Lower Republican River Basin: Nebraska and Kansas

Lower Republican River Basin: Nebraska and Kansas

University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln U.S. Bureau of Land Management Papers U.S. Department of the Interior 2005 Lower Republican River Basin: Nebraska and Kansas Follow this and additional works at: http://digitalcommons.unl.edu/usblmpub Part of the Agriculture Commons, and the Plant Sciences Commons "Lower Republican River Basin: Nebraska and Kansas" (2005). U.S. Bureau of Land Management Papers. 38. http://digitalcommons.unl.edu/usblmpub/38 This Article is brought to you for free and open access by the U.S. Department of the Interior at DigitalCommons@University of Nebraska - Lincoln. It has been accepted for inclusion in U.S. Bureau of Land Management Papers by an authorized administrator of DigitalCommons@University of Nebraska - Lincoln. Appraisal Report Lower Republican River Basin Nebraska and Kansas January 2005 Table of Contents Page Executive Summary ............................................................................................ vii Chapter 1 ─ Introduction......................................................................................1 1.1 Authority ..................................................................................................1 1.2 Purpose and Scope of this Appraisal Study .............................................1 1.3 Objectives.................................................................................................1 1.4 Project Area and Description ...................................................................2 1.5 Prior Studies, Reports, and Existing Water Projects ................................4 1.6 Consultation and Meetings.......................................................................5 Chapter 2 ─ Problems and Needs.........................................................................7 2.1 Republican River Compact ......................................................................7 2.2 Republican River Compact Litigation and Settlement.............................7 2.3 Settlement Provisions ...............................................................................8 2.4 Problems and Opportunities .....................................................................9 2.4.1 Existing Conditions..........................................................................9 2.4.2 Expected Future Conditions...........................................................10 2.4.3 Opportunities..................................................................................11 2.4.4 Problems Warranting Federal Participation...................................11 2.4.5 Planning Objectives and Planning Constraints ..............................12 2.4.5.1 Planning Objectives ...................................................12 2.4.5.2 Planning Constraints ..................................................12 Chapter 3 ─ Alternative Plans............................................................................13 3.1 Management Methods ............................................................................13 3.1.1 Winterize Superior-Courtland Diversion Dam and Courtland Canal .............................................................................13 3.1.2 Automate Superior-Courtland Diversion Dam and Courtland Canal .............................................................................13 3.1.3 Renovate Courtland Canal (Restore the Courtland Canal to Design Capacity)............................................................................14 3.1.4 Provide for Increased Conservation Storage in Lovewell Reservoir........................................................................14 i Lower Republican River Basin Appraisal Report ─ Nebraska and Kansas 3.2 River System Operation Model..............................................................16 3.3 Description of Baseline and Alternatives...............................................16 3.3.1 Alternative A ─ Courtland Canal to Design Capacity, Winterize .18 3.3.2 Alternative B ─ Automate, Winterize Courtland Canal ................18 3.3.3 Alternative C ─ Automate, Winterize, Courtland Canal to Design Capacity .............................................................................19 3.3.4 Alternative D ─ Automate, Winterize Courtland Canal; Raise Lovewell 16,000 ac-ft ..........................................................19 3.3.5 Alternative E ─ Automate, Winterize, Courtland Canal to Design Capacity; Raise Lovewell 16,000 ac-ft..............................19 3.3.6 Alternative F ─ Automate, Winterize Courtland Canal; Raise Lovewell 35,000 AF ............................................................19 3.3.7 Alternative G ─ Automate, Winterize, Courtland Canal to Design Capacity; Raise Lovewell 35,000 ac-ft..............................19 3.3.8 Alternative H ─ Raise Lovewell 16,000 ac-ft ...............................19 3.3.9 Alternative I ─ Courtland Canal to Design Capacity; Raise Lovewell 16,000 ac-ft ..........................................................19 3.3.10 Other Storage Alternatives..........................................................19 3.4 Evaluation of Alternatives......................................................................20 3.4.1 Hydrologic Evaluations .................................................................20 3.4.1.1 Changes of Water Supply into Lovewell Reservoir ....20 3.4.1.2 Minimum Desirable Streamflows Analysis .................20 3.4.1.3 Farm Delivery Changes ...............................................21 3.4.2 Alternative Design and Cost Estimates..........................................21 3.4.2.1 Canal Components .......................................................21 3.4.2.2 Components to Increase Storage Capacity in Lovewell Reservoir......................................................23 3.4.2.3 Other Storage Alternatives...........................................27 3.4.2.4 Recreation Mitigation ..................................................29 3.4.2.5 Cost Estimates..............................................................31 3.4.3 Economic Benefit Evaluation ........................................................35 3.4.3.1 Irrigation Benefit Estimation .......................................36 3.4.3.2 Evaluation of Recreation Benefits ...............................38 3.4.3.3 Benefit-Cost Analysis ..................................................42 ii Lower Republican River Basin Appraisal Report ─ Nebraska and Kansas 3.4.4 Environmental Evaluations .............................................................44 3.4.4.1 Alternatives A, B, and C: Alternatives That Only Involve the Diversion Dam and Canal.........................46 3.4.4.2 Alternatives D, E, H, and I: Alternatives That Also Involve Raising Lovewell 16,000 Ac-Ft......................46 3.4.4.3 Alternatives F and G: Alternatives That Also Involve Raising Lovewell 35,000 Ac-Ft...................................46 3.4.5 Socioeconomics ..............................................................................47 3.4.5.1 Overview...................................................................47 3.4.5.2 Agricultural Production and Value ............................47 3.4.6 Cultural Resources Evaluations .....................................................47 3.4.6.1 Alternatives A, B, and C: Alternatives That Only Involve the Diversion Dam and Canal.........................48 3.4.6.2 Alternatives D, E, F, G, H, and I: Alternatives That Also Involve Raising Lovewell Reservoir...................48 3.4.6.3 Other Storage Alternatives...........................................49 3.4.7 Legal and Institutional Evaluations ...............................................50 3.4.7.1 Legal ............................................................................50 3.4.7.2 Institutional ..................................................................55 3.4.8 Summary of the Evaluation of Alternatives...................................56 3.4.9 Uncertainties ..................................................................................57 Chapter 4 ─ Findings...........................................................................................61 4.1 Findings ..................................................................................................61 4.1.1 Recommendations..........................................................................61 4.2 Preliminary Plan of Study ─ Feasibility Study.......................................61 Appendices Appendix A Hydrology Report Appendix B Cost Estimate Worksheets Appendix C Recreation Mitigation Costs Appendix D Benefit Estimation Appendix E Recreation Analysis Appendix F Preliminary Plan of Study ─ Feasibility Study iii Lower Republican River Basin Appraisal Report ─ Nebraska and Kansas Figures Figure 1 Study Area .........................................................................................................3 Figure 2 Lovewell Reservoir Existing Allocations ........................................................14 Figure 3 Lovewell Reservoir Allocations for 16,000 ac-ft Enlargement .......................15 Figure 4 Lovewell Reservoir Allocations for 35,000 ac-ft Enlargement .......................15 Figure 5 Schematic Diagram of Lower Republic River Basin.......................................17 Tables Table 1 Summary of Model Runs .................................................................................18 Table 2 Average Discharge from Courtland Canal into Lovewell ...............................20 Table 3 Average Annual

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    238 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us