Roads Department of Georgia

Roads Department of Georgia

Roads Department of Georgia Estimated period for implementation of construction works N Project name Estimated length (km) Donor Note Commencement Completion Ongoing construction Remaining Works for the Construction of Samtredia-Grigoleti Road 1 11.50 2018 2021 EIB ongoing Section of E-60 Highway Km 00+000 – Km 11+500 (Lot I) Construction of Samtredia-Grigoleti Road Section Km 42+000 – Km 2 9.57 2015 2021 EIB ongoing 51+570 (Lot IV) Construction of Grigoleti-Kobuleti Bypass Road Section km 0+000 to km 3 14.00 2019 2022 EIB ongoing 14+000 of E70 Highway 4 Construction of Batumi Bypass Road, Section km -1+000 – km13+325 12.33 2018 2021 ADB/AIIB ongoing Construction works for the E-60 Highway Section from Zemo Osiauri to 5 6.36 2021 2023 WB ongoing Chumateleti Lot2 (Km 7+700-Km14+060) Rehabilitation of Dzirula – Kharagauli – Moliti – Pona – Chumateleti 6 Secondary Road (50 km), Dzirula – Moliti Road Section from km 0+000 to 25.00 2018 2021 ADB ongoing km 24+620 (lot I) Rehabilitation of Dzirula-Kharagauli-Moliti-Pona-Chumateleti Secondary 7 Road, Moliti – Chumateleti Road Section from km 24+620 to km 25.00 2019 2021 ADB ongoing 50+244(Lot 2) 8 Construction of Chumateleti-Khevi Section (F1) of E-60 Highway 11.60 2019 2022 WB/EIB ongoing 9 Construction of Khevi-Ubisa Road Section (F2) of E-60 Highway 12,2 2019 2022 ADB ongoing Estimated period for implementation of construction works N Project name Estimated length (km) Donor Note Commencement Completion 10 Construction of Ubisa-Shorapani Road Section (F3) of E-60 Highway 13.00 2019 2022 EIB ongoing 11 Construction of Shorapani-Argveta Section (F4) of E-60 Highway 14,7 2019 2023 ADB ongoing Upgrading of Kutaisi Bypass-Samtredia road into 4-lane highway, km 12 6.00 2019 2021 GOG ongoing 00+000-km6+000 (Lot 1) Upgrading of Kutaisi Bypass-Samtredia road into 4-lane highway, 13 7.40 2019 2021 GOG ongoing km6+000-km13+400 (Lot 2) Upgrading of Kutaisi bypass-Samtredia road into 4-lane highway, km 14 11.35 2019 2021 GOG ongoing 30+000 - km41+354 (Lot 4) 15 Construction of Kvesheti-Kobi Road (tunnel section) 10.00 2020 2024 ADB ongoing 16 Construction of Kvesheti-Kobi Road (road section) 12.70 2020 2023 ADB/EBRD ongoing Rehabilitation-reconstruction of Batumi(Angisa)-Akhaltsikhe (შ- 17 1)secondary road, Khulo-Goderdzi Pass Section (Lot 1 – from km5+195 to 24.54 2021 2023 KFAED ongoing km 29+732) Rehabilitation-reconstruction of Batumi(Angisa)-Akhaltsikhe (შ- 18 1)secondary road, Goderdzi Pass –Zarzma Section (Lot 2 – from km0+000 42.00 2020 2022 KFAED ongoing to km 17+380) Estimated period for implementation of construction works N Project name Estimated length (km) Donor Note Commencement Completion Akhmeta-Telavi-Bakurtsikhe (construction of Gurjaani-Bakurtsikhe 19 15.50 2017 2021 WB ongoing bypass road) Design and Build of Khidistavi-Ateni-Boshuri Road Section Rehabilitation 20 from km12,4 to km22,5 under Output-and Performance-Based 10.10 2017 2021 WB ongoing Contracting (OPBC) Methodology Design and Build of Tianeti-Akhmeta-Ninigori Road Section 21 Rehabilitation from km1 to km30 under Output and Performance Based 30.00 2017 2021 WB ongoing Contracting (OPBC) Methodology Rehabilitation Works for Zhinvali – Barisakho - Shatili Road Section from 22 9.52 2020 2021 WB ongoing km 16 – km 25.5 (Project Chainage 0+000 – 9+516) Rehabilitation Works for Zhinvali – Barisakho - Shatili Road Section from 23 7.24 2020 2021 WB ongoing km25.5-km32 (project chainage 9+516 – 16+756) Completed construction Construction of Samtredia-Grigoleti Road Section km 11+500-to km 1 18.50 2016 2020 EIB Completed 30+000 (lot II) Construction works for the E-60 Highway Section from Zemo Osiauri to 2 5.80 2017 2020 EIB Completed Chumateleti Lot1 (Km 0+000-Km5+800) Construction works for the E-60 Highway Section from Zemo Osiauri to 3 1.90 2019 2020 WB Completed Chumateleti Lot2A (Km5+800 km7+700) Upgrading of Kutaisi Bypass-Samtredia road into 4-lane highway, 4 17.50 2019 2020 GOG Completed km13+400 - km30+000 (Lot 2) Estimated period for implementation of construction works N Project name Estimated length (km) Donor Note Commencement Completion Mountain roads 1 Sno-Juta-Roshka-Shatili-Omalo-Khadori Gorge-Batsara 134.7 2018 2022 GOG Rehabilitation works are underway 2 Baghdati-Abastumani 77.00 2018 2022 GOG Rehabilitation works are underway 3 Zemo Imereti-Racha 51.00 2018 2021 GOG Rehabilitation works are underway Planned construction 1 Natakhtari-Zhinvali 27.00 2 Batumi (Chorokhi)-Sarpi 11.30 3 Rustavi-Red Bridge 31.90 4 Algeti-Sadakhlo 29.30 5 Tbilisi-Sagarejo 35.00 6 Sagarejo-Bakurtsikhe 50.00 7 Gurjaani(Chumlaki)-Telavi Bypass 36.70 8 Bakurtsikhe-Tsnori 16.70 9 Bridge over Rioni river near Poti 2.50 Construction of Samtredia-Grigoleti Road Section Km 30+000 – Km 10 12 42+000 (Lot III).

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    4 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us