FORM – IA Development of “Bengaluru Signature Business Park”

FORM – IA Development of “Bengaluru Signature Business Park”

FORM – IA For Development of “Bengaluru Signature Business Park” By KARNATAKA STATE INDUSTRIAL AND INFRASTRUCTURE DEVELOPMENT CORPORATION (KSIIDC) (A Government of Karnataka Undertaking) At Devanahalli, Bengaluru Rural District, Karnataka. January– 2018 PROJECT PROPONENT ENVIRONMENTAL CONSULTANT KARNATAKA STATE INDUSTRIAL B.S. ENVI-TECH PVT. LTD., AND INFRASTRUCTURE Secunderabad, Telangana. DEVELOPMENT CORPORATION NABET Accreditation: NABET/EIA/1316/RA002 (KSIIDC)Bengaluru. APPENDIX II (See paragraph 6) FORM-1 A (Only for construction projects listed under item 8 of the Schedule) CHECK LIST OF ENVIRONMENTAL IMPACTS (Project proponents are required to provide full information and wherever necessary attach explanatory notes with the Form and submit along with proposed environmental management plan & monitoring programme) 1. LAND ENVIRONMENT 1.0 (Attach panoramic view of the Photographs as Annexure - 1 project site and the vicinity) 1.1. Will the existing landuse get Karnataka State Industrial and significantly altered from the Infrastructure Development project that is not consistent with Corporation Limited (KSIIDC) the surroundings? (Proposed proposes to develop a state of art landuse must conform to the Bengaluru Signature Business approved Master Plan / Park Project with the following Development Plan of the area. facilities in an area of 407.08 Change of landuse if any and the acres, Devanahalli, Bengaluru statutory approval from the District, Karnataka. competent authority are Total developable land is about submitted). 247.13 acres with a built-up area of about 28,62,904 Sqm. The trunk infrastructure will be developed in an area of 159.96 acres. The proposed development is as per the permissible land use of Bengaluru International Airport Area Planning Authority (BIAAPA) Masterplan. The proposed development comprises: a. Business District comprising Corporate Offices, Parks, Mall & Multiplex, Premium Corporate Parks and Club b. MICE & Retail District comprising 2 BengaluruInternational Convention Center c. Design & Culture District comprising, Media Center & Offices, Arts&Crafts Center, Cultural Museum, Design Experience Center/Product Experience & Launching Center d. Innovation and Research District comprising R&D Centers, Center of Excellence /Incubation Center, Office Buildings. e. Other office buildings comprising business offices and some public offices All the proposed developments are within the permissible developments as per the BIAAPA Master Plan Attach Maps of Maps for the Annexures (i) Site location, proposed project (ii) Surrounding features of site Location Map Annexure 2 the proposed site (within BIAAPA Master Annexure 2A 500 meters) Plan (iii) The site (indicating levels Contour plan Annexure 3 & contours) to Google Earth Annexure 4 Imagery appropriate scales. If not available attach only conceptual plans. 1.2. List out all the major project The salient features of the requirements in terms of the land proposed project are givenin area, built up area, water Annexure–5and the Master plan of consumption, power requirement, the proposed development is given connectivity, community facilities, as Annexure - 6 parking needs etc. 3 1.3. What are the likely impacts of the The proposed project willhave proposed activity on the existing minor impacts on the surroundings facilities adjacent to the proposed which is limited to the construction site? (Such as open spaces, phase only. The site will be properly community facilities, details of the barricaded to prevent fugitive dust existing landuse, disturbance to emission during the construction the local ecology). period. The vehicular movement will be regulated to minimize the impact on traffic. 1.4. Will there be any significant land No major land disturbance is disturbance resulting in erosion, envisaged. Details if any will be subsidence & instability? furnished in the EIA report (Details of soil type, slope analysis, vulnerability to subsidence, seismicity etc may be given). 1.5. Will the proposal involve alteration There will be no alteration of of natural drainage systems? (Give natural drainage system. A proper details on a contour map showing storm water management and rain the natural drainage near the water harvesting will be proposed project site) implemented. 