Section for Report

Section for Report

Amended - 2018 HUSAB MINE AND ASSOCIATED LINEAR INFRASTRUCTURE ENVIRONMENTAL MANAGEMENT PLAN (EMP) 080818_Final Amended Husab Mine EMP to MET Page 1 AMENDED -2018 HUSAB MINE AND ASSOCIATED LINEAR INFRASTRUCTURE ENVIRONMENTAL MANAGEMENT PLAN TABLE OF CONTENTS 1. INTRODUCTION ........................................................................................... 7 2. PURPOSE OF THE HUSAB MINE AND ASSOCIATED LINEAR INFRASTRUCTURE EMP ......................................................................... 11 2.1 Legal Requirements for an EMP ......................................................................................... 11 2.2 How this EMP will be used ................................................................................................. 11 2.2.1 Construction Contractors’ EMP ............................................................................ 13 2.2.2 EPCM EMP ........................................................................................................... 13 2.2.3 Early Mining EMP................................................................................................. 14 2.3 Induction and Environmental Awareness Training ............................................................. 14 2.3.1 Auditing EMP Compliance ................................................................................... 14 2.3.2 Integrated Management System ............................................................................ 14 2.4 Environmental Issues and Management Plans .................................................................... 14 2.5 Environmental Permits/Certificates/authorisations ............................................................. 16 3. LEGAL FRAMEWORK .............................................................................. 17 4. OVERALL ENVIRONMENTAL OBJECTIVES FOR THE PROJECT ...................................................................................................... 18 5. SCOPE OF THE EMP ................................................................................. 21 6. PROJECT OVERVIEW .............................................................................. 22 6.1 Construction Phase .............................................................................................................. 22 6.2 Operational Phase ................................................................................................................ 22 6.3 Decommissioning and Closure ............................................................................................ 22 7. ENVIRONMENTAL MANAGEMENT PLAN ......................................... 37 7.1 Stakeholder Consultation and Communication Management Plan ..................................... 38 7.1.1 Introduction ........................................................................................................... 38 7.1.2 SEMP requirements ............................................................................................... 39 7.1.3 EIA Commitments ................................................................................................. 39 7.1.4 Management Plan .................................................................................................. 40 7.2 Safety and Security Management ........................................................................................ 41 7.3 Introduction .......................................................................................................................... 41 7.3.1 SEMP Requirements.............................................................................................. 41 7.3.2 EIA Commitments ................................................................................................. 41 7.3.3 Relevant Activities ................................................................................................ 42 7.3.4 Management Plan .................................................................................................. 42 7.4 Biodiversity (Fauna and Flora) Management ...................................................................... 44 7.4.1 Introduction ........................................................................................................... 44 7.4.2 SEMP Requirements.............................................................................................. 45 7.4.3 EIA Commitments ................................................................................................. 46 080818_Final Amended Husab Mine EMP to MET Page 2 7.4.4 Relevant Activities ................................................................................................ 48 7.4.5 Management Plan .................................................................................................. 49 7.5 Surface and Stormwater Management ................................................................................. 60 7.5.1 Introduction ........................................................................................................... 60 7.5.2 SEMP Requirements.............................................................................................. 60 7.5.3 EIA Commitments ................................................................................................. 60 7.5.4 Relevant Activities ................................................................................................ 61 7.5.5 Management Plan .................................................................................................. 62 7.6 Groundwater Management .................................................................................................. 72 7.6.1 Introduction ........................................................................................................... 72 7.6.2 SEMP Requirements.............................................................................................. 72 7.6.3 EIA Commitments ................................................................................................. 72 7.6.4 Relevant Activities that could Impact on Groundwater ........................................ 73 7.6.5 Management Plan .................................................................................................. 75 7.7 Air Quality Management ..................................................................................................... 77 7.7.1 Introduction ........................................................................................................... 77 7.7.2 SEMP Requirements.............................................................................................. 77 7.7.3 EIA Commitments ................................................................................................. 79 7.7.4 Relevant Activities ................................................................................................ 79 7.7.5 Management Plan .................................................................................................. 80 7.8 Soil Management ................................................................................................................. 82 7.8.1 Introduction ........................................................................................................... 82 7.8.2 SEMP Requirements.............................................................................................. 83 7.8.3 EIA Commitments ................................................................................................. 83 7.8.4 Relevant Activities ................................................................................................ 83 7.8.5 Management Plan .................................................................................................. 84 7.9 Visual Aspect Management ................................................................................................. 87 7.9.1 Introduction ........................................................................................................... 87 7.9.2 SEMP Requirements.............................................................................................. 87 7.9.3 EIA Commitments ................................................................................................. 88 7.9.4 Relevant Activities ................................................................................................ 89 7.9.5 Management Plan .................................................................................................. 90 7.10 Waste Management ............................................................................................................. 90 7.10.1 Introduction ........................................................................................................... 90 7.10.2 SEMP Requirements.............................................................................................. 91 7.10.3 EIA Commitments ................................................................................................. 91 7.10.4 Management Plan .................................................................................................. 92 7.11 Noise Management ............................................................................................................ 106 7.11.1 Introduction ......................................................................................................... 106 7.11.2 SEMP Requirements...........................................................................................

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    210 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us