North Subregional Transport Plan Poster 2014 Update

North Subregional Transport Plan Poster 2014 Update

North London Sub-Regional Transport Plan: addressing the challenges 2014 update Cheshunt Who lives and works in the North London sub-region? What was delivered in 2013/14? to Broxbourne What is committed? The north London sub-region, represented via North London A1(M) Cheshunt Strategic Alliance (NLSA), consists of the boroughs of Barnet, HERTFORDSHIRE Enfield, Haringey and Waltham Forest. 1 Track and platform improvements between Finsbury Park and Upper Lee Valley Opportunity Area 4 Crossrail (2018) Alexandra Palace stations to improve capacity and rail service reliability Bus priority 5 Devolution of West Anglia suburban services (2015) Theobalds 22 opportunities at bus 15,000 jobs/15,700 homes 2 Eastway bridge two-way for buses connecting Hard shoulder Grove 6 Improvements to the reliability and frequencyM25 of pinch point locations and within TfL is working with Network Rail and Hackney with Stratford City Potters Bar 28 running Great Northern suburban services (2019) Population Jobs Households junction 24 opportunity and growth areas others in order to deliver 4 tracking of the 3 LAMILO Consolidation Centre M25 Waltham Abbey 1.2m (2011) 390,000 (2011) 460,000 (2011) West Anglia Main Line. At a more local 7 Completion of the Thameslink Programme (2018) junction 25 Waltham Cross 1.4m by 2031 430,000 by 2031 570,000 by 2031 Major borough LIP and TfL schemes level, TfL is working with boroughs in order junction 23 M25 junction8 26 Stratford to Upper Lee Valley rail enhancements A Forest Road safety scheme to understand and deliver improvementsM25 providing a four train per hour service (2017-2018) How people travel in the North London sub-region? to meet transport challenges in Tottenham junction 27 B Improvements to the Bakers Arms shopping area 38 Hale, Northumberland Park, Meridian 9 36 train per hour frequency on the Victoria line delivering significant C Junction and paving works at Lea Bridge Road / Argall Way A1 Water and Northeast Enfield. capacity enhancements north of Seven Sisters (2016/2017) 2% in preparation for the reopening of Lea Bridge Station 30% 10 Night Tube service at weekends on the Northern, D Reconstruction of the Willesden Junction station approach A10 Contactless Turkey Street Piccadilly, Victoria, Central and Jubilee lines (2015) 1% 6% 16 payment Enfield Lock expanded to the DLR, London 11 Northern line frequency enhancements 45% Transforming the role of cycling Delivering the vision for Overground, trams and Tube 15% 12 Step free access stations The Mayor’s Vision for Cycling London’s streets and roads 13 Seven Sisters station rail capacity interchange enhancements (2014) 1% sets out the plan to invest The Roads Task Force (RTF) 14 Tottenham Hale station upgrade, gyratory removal Londoners’ mode share by sub-region of trip origin, average day in an extensive network of report, 2013 sets out a vision Improved local cycle routes, including Cycle of how London can cope with 34 and public realm improvements (2016) (seven-day week), LTDS 2012/13 Borehamwood bus services Superhighways and Quietways, major population growth and 15 Angel Road station upgrade (2017) Killed or seriously injured casualties for all modes in 2013 – to allow simpler and safer access remain one of the most vibrant, 24 Brimsdown north sub-region Promotion and support 16 Contactless payment expanded to the DLR, to and around London. accessible and attractive world 35 Enfield Town Bus or Other cities. of public transport Cockfosters Enfield Chase London Overground, trams and Tube 4% vehicle occupants North London partners have and sustainable travel coach occupants 4% 17 Direct link between HackneyLoughton Downs and also recognised theElstree importance & TfL is working with London’s highlighting the opportunities Southbury High Barnet Meridian Water – Meridian Hackney Central stations (2015) of partnership workingBorehamwood to boroughs to take forward the provided by existing orbital bus Oakwood H Car occupants 21% 38% Pedestrians encourage cycling and, with RTF recommendations related Water is one of the key Barnetroutes and their connections with rail Night Tube 18 Direct link between Walthamstow Central support from TfL, have to strategic studies of the Inner regenerationPonders End and investment and Tube services. 