Study on Environmental Impact Assessment for Motorway IPSA

Study on Environmental Impact Assessment for Motorway IPSA

IPSA INSTITUT Study on Environmental Impact Assessment for Motorway LOT 5, 6: SECTION MOSTAR NORTH - MOSTAR SOUTH – POČITELJ Mostar South - Buna 13+256,79 – 28+695,00 i 4+389,63 – 15+440,00 -Corrected - Sarajevo, December 2016. April 2017 Title: Study on Environmental Impact Assessment for Motorway LOT 5, 6: SECTION MOSTAR NORTH - MOSTAR SOUTH – POČITELJ Mostar South – Buna 13+256,79 – 28+695,00 I 4+389,63 – 15+440,00 - Corrected - Investor: JP Autoceste FBiH d.o.o. Mostar Head office in Mostar: Braće Fejića bb, 88000 Mostar Tel: + 387 36 512 300 Fax: + 387 36 512 301 Sarajevo operative office: Dubrovačka 6, 71000 Sarajevo Tel: + 387 33 277 900 Fax: + 387 33 277 901 E-mail: [email protected] www.jpautoceste.ba Contracting IPSA INSTITUT authority: Put života bb, 71000 Sarajevo Developer Centre for economic, technological and environmental development – CETEOR d.o.o. Sarajevo Topal Osman Paše 32 B BA, 71000 Sarajevo Tel: +387 33 563 580 Fax: +387 33 205 725 E-mail: [email protected] Time of December 2016. development: April 2017 Number: 05/P-1793/16 2 CONTENT IPSA --------------------------------------------------------------------------------------------------------------------------------------- 1 CONTENT ---------------------------------------------------------------------------------------------------------------------------------- 3 1. INTRODUCTION ------------------------------------------------------------------------------------------------------------------ 6 Social and economic significance of the project----------------------------------------------------------------------------- 10 2. DESCRIPTION OF PROPOSED PROJECT ----------------------------------------------------------------------------------- 12 2.1. Description of the physical characteristics of the entire project and land use requirements during the construction and operation of plants and facilities envisaged by the project ---------------------------------------- 12 Bosnia and Herzegovina in the context of European transport routes ------------------------------------------------- 12 Road network in B&H ------------------------------------------------------------------------------------------------------------ 12 Project background ---------------------------------------------------------------------------------------------------------------- 13 Analysis of the route proposal displacement -------------------------------------------------------------------------------- 14 Data for design --------------------------------------------------------------------------------------------------------------------- 19 Data from physical planning documents ------------------------------------------------------------------------------------- 20 2.2. Description of the main characteristics of the production process, the nature and quantity of materials used ----------------------------------------------------------------------------------------------------------------------------------- 20 Technical elements of the motorway ------------------------------------------------------------------------------------------ 22 Overview of elements of the motorway route and a list of structures on the changed part of the route ------ 23 Geotechnical characteristics of the material along the route ------------------------------------------------------------ 25 Pavement structure --------------------------------------------------------------------------------------------------------------- 25 Drainage system ------------------------------------------------------------------------------------------------------------------- 25 Engineering structures ------------------------------------------------------------------------------------------------------------ 25 Crossing roads and other infrastructure -------------------------------------------------------------------------------------- 29 Intersections ------------------------------------------------------------------------------------------------------------------------ 29 Toll facilities and rest service facilities ---------------------------------------------------------------------------------------- 30 Road furniture ---------------------------------------------------------------------------------------------------------------------- 31 2.3. Assesment per type and quantity of expected waste and emissions (pollution of water, soil and air, noise, vibration, light, radiation, etc.) as a result of the scheduled production process ------------------------------------ 32 Noise protection -------------------------------------------------------------------------------------------------------------------- 32 Landscaping ------------------------------------------------------------------------------------------------------------------------- 33 3 3. DESCRIPTION OF ENVIRONMENT WHICH IS AFFECTED BY THE PROJECT ---------------------------------------- 34 3.1. Population and settlements - demography ----------------------------------------------------------------------------- 34 3.2 Geographical features ---------------------------------------------------------------------------------------------------- 36 3.3 Geomorphological characteristics -------------------------------------------------------------------------------------- 37 3.4. Climate characteristics - general ------------------------------------------------------------------------------------------ 38 Climate characteristics – the City of Mostar --------------------------------------------------------------------------------- 39 Temperature ------------------------------------------------------------------------------------------------------------------------ 41 Precipitation, humidity and fog ------------------------------------------------------------------------------------------------- 42 Wind and pressure ----------------------------------------------------------------------------------------------------------------- 42 3.5. Air pollution ------------------------------------------------------------------------------------------------------------------- 44 Production and emissions of pollutants --------------------------------------------------------------------------------------- 44 Overview state of air quality monitoring ------------------------------------------------------------------------------------- 45 3.6 Hydrogeological characteristics -------------------------------------------------------------------------------------------- 47 3.7. Cultural-historical heritage ------------------------------------------------------------------------------------------------- 50 3.8. Biodiversity -------------------------------------------------------------------------------------------------------------------- 51 3.9. Soil and agricultural lend --------------------------------------------------------------------------------------------------- 63 3.10. Landscaping ------------------------------------------------------------------------------------------------------------------ 64 3.11 The specific elements identified in the previous EIA ------------------------------------------------------------ 64 4. DESCRIPTION OF LIKELY SIGNIFICANT IMPACTS OF PROJECT ON ENVIRONMENT ---------------------------- 65 4.1. Land use, land acquisition and displacement -------------------------------------------------------------------------- 65 4.2. The impact on the climate characteristics ------------------------------------------------------------------------------ 66 4.3. Air quality ---------------------------------------------------------------------------------------------------------------------- 66 4.4. Noise and vibrations --------------------------------------------------------------------------------------------------------- 68 4.5. Water resources -------------------------------------------------------------------------------------------------------------- 69 4.6. Water management --------------------------------------------------------------------------------------------------------- 70 4.7. Supply and transport of material, including borrow pits ------------------------------------------------------------ 70 4.8. Landscape and visual impact ---------------------------------------------------------------------------------------------- 70 4.9. Cultural and historic heritage ---------------------------------------------------------------------------------------------- 71 4.10. Economy and employment ----------------------------------------------------------------------------------------------- 71 4.11. Cumulative impacts -------------------------------------------------------------------------------------------------------- 72 4 5. MITIGATION MEASURES FOR NEGATIVE IMPACTS ON ENVIRONMENT DURING CONSTRUCTION WORK – REQUIREMENTS FOR CONTRACTORS - ENVIRONMENTAL PROTECTION ISSUES -------------------------------------- 73 Measures during and after construction -------------------------------------------------------------------------------------- 73 5.1. Air Qulity ----------------------------------------------------------------------------------------------------------------------- 73 5.2. Noise and vibrations --------------------------------------------------------------------------------------------------------- 73 5.3. Waste management --------------------------------------------------------------------------------------------------------- 74 5.4. Water protection ------------------------------------------------------------------------------------------------------------- 74 5.5. Flora -----------------------------------------------------------------------------------------------------------------------------

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    86 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us