Mekong Integrated Water Resource Management (M-IWRM) Project

Mekong Integrated Water Resource Management (M-IWRM) Project

Lao People’s Democratic Republic Peace Independence Democracy Unity Prosperity Public Disclosure Authorized Mekong Integrated Water Resource Management (M-IWRM) Project Public Disclosure Authorized ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK (ESMF) Public Disclosure Authorized Public Disclosure Authorized March 9, 2017 (Revised March 12, 2021) PREFACE This Environmental and Social Management Framework (ESMF) for Lao PDR is being applied to all activities financed by the World Bank (WB) for technical and/or financial support from the Mekong Integrated Water Resource Management (M-IWRM) Project. This updated version of the ESMF applies to both ongoing activities funded under the additional financing (AF) and new activities to be funded under the Project restructuring. The restructuring extends the Project duration by another eleven months. The national Project Management Unit (PMU) of the Department of Water Resources (DWR), under the Ministry of Natural Resources and Environment (MONRE), is responsible for overall coordination of Lao PDR activities. The respective PMUs of the Department of Livestock and Fisheries (DLF) and the Department of Irrigation (DOI) of the Ministry of Agriculture and Forestry (MAF) are responsible for implementation of specific subcomponents and for ensuring compliance with the Ethnic Group Planning Framework (EGPF), including keeping proper documentation in the project file for possible review by the WB. This ESMF has been progressively revised to reflect the scope of Project activities under the original project, the AF, and the restructuring. Environmental and Social Management Framework (ESMF) 1 Mekong-Integrated Water Resource Management (M-IWRM) Project Mekong Integrated Water Resource Management (M-IWRM) Project Table of Contents PREFACE......................................................................................................................... 1 List of Abbreviations and Acronyms ..................................................................................... 3 I. Introduction .................................................................................................................... 4 II. Project Description .......................................................................................................... 5 III. Policy, Legal, and Institutional Frameworks ...................................................................... 8 3.1 WB’s Safeguard Policy Applicable for the AF ............................................................... 8 3.2 National policy, legal, and institutional frameworks ......................................................13 IV. Key Safeguard Issues and Mitigation Measures ................................................................14 4.1 Environmental and Social Background ........................................................................14 4.2 Key Issues and Proposed Mitigations ...........................................................................16 Table 2: Summary of key issues and proposed mitigation measures ..........................................19 V. Safeguard Screening Process ...........................................................................................23 5.1 Step 1: Eligibility Screening. ......................................................................................23 5.2 Step2: Technical Safeguard Screening. ........................................................................23 5.3 Step 3: Safeguard documentation and clearance .......................................................24 5.4 Step 4: Safeguard implementation, supervision, monitoring, and reporting ......................26 VI. Grievance Redress Mechanism .......................................................................................26 6.1 Mechanism and Committee ........................................................................................26 6.2 Recording and processing of grievances ......................................................................28 VII. Consultation and Information Disclosure ........................................................................28 VIII. Implementation and Monitoring Arrangement ................................................................29 Annex 1: Negative List of Prohibited Activities .................................................................32 Annex 2. Environmental Code of Practice (ECOP) ..........................................................33 Annex 3 – Simplified Pest Management Plan ..................................................................41 Annex 4: Policy, Legal, and Institutional Setting ...............................................................44 Annex 5: Environmental and Social Background and