HS2 - Category III Check Rail of Scheme Design for C2 and C3

HS2 - Category III Check Rail of Scheme Design for C2 and C3

HS2 - Category III Check Rail of Scheme Design for C2 and C3 CLIENT: Arcadis Consulting (UK) Ltd Project overview: END CLIENT: This project concerns the Category III check of the Scheme Design for Main Works Eiffage Genie Civil; Contracts C2 and C3 of HS2 Phase 1, which is a high-speed rail link between London Euston and Birmingham. Kier Infrastructure and Overseas Ltd; HS2 Ltd Contract C2 consists of the section between North Portal of Chiltern Tunnels and Brackley. COLLABORATING FIRMS: Jacobs UK Ltd Contract C3 consists of the section from Brackley to Long Itchington Wood Green Tunnel South Portal. LOCATION: UK Rendel’s services: CAPEX: £965 million Rendel was appointed to provide the Category III independent design check services of primary permanent work assets and components within the scope of FEES: £2.25 million Lots C2 and C3. DATES: 2019-2020 Rendel is checking the following structures: SERVICES: Cat 3 check of • Four composite viaducts Scheme Design 1. Wendover Dean Viaduct - Steel and concrete double composite viaduct; 10 spans and total length of 450m 2. Small Dean Viaduct - Steel and concrete double composite viaduct; 6 spans and total length of 295m 3. Turweston Viaduct - Weathering steel-concrete double composite box viaduct; 2 spans and total length of 80m 4. Lower Thorpe Viaduct - Weathering steel-concrete single composite multi- girder viaduct; 7spans and total length of 210m HS2 - Category III Check Rail of Scheme Design for C2 and C3 Rendel’s services continued: • Two pre-stressed viaducts (450m-long Wendover Dean and 315m-long Small Dean) 1. Lower Radbourne South Viaduct - Prestressed concrete viaduct; 5 spans and total length of 100m 2. Edgcote Viaduct - Prestressed concrete viaduct; 21 spans and total length of 515m • Two ‘green tunnels’ 1. Chipping Warden cut and cover tunnel - Precast concrete Matiere twin arch, maximum cover 16m, total length of 2400m 2. Wendover Green cut and cover tunnel - Prestressed Matiere twin arch, total length of 1425m • Seven truss bridges 1. 6No. 56m single span weathering steel Vierendeel trusses 2. 1No. 3 span weathering steel trusses with central span 56m. Total length 96m • Two pre-stressed overbridges 1. Bridleway AX16 Accommodation Overbridge: 3-span, pre-stressed bridge with total length 93m 2. Footpath SM101 Green Overbridge - 3-span pre-stressed bridge with total length 69m • One composite overbridge - Perry Hill Overbridge - 2-span 92m skewed multi- girder steel composite Overbridge with total length 95m • Seven underbridges 1. 4No. single span precast concrete box Underbridges. Lengths varying between 4- 9m 2. 3No. single span in-situ portal Underbridge. Lengths varying between 4- 13m • Six earthworks 1. Small Dean North Embankment - 733m embankment, max height 12.9m 2. Small Dean South Embankment - 1026m embankment, max height 9.5m 3. Boddington Cutting - 2045m cutting, max height 14.3m 4. Oxford Canal North Embankment - 1203m embankment, max height 8m 5. Ladbroke Cutting - 2241m cutting, max height 28.4m 6. Brackley South Cutting - 1960m cutting, max height 18.6m.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us