1. Copyright of this drawing is reserved by the Architect. The drawing and all associated documents are an instrument of service by the Architect. The drawing and the information contained therein may not be reproduced in whole or in part without prior written permission of the Architect. 2. These Contract Documents are the property of the Architect. The Architect bears no responsibility for the interpretation of these documents by the Contractor. Upon written application, the Architect will provide written/graphic clarification or supplementary information regarding the intent of the Contract Documents. The Architect will review Shop Drawings submitted by the Contractor for design conformance only. 3. Drawings are not to be scaled for construction. The Contractor is to verify all existing conditions and dimensions required to perform the work and report any discrepancies with the Contract Documents to the Architect before commencing any work. 4. Positions of exposed finished mechanical or electrical devices, fittings, and fixtures are indicated on architectural drawings. The locations shown on the architectural drawings govern over the Mechanical and Electrical drawings. Those items not clearly located will be located as directed by the Architect. 5. These drawings are not to be used for construction unless noted below as "Issuance: For Construction" 6. All work is to be carried out in conformance with the Code and Bylaws of the authorities having jurisdiction. 7. The Architect of these plans and specifications gives no warranty or representation to any party about the constructability of the building(s) represented by them. All contractors or subcontractors must satisfy RETAIL FOR LEASE themselves when bidding and at all times ensure that they can properly construct the work represented by these plans. © architectsAlliance, 2017 NO ISSUANCE DATE 1 RE-ZONING APPLICATION OCTOBER 2nd, 2015 2 RE-ZONING RE-SUBMISSION JULY 20th, 2016 3 ISSUED FOR SITE PLAN APPLICATION DEC 5th, 2016 sixty 4 RE-ZONING RE-SUBMISSION FEBRUARY 2nd, 2017 5 REISSUED FOR SITE PLAN APPLICATION JUNE 5th, 2017 6 REISSUED FOR SITE PLAN APPLICATION OCTOBER 30th, 2017 shuter 7 REISSUED FOR SITE PLAN APPLICATION MARCH 1st, 2018 GENERAL NOTES: THE OWNER BE ADVISED THAT SHOULD ANY PARTY, INCLUDING THE CURRENT OR ANY SUBSEQUENT OWNER, APPLY FOR MORE THAN ONE CONDOMINIUM CORPORATION ENCOMPASSING ANY OR ALL OF THIS DEVELOPMENT OR MAKE AN APPLICATION THAT RESULTS IN A LAND DIVISION, STAFF MAY REQUIRE LEGAL ASSURANCES, INCLUDING BUT NOT LIMITED TO EASEMENTS, WITH RESPECT TO THE APPROVED SERVICES. SUCH ASSURANCES WILL BE DETERMINED AT THE TIME OF APPLICATION FOR CONDOMINIUM APPROVAL. ALL ELEVATIONS OF GEODETIC ORIGIN ARE REFERRED TO VERTICAL DATUM CGVD2013, TO CONVERT TO CITY OF TORONTO CGVD1928 pre 1978, ADD 0.52 Metres TO DATUM. ALL PARAPETS AND ALL EXTERNAL STRUCTURES TO COMPLY WITH ONTARIO REGULATION (O. REG.) 114/16 AND SPECIFICALLY TO BE BELOW OBSTACLE LIMITATION SURFACES (OLS) AS IDENTIFIED BY THE REGULATION FOR ST. MICHAEL'S HOSPITAL HELIPORT 8 1 0 2 , 6 1 h c r a M , CHURCH ST. LOOKING SOUTH EAST SHUTER ST. LOOKING NORTH y a d i r F CBRE LIMITED, REAL ESTATE BROKERAGE | 145 KING STREET WEST | SUITE 1100 | TORONTO, ON M5H 1J8 | 416 362 2244 | WWW.CBRE.CA : n O d e t n i r P aA architectsAlliance 205-317 Adelaide St. West Toronto, Ontario M5V 1P9 t 416 593 6500 f 416 593 4911 info: architectsalliance.com MENKES 189 Church Street Inc. 1 0 _ r e t 60 SHUTER STREET u h S s e k n e M / SHUTER ST. & DALHOUSIE ST. DALHOUSIE ST. LOOKING SOUTH WEST s e k n e M r e t u h S 0 6 / 1 2 r Renderings e v r e S M I B - 1 l l a b e c 2016-12-05 a p S : r e v r e S M I B A-0.02 1. Copyright of this drawing is reserved by the Architect. The drawing and all associated documents are an instrument of service by the Architect. The drawing and the information contained therein may not be reproduced in whole or in part without prior written permission of the Architect. 2. These Contract Documents are the property of the Architect. The Architect bears no responsibility for the interpretation of these documents by the Contractor. Upon written application, the Architect will provide written/graphic clarification or supplementary information regarding the intent of the Contract Documents. The Architect will review Shop Drawings submitted by the Contractor for design conformance only. 3. Drawings are not to be scaled for construction. The Contractor is to verify all existing conditions and dimensions required to perform the work and report any discrepancies with the Contract Documents to the Architect before commencing any work. 4. Positions of exposed finished mechanical or electrical devices, fittings, and fixtures are indicated on architectural drawings. The locations shown on the architectural drawings govern over the Mechanical and Electrical drawings. Those items not clearly located will be located as directed by the Architect. 