination Building a better M1 going more reliably, so you can spend between Brisbane and the Gold Coast more time doing the things you love Reduced congestion Reliable commutes The M1 takes hundreds of thousands of Queenslanders to work, Improved freight network Smarter traffic flow to school, shops and to our incredible beaches and hinterland. It’s also a vital freight link between Queensland and our southern October 2020 neighbours, carrying more than 70,000 trucks each week. 13 QGOV (13 74 68) Connected communities Improved safety www.tmr.qld.gov.au | www.qld.gov.au We’re improving the M1 with over $4.4 billion of upgrades New technology Smart motorway technologies will be delivered Brisbane Logan Gold Coast in stages between Eight Mile Plains in the north, through to Tugun in the south, either as separate smaller construction packages or as Upgrades to the Motorway widening between Motorway widening between Upgrades to exits Coomera New lanes added between Bridges and new lanes added part of major upgrades. M1/M3 Gateway Merge Eight Mile Plains and Daisy Hill Daisy Hill and Logan Motorway 38, 41, 45, 49, 54 and 57 Connector Mudgeeraba to Varsity Lakes between Varsity Lakes and Tugun 2018 – 2020 2020 – 2024 2018 – 2020 2020 – 2024 PROJECT STATUS We have upgraded the This stage will add new lanes, extend The third stage of the M1 North upgrade A 45km north-south To make sure this section We have moved straight to the next M1 / M3 Gateway Merge, the Busway from Eight Mile Plains to will add new lanes southbound corridor between is ready for the future, stage; widening bridges, adding Safety Completed reducing congestion and Springwood, add a new park-n-ride from Springwood to Loganholme Loganholme and Nerang. we have widened the new lanes in each direction, and The yellow figures you see at M1 project sites let Under construction improving your commute. at Rochedale and complete the V1 and northbound from Daisy Hill to The Coomera to Nerang motorway by adding new improving the quality of this busy you know that construction workers are close by, Planning cycleway link from Gateway Motorway Loganholme, including providing for section has been identified lanes, to help you get to section of the M1, which carries even if you can’t see them. They also provide our to Paradise Road. Construction is public and active transport. as Stage 1. Construction your destination sooner. more than 8000 trucks each day. workers with a visual reminder of nearby risks or currently underway. could start in 2021. Construction is currently underway. hazards. Safety is our number one priority..

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us