Agenda Item 6A

Agenda Item 6A

Agenda Item 6a Case Number 20/01437/RG3 (Formerly PP-08691398) Application Type Application Submitted by the Council Proposal Retention and refurbishment of existing buildings, demolition of associated structures and erection of new buildings to form a mixed use development comprising a communal hall with associated retail space, cafe, bar (Use Classes A1/A2/A3/A4/A5) flexible business, events and studio space (Use Classes B1/D1/D2) and associated works Location Land Bound By Cambridge Street, Wellington Street and Backfields Sheffield S1 4HP Date Received 06/05/2020 Team City Centre and East Applicant/Agent Miss Lauren Hawksworth Recommendation Grant Conditionally Time limit for Commencement of Development 1. The development shall be begun not later than the expiration of three years from the date of this decision. Reason: In order to comply with the requirements of the Town and Country Planning Act. Approved/Refused Plan(s) 2. The development must be carried out in complete accordance with the following approved documents: HOH-FCBS-Z3-XX-DR-A-0001 P1 - H3 Existing Location Plan HOH-FCBS-Z3-XX-DR-A-0010 P1 - H3 Site Plan HOH-FCBS-Z3-B1-DR-A-0038 P1 - Existing Basement Plan HOH-FCBS-Z3-LG-DR-A-0039 P1 - Existing Lower Ground Floor Plan HOH-FCBS-Z3-UG-DR-A-0040 P1 - Existing Upper Ground Floor Plan HOH-FCBS-Z3-01-DR-A-0041 P1 - Existing First Floor Plan HOH-FCBS-Z3-02-DR-A-0042 P1 - Existing Second Floor Plan HOH-FCBS-Z3-RF-DR-A-0043 P1 - Existing Roof Plan HOH-FCBS-Z3-ZZ-DR-A-0080 P1 - Existing Sections HOH-FCBS-Z3-ZZ-DR-A-0090 P1 - Existing West Elevation HOH-FCBS-Z3-ZZ-DR-A-0091 P1 - Existing Bethel Walk Elevation HOH-FCBS-Z3-ZZ-DR-A-0092 P1 - Existing East Elevations Page 11 HOH-FCBS-Z3-ZZ-DR-A-0093 P1 - Existing South Elevation HOH-FCBS-Z3-B1-DR-A-0098 P1 - Proposed Basement Level Demolition Plan HOH-FCBS-Z3-LG-DR-A-0099 P2 - Proposed Lower Ground Floor Demolition Plan HOH-FCBS-Z3-UG-DR-A-0100 P2 - Proposed Upper Ground Floor Demolition Plan HOH-FCBS-Z3-01-DR-A-0101 P1 - Proposed First Floor Demolition Plan HOH-FCBS-Z3-02-DR-A-0102 P2 - Proposed Second Floor Demolition Plans HOH-FCBS-Z3-RF-DR-A-0103 P2 - Proposed Roof level Demolition Plan HOH-FCBS-Z3-00-DR-A-0104 P2 - Proposed Ground Floor Bethel Sunday School Demolition Plan HOH-FCBS-Z3-01-DR-A-0105 P2 - Proposed First Floor Bethel Sunday School Demolition Plan HOH-FCBS-Z3-02-DR-A-0106 P1 - Proposed Second Floor Level Bethel Sunday School Demolition Plan HOH-FCBS-Z3-RF-DR-A-0107 P2 - Proposed Roof Level Bethel Sunday School Demolition Plan HOH-FCBS-Z3-ZZ-DR-A-0161 P1 - Demolition West Elevation HOH-FCBS-Z3-ZZ-DR-A-0162 P2 - Demolition Bethel Walk Elevation HOH-FCBS-Z3-ZZ-DR-A-0163 P1 - Demolition East Elevation HOH-FCBS-Z3-ZZ-DR-A-0164 P1 - Demolition South Elevation HOH-FCBS-Z3-B1-DR-A-0198 P1 - H3 Proposed Basement Plan HOH-FCBS-Z3-LG-DR-A-0199 P2 - H3 Proposed Lower Ground Floor Plan HOH-FCBS-Z3-UG-DR-A-0200 P2 - H3 Proposed Upper Ground Floor Plan HOH-FCBS-Z3-01-DR-A-0201 P2 - H3 Proposed First Floor Plan HOH-FCBS-Z3-02-DR-A-0202 P2 - H3 Proposed Second Floor Plan HOH-FCBS-Z3-03-DR-A-0203 P1 - H3 Proposed Third Floor Plan HOH-FCBS-Z3-RF-DR-A-0204 P1 - H3 Proposed Roof Plan HOH-FCBS-Z3-ZZ-DR-A-0701 P2 - H3 GA-Section AA HOH-FCBS-Z3-ZZ-DR-A-0702 P1 - H3 GA-Section BB HOH-FCBS-Z3-ZZ-DR-A-0703 P1 - H3 GA-Section CC HOH-FCBS-Z3-ZZ-DR-A-0704 P2 - H3 GA-Section DD HOH-FCBS-Z3-ZZ-DR-A-0705 P1 - H3 GA-Section EE HOH-FCBS-Z3-ZZ-DR-A-0706 P1 - H3 GA-Section FF HOH-FCBS-Z3-ZZ-DR-A-0707 P1 - H3 GA-Section GG HOH-FCBS-Z3-ZZ-DR-A-0752 P2 - H3 Site Elevations HOH-FCBS-Z3-ZZ-DR-A-0801 P2 - H3 Proposed West Elevation HOH-FCBS-Z3-ZZ-DR-A-0802 P1 - H3 Proposed North Elevation HOH-FCBS-Z3-ZZ-DR-A-0803 P1 - H3 Proposed East Elevation HOH-FCBS-Z3-ZZ-DR-A-0804 P1 - H3 Proposed South Elevation HOH-FCBS-Z3-ZZ-DR-A-0851 P1 - Bay Study - West Elevation - Arrival Building HOH-FCBS-Z3-ZZ-DR-A-0852 P2 - Bay Study - West Elevation - Bethel Chapel Reason: In order to define the permission. Pre-Commencement Condition(s) 3. Prior to the commencement of development (excluding demolition) a supplementary intrusive site investigation and risk assessment shall be carried out in accordance with the recommendations of the Preliminary Geoenvironmental Risk Assessment (ref: HOHARUP-Z3-XX-RP-CG-0002, dated 24/4/20) and be the subject of a Phase II Intrusive Site Investigation Report which shall have been submitted to and approved in writing by the Local Planning Authority. The Report shall be prepared in accordance with Contaminated Land Report CLR 11 (Environment Agency 2004). Reason: In order to ensure that any contamination of the land is properly dealt with. Page 12 4. Any remediation works recommended in the Phase II Intrusive Site Investigation Report shall be the subject of a Remediation Strategy Report which shall have been submitted to and approved in writing by the Local Planning Authority prior to construction works commencing. The Report shall be prepared in accordance with Contaminated Land Report CLR11 (Environment Agency 2004) and Local Planning Authority policies relating to validation of capping measures and validation of gas protection measures. Reason: In order to ensure that any contamination of the land is properly dealt with and the site is safe for the development to proceed, it is essential that this condition is complied with before the development is commenced. 