5. These drawings are not to be used for construction unless noted below as "Issuance: For Construction" 6. All work is to be carried out in conformance with the Code and Bylaws of the authorities having jurisdiction. 7. The Architect of these plans and specifications gives no warranty or representation to any party about the constructability of the building(s) represented by them. All contractors or subcontractors must satisfy themselves when bidding and at all times ensure that they can properly construct the work represented by these plans. © architectsAlliance, 2017 NO ISSUANCE DATE 1 RE-ZONING APPLICATION OCTOBER 2nd, 2015 2 RE-ZONING RE-SUBMISSION JULY 20th, 2016 sixty 3 ISSUED FOR SITE PLAN APPLICATION DEC 5th, 2016 4 RE-ZONING RE-SUBMISSION FEBRUARY 2nd, 2017 5 REISSUED FOR SITE PLAN APPLICATION JUNE 5th, 2017 shuter 6 REISSUED FOR SITE PLAN APPLICATION OCTOBER 30th, 2017 7 REISSUED FOR SITE PLAN APPLICATION MARCH 1st, 2018 CENTRALLY LOCATED BETWEEN THE EATON CENTRE & RYERSON UNIVERSITY GENERAL NOTES: THE OWNER BE ADVISED THAT SHOULD ANY PARTY, INCLUDING THE CURRENT OR ANY SUBSEQUENT OWNER, APPLY FOR MORE THAN ONE CONDOMINIUM CORPORATION ENCOMPASSING ANY OR ALL OF THIS DEVELOPMENT OR MAKE AN APPLICATION THAT RESULTS IN A LAND DIVISION, STAFF MAY REQUIRE LEGAL ASSURANCES, INCLUDING BUT NOT LIMITED TO EASEMENTS, WITH RESPECT TO THE APPROVED SERVICES. SUCH ASSURANCES WILL BE DETERMINED AT THE TIME OF APPLICATION FOR CONDOMINIUM APPROVAL. ALL ELEVATIONS OF GEODETIC ORIGIN ARE REFERRED TO VERTICAL DATUM CGVD2013, TO CONVERT TO CITY OF TORONTO CGVD1928 pre 1978, ADD 0.52 Metres TO DATUM. ALL PARAPETS AND ALL EXTERNAL STRUCTURES TO COMPLY WITH ONTARIO REGULATION (O. REG.) 114/16 AND SPECIFICALLY TO BE BELOW OBSTACLE LIMITATION SURFACES (OLS) AS IDENTIFIED BY THE REGULATION FOR ST. MICHAEL'S HOSPITAL HELIPORT 8 1 0 2 , 6 1 h c r a M , CHURCH ST. LOOKING SOUTH EAST SHUTER ST. LOOKING NORTH y a d i r F : n O d e t n i r P aA architectsAlliance 205-317 Adelaide St. West Toronto, Ontario M5V 1P9 t 416 593 6500 f 416 593 4911 info: architectsalliance.com MENKES 189 Church Street Inc. 1 0 _ r e t 60 SHUTER STREET u h S s e k n e M / SHUTER ST. & DALHOUSIE ST. DALHOUSIE ST. LOOKING SOUTH WEST s e k n e M r e t u h S 0 6 / 1 2 r Renderings e v r e S M I B - 1 l l a b e c 2016-12-05 a p S : r e v r e S M I B A-0.02 1. Copyright of this drawing is reserved by the Architect. The drawing and all associated documents are an instrument of service by the Architect. The drawing and the information contained therein may not be reproduced in whole or in part without prior written permission of the Architect. 2. These Contract Documents are the property of the Architect. The Architect bears no responsibility for the interpretation of these documents by the Contractor. Upon written application, the Architect will provide written/graphic clarification or supplementary information regarding the intent of the Contract Documents. The Architect will review Shop Drawings submitted by the Contractor for design conformance only. 3. Drawings are not to be scaled for construction. The Contractor is to verify all existing conditions and dimensions required to perform the work and report any discrepancies with the Contract Documents to the Architect before commencing any work. 4. Positions of exposed finished mechanical or electrical devices, fittings, and fixtures are indicated on architectural drawings. The locations shown on the architectural drawings govern over the Mechanical and Electrical drawings. Those items not clearly located will be located as directed by the Architect. 5. These drawings are not to be used for construction unless noted below as "Issuance: For Construction" 6. All work is to be carried out in conformance with the Code and Bylaws of the authorities having jurisdiction. 7. The Architect of these plans and specifications gives no warranty or representation to any party about the constructability of the building(s) represented by them. All contractors or subcontractors must satisfy themselves when bidding and at all times ensure that they can properly construct the work represented by these plans. © architectsAlliance, 2017 NO ISSUANCE DATE 1 RE-ZONING APPLICATION OCTOBER 2nd, 2015 2 RE-ZONING RE-SUBMISSION JULY 20th, 2016 RETAIL3 ISSU EFORD FOR SITE PLLEASEAN APPLICATION DEC 5th, 2016 4 RE-ZONING RE-SUBMISSION FEBRUARY 2nd, 2017 5 REISSUED FOR SITE PLAN APPLICATION JUNE 5th, 2017 Unit 1: 2,832 sq. ft. 6 REISSUED FOR SITE PLAN APPLICATION OCTOBER 30th, 2017 Unit 2: 1,306 sq.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages10 Page
-
File Size-