10 service at and Queens Road stations (2014) produced a North London Ring Road, freight vehicles, travel Bush Hill Park opportunities in north London. Powered two-wheeler 17% weekends on the Northern, 19 Electrification of the Gospel Oak to BarkingM11 line 16% Pedal cyclists Cycling Strategy. The Strategy demand management measures, The £1.3bn redevelopment of Piccadilly, Victoria, Central and the addition of 4-car carriages is now being taken forward with and RTF street-types. Northern line this area of under-used land A1 11 and Jubilee lines (2015) ENFIELD in Enfield will create a new Chingford early priorities including mapping frequency 20 New Lea Bridge station (2014) the provision of cycling facilities enhancements neighbourhood of up to 5,000 Challenges and priority work areas 21 Train lengthening to five cars on London Overground (2015) and the potential for joining up Southgate 3 homes and businesses and Challenges in every sub-region schemes. Totteridge & 6 deliver up to 3,000 new jobs by 22 Bus priority opportunities at bus pinch point locations Whetstone M1 East Barnet 2026. Master plan launched and and within opportunity and growth areas Improve air quality to meet and exceed legal adopted in summer 2013. requirements and ensure health benefits for Londoners Edmonton 23 Implementation of the Mayor’s Vision for Cycling A41 Edmonton Eco Park – The Greensite, run A10by London Waste, is being 24 Transform the role of cycling and walking in the sub-region Mini-Holland Borough used for trials along the River Chigwell Palmers Green 25 Stoke Newington gyratory improvements for pedestrians and cyclists Meet CO targets Lee Navigation for transporting 2 Stanmore Mill Hill East Area for Intensification Arnos Grove Edmonton materials to the incinerator. Pedestrianisation of Hackney Central high street Silver Street 26 North London-specific challenges 500 jobs/2,000 homes Future Tube upgrades: A406 Angel 27 20 Extended 20 mph speed limits in Waltham Forest BARNET A406 Road Facilitate and respond to growth, especially in Brent Edgware Mill Hill Broadway 32 New 2020/30s Southgate Woodford28 Hard shoulder running on junctions 23-27 of the M25 (2015) Cross/Cricklewood and the Upper Lee Valley Bounds 15 Highams Park Completion of the Thameslink including the Piccadilly, CentralGreen 7 Friern Barnet Major borough LIP and TfL schemes Relieve crowding on the public transport network Programme (2018) and Bakerloo lines. A1 Devolution of West Anglia E Cricklewood / Brent Cross major scheme including redesigned M1/A406 Mill Hill White Hart Lane 5 Manage highway congestion and make more East suburban services (2015) junction, new bridges to enhance local connectivity, a new Thameslink efficient use of the road network Thameslink programme A406 station and bus network enhancements (provisional date 2020-2021) 37 A10(T) 31 The Thameslink programme Finchley Wood Green 27 F Harlesden gyratoryM11 removal and public realm enhancements (2015) Enhance connectivity and the attractiveness Central Alexandra of orbital public transport will transform north-south Palace J G Major streetscape works along Walthamstow High Street between the travel through London by Finchley WALTHAM 20 Colindale A503 Town Centre Gardens and Hoe Street (2014) Improve access to key locations and jobs and services Colindale and Burnt Oak Opportunity Area Bruce providing service between 1 Grove FOREST H Public realm improvements at Ponders End Henly’s A406 Enhancements at strategic radial/ 14 more stations without requiring 2,000 jobs/12,500 homes HaringeyTurnpike Lane Heartlands/Wood Green A REDBRIDGE What are the priority work areas? A1 Corner 33 orbital rail and bus interchanges Tottenham G I Improved transport links and urban realm in West Hendon passengers to change trains in Hale A1400 TfL is continuing to assess the impact of such as Seven Sisters and South Tottenham 2,000 jobs/1,000 homes 24 J Transformational town centre scheme at Wood Green (2015) • A406 North Circular road study, including London. New, longer and more Wood growth on future station capacity. Tottenham Walthamstow K Seven Sisters Road - Woodbury Down road improvement scheme long term options such as grade separation in order to frequent trains will enter service Blackhorse Street A406 between 2015 and 2018. Hornsey Seven Road resolve safeguarding of land 13 Sisters 20 St James 18 36 Street • A5 road study, identifying and agreeing measures to improve A1 HARINGEY Future opportunities TravelKingsbury in South B the road Hendon Tottenham A12 London 6, 2013 Brent Cross Cricklewood Opportunity Area 8 29 Crossrail 2 (2030) • A10/A10/A1055 corridor study, including rail investment, E Brent Cross Implementation of the 9 I 23 Wanstead Crossrail 2, a review of highway access to the M25 and Travel in London Mayor’s Vision for Cycling Stamford 30 High Speed 2 (2026) Preston M1 20,000 jobs/10,000 homes summarises trends Golders Green Hill options for Stoke Newington gyratory Road A406 Manor Coppermill A104 31 West Anglia Main Line four-tracking along the Lee Valley main line, relating to travel Major scheme including redesigned M1/ K House A10(T) Junction Leytonstone • Development and implementation of cycling strategy for 20 supporting the delivery of the Regional alignment of Crossrail 2 and

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    1 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us