5. Prior to the commencement of development (excluding demolition) the improvements (which expression shall include traffic control, pedestrian and cycle safety measures) to the highways listed below shall have either: a) been carried out; or b) details have been submitted to and approved in writing by the Local Planning Authority of arrangements which will have been entered into which will secure that such improvement works will be carried out before the development is brought into use. Highway Improvement Works: (i) Backfields (partial closure to motor vehicles/ diversion and associated public realm works) (ii) Bethel Walk (partial closure) (iii) Cambridge Street between Cross Burgess Street and Division Street - Displacement of on-street parking, replacement of disabled parking, provision of service laybys and public realm works. - Promotion of a Traffic Regulation Order in relation to servicing/loading (waiting and loading restrictions) and parking restrictions, and the prohibition of motorised traffic in the vicinity of the development site, all subject to usual procedures, including provision of associated signing and lining (iv) Provision for the movement of cyclists, pedestrians and motorised traffic along Backfields, (including the provision of direction signing), with the aim of providing interventions that deliver safe cycle routes in the vicinity of the development. (v) Any accommodation works to traffic signs, road markings, repositioning street lighting columns, highway drainage and general street furniture deemed necessary as a consequence of the development. (vi) All materials within public realm works and adopted highway in the vicinity of the development are to be in accordance with the Sheffield Urban Design Compendium. Reason: To enable the above-mentioned highways to accommodate the increase in traffic, which in the opinion of the Local Planning Authority, will be generated by the development, and in the interests of protecting free and safe flow of traffic on the public highway it is essential that this condition is complied with before any works on site commence. Page 13 6. Prior to the improvement works indicated in the preceding condition being carried out, full details of these improvement works shall have been submitted to and approved in writing by the Local Planning Authority. Reason: In the interests of highway safety and the amenities of the locality. 7. No development, including any demolition of foundations and groundworks, shall take place until the applicant, or their agent or successor in title, has submitted a Written Scheme of Investigation (WSI) that sets out a strategy for below-ground archaeological investigation and this has been approved in writing by the Local Planning Authority. The WSI shall include: - The programme and method of site investigation and recording. - The requirement to seek preservation in situ of identified features of importance. - The programme for post-investigation assessment. - The provision to be made for analysis and reporting. - The provision to be made for publication and dissemination of the results. - The provision to be made for deposition of the archive created. - Nomination of a competent person/persons or organisation to undertake the works. - The timetable for completion of all site investigation and post-investigation works. Thereafter the development shall only take place in accordance with the approved below-ground archaeological investigation WSI and the development shall not be brought into use until the Local Planning Authority has confirmed in writing that the requirements of the WSI have been fulfilled or alternative timescales agreed. Reason: To ensure that any archaeological remains present, whether buried or part of a standing building, are investigated and a proper understanding of their nature, date, extent and significance gained, before those remains are damaged or destroyed and that knowledge gained is then disseminated. It is essential that this condition is complied with before any other works on site commence given that damage to archaeological remains is irreversible.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    44 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us