1.6. What are the quantities of Details will be furnished in EIA. earthwork involved in the construction activity-cutting, filling, reclamation etc. (Give details of the quantities of earthwork involved, transport of fill materials from outside the site etc) 1.7. Give details regarding water BWSSB will supply Cauvery supply, waste handling etc during treated water for potable purpose the construction period. and KIADB will supply treated waste water for non-potable purposes. Details will be furnished in EIA. 1.8. Will the low-lying areas & wetlands None. get altered? (Provide details of how low lying and wetlands are getting modified from the proposed activity) 1.9. Whether construction debris & Construction debris will be waste during construction cause collected and suitably utilized on health hazard? (Give quantities of site as per construction waste 4 various types of wastes generated management plan. during construction including the construction labour and the Stacking and disposal of such means of disposal) material will be such that it will not disturb the surrounding land use. Maximum reuse of construction waste on site and removal of non- reusable waste from the site and proper disposal is proposed, which would reduce the impact significantly. 2. WATER ENVIRONMENT 2.1. Give the total quantity of water The estimated total water requirement for the proposed requirement is 21,800 m3/day. project with the breakup of Detailed water balance and waste requirements for various uses. How treated waste water usage will be will the water requirement met? furnished in EIA. State the sources & quantities and furnish a water balance statement. 2.2. What is the capacity (dependable BWSSB will supply Cauvery flow or yield) of the proposed source treated water for potable purpose of water? and KIADB will supply treated waste water for non-potable purposes. Details will be furnished in EIA. 2.3. What is the quality of water Not Applicable. required, in case, the supply is not from a municipal source? (Provide physical, chemical, biological characteristics with class of water quality) 2.4. How much of the water Wastewater will be treated in STP. requirement can be met from the Treated wastewater will be reused for recycling of treated wastewater? non-potable uses like flushing of (Give the details of quantities, toilets, greenbelt, and makeup sources and usage) water for HVAC Cooling towers. Details will be furnished in EIA 5 2.5. Will there be diversion of water No from other users? (Please assess the impacts of the project on other existing uses and quantities of consumption) 2.6. What is theincremental pollution There is no incremental pollution load from wastewater generated load from wastewater generated from the proposed activity? (Give since the treated waste water is details of the quantities and reused for non-potable purposes composition of wastewater within the project. Details will be generated from the proposed furnished in EIA activity) 2.7. Give details of the water The rain water harvesting of the requirements met from water entire plot area as well as harvesting? Furnish details of the individual buildings has been facilities created. envisaged. Details will be furnished in EIA 2.8. What would be the impact of the There will be no adverse impact on land use changes occurring due to the land use changes envisaged the proposed project on the runoff since there is no disturbance of the characteristics (quantitative as well existing natural nalas or streams. as qualitative) of the area in the There would not be any water post construction phase on a long- logging or flooding due to the term basis? Would it aggravate the proposed project as the project problems of flooding or water proponent proposes to implement logging in any way? a detailed storm water management plan. 2.9. What are the impacts of the There will not be any impact on proposal on the ground water? (Will ground water since no ground there be tapping of ground water; water is proposed to be tapped. give the details of ground water BWSSB will supply Cauvery table, recharging capacity, and treated water for potable purpose approvals obtained from competent and KIADB will supply treated authority, if any) waste water for non-potable purposes like greenbelt development, flushing and make- up water for HVAC. Rainwater harvesting provision has been made for recharge of groundwater and will have beneficial impact on the 6 groundwater resources. Details will be furnished in EIA 2.10. What precautions/measures are The runoff from the construction taken to prevent the run-off from activities will be contained within construction activities polluting the project site.No runoff will be land & aquifers? (Give details of disposed outside the project quantities and the measures taken boundary. to avoid the adverse impacts) 2.11. How is the storm water from within Roof water from the project site the site managed?(State the and individual buildings shall be provisions made to avoid flooding of collected. Details will be furnished the area, details of the drainage in EIA. facilities provided along with a site layout indication contour levels). 2.12. Will the deployment of construction No. Local labour will be hired labourers particularly

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    24 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us