Project Area ..................................52 Annex 6: Minutes from Public Consultations on Yr 2016 ..................................................63 Annex 7: Minutes from Public Consultations on Yr 2021 ..................................................72 Annex 8: Interim Guidelines on the Application of Safeguard Policies to TA ....................75 Attachments A Compensation and Resettlement Policy Framework B Ethnic Group Planning Framework C Guidelines Rural Infrastructure; Alternative Livelihood and Fishery Management Environmental and Social Management Framework (ESMF) 2 Mekong-Integrated Water Resource Management (M-IWRM) Project List of Abbreviations and Acronyms AF Additional financing KM Khammouane Province ARAP Abbreviated Resettlement Action Lao PDR Lao’s People Democratic Plan Republic ATP Attapeu LMB Lower Mekong Basin BKX Bolikhamxay Province MAF Ministry of Agriculture and Forestry CAR Compensation and resettlement M-IWRM Mekong Integrated Water Resources Management CMU Component Management Unit M-IWRM-AF Mekong Integrated Water Resources Management Additional Financing CPS Champasak MONRE Ministry of Natural Resources and Environment CRPF Compensation and Resettlement MRC Mekong River Commission Policy Framework DLF Department of Livestock and NREI Natural Resources and Fisheries (of MAF) Environment Institute (of MONRE) DMH Department of Meteorology and OP/BP Operational policy/Bank Hydrology procedure DOI Department of Irrigation (of MAF) PA Protected Area DONRE District Office of Natural PAP Project affected peoples Resources and Environment DWR Department of Water Resources PCR Physical Cultural Resources (of MONRE) ECOP Environmental Code of Practice PFA Protection Forest Area EG Ethnic Group PMU Project Management Unit EGDP Ethnic Groups Development Plan PONRE Provincial Office of Natural Resource and Environment EGPF Ethnic Group Planning Framework Ramsar Convention on Wetlands EIA Environmental Impact Assessment SVK Savannakhet Province EPF Environmental Protection Fund USD or $ United States Dollar EPL Environmental Protection Law UXO Unexploded ordnance ESIA Environmental and Social Impacts VTC Vientiane Capital Assessment ESMF Environmental and Social VTP Vientiane Province Management Framework EMP Environmental Management Plan WB The World Bank GOL Government of Lao PDR XBF Xe Bang Fai GRC Grievance Redress Committee XBH Xe Bang Hieng GRM Grievance Redress Mechanism XCP Xe Champhone area IEE Initial Environmental Examination XK Xekong Province IWRM Integrated Water Resources Management Environmental and Social Management Framework (ESMF) 3 Mekong-Integrated Water Resource Management (M-IWRM) Project I. Introduction 1. On 8 February 2012, the World Bank (WB) approved the Mekong Integrated Water Resources Management Phase 1 project for Lao PDR (the original project or M-IWRM)1. The Project was designed to help Lao PDR establish a modern water resources management system. Component 1 of the original project was implemented by the Mekong River Commission (MRC), while Components 2 and 3 are being implemented by the Government of Lao PDR through the Ministry of Natural Resources and Environment (MONRE)2. The budget for Lao PDR of the original project was USD 18 million and the project area covered Xe Bang Fai (XBF), Xe Bang Hieng (XBH), and Xekong basins as well as the Mekong Mainstream near Lao PDR and Cambodia border, lower part of Nam Ngum, and Xedone. The implementing agencies included the Department of Water Resources (DWR), the Natural Resources and Environment Institute (NREI), the Department of Meteorology and Hydrology (DMH) of MONRE the Department of Irrigation (DOI) and the Department of Fisheries (DOF) of the Ministry of Agriculture and Forestry (MAF). 2. Although significant progress was made under the original project, additional financing (AF) was required to cover financing short-falls3 and help Lao PDR consolidate and expand the development of its water resources management system. The estimated amount of AF provided to the Project was on the order of USD 25 million. According to the Natural Resources and Environment Strategy 2025 (NRES) which outlines MONRE’s vision, aims, and strategy and an action plan for 2016-2020, MONRE requires significant support in order to strengthen institutional structures and technical capacity to effectively implement the NRES. It is expected that a new Water Law will be soon promulgated, providing MONRE with the legal authority to take a more proactive and authoritative role in management of the nation’s water and related resources. 3. This version of the Environmental and Social Management Framework (ESMF) was prepared by the M-IWRM Project (the Project) to reflect new activities funded under the Project restructuring and continues to be in

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    85 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us