Bradford Stations Masterplan

Bradford Stations Masterplan

Bradford Stations Masterplan Bradford Property Forum 17th June 2014 Key Drivers • Create a high quality station gateways for a major city centre. • Improve the visibility and connectivity of the stations within the wider city centre. • Provide better connectivity at the stations between different transport modes (e.g. bus, train, coach, taxi, airport and car parks). • Strategic approach to delivery of wayfinding (e.g. real time displays). • Take into account current and future passenger and operator capacity requirements. • Identify opportunities for new development within the adjoining the stations (including commercial and community provision). Introduction and Objectives of Study • To understand options for improving visitor experience and connectivity to City Centre. • Link to Quick Wins Wayfinding. • To produce a Masterplan for Bradford Forster Square and Bradford Interchange. • To consider short, medium and long term interventions • To provide costed options, considering economic benefits. Project Leadership Alastair Gordon Alistair Branch Associate Director Associate Director Arup Aedas • Derby Station • Rotherham Central • Castleford Interchange Station • Rotherham Central Station • Castleford interchange • Doncaster Interchange • Keighley & Worth • Barnsley Interchange Valley Alterations • Saltaire Roundabout • Rochdale Interchange • Bingley Relief Road • Bolton Interchange • Stoke Bus Station • Wythenshaw Interchange • Altrincham Interchange Simple Plan of Work Workstages: Workstage 1: Strategic Timescales: We have split the project into three stages : To understand the Railway Stations in Within each Masterplan any constituent more detail and gather key stakeholder project options will be presented on a issues and aspirations. realistic and achievable timescale. Workstage 1: We will then review the options for the The Masterplan will be phased and we will Identifying Constraints & Opportunities stations and the linkages between them prepare a series of phasing plans showing focussing on those areas identified in the how it could be delivered. Workstage 2: brief within Optioneering & Draft Masterplans Workstage 2: Workstage 3: To develop the preferred options to outline Final Masterplans & High Level Costed designs which will be sufficient to undertake Options further consultation and prepare high level cost estimates. Workstage 3: The output from this stage will be a detailed Masterplan for each station setting out the key redevelopment and remodelling options with plans, illustrations and projected costings to enable Business Cases to be developed for consideration for WY+TP and other funding sources. Stakeholder Engagement • City of Bradford Metropolitan District Council. • Combined Authority. • Network Rail. • Northern Rail. Visualisations to Clarify Opportunities & Impact Visualisations to Clarify Opportunities & Impact Understanding the Issues: Historical Context Historical Context Historical Context Historical Context Historical Context Previous Interchange Redevelopment proposal by Aedas Abbey National Building & Interchange House both by Aedas Historical Context Westfield’s Broadgate Scheme as currently proposed Historical Context Previous masterplans Historical Context Current work on the City Centre Masterplan Strategic Analysis: Interchange Location Approx Scale 1/2000 Interchange Location Interchange Location Forster Square Location Forster Square Location Forster Square Location Next Steps • Work up masterplan – on-going discussions with stakeholders – reporting in July to August 2014. • Consider Short, Medium and Long Term Priorities. • Phasing of options. • Costing and Economic Benefit Analysis. Any Comments?.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    26 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us