Final Feasibility Study For

Final Feasibility Study For

Prepared For: TCE RI/FS Coordinator Final TRICHLOROETHENE FEASIBILITY STUDY REPORT Former WACS Site / Joe Parent Vocational Education Center Aniak, Alaska Prepared By: 4101 Arctic Blvd., Suite 206 Anchorage, Alaska 99503 Geosyntec Project Number: PNG0712 March 2019 Final TRICHLOROETHENE FEASIBILITY STUDY REPORT Former WACS Site / Joe Parent Vocational Education Center Aniak, Alaska Prepared By: Geosyntec Consultants, Inc. 4101 Arctic Blvd., Suite 206 Anchorage, Alaska 99503 Ben Martich Bruce Marvin Principal Senior Principal Geosyntec Project Number: PNG0712 March 2019 TABLE OF CONTENTS EXECUTIVE SUMMARY .......................................................................................................... VI 1. INTRODUCTION .................................................................................................................... 1 1.1 Purpose and Objectives ....................................................................................................... 1 1.2 Regulatory Framework ....................................................................................................... 1 1.3 Organization of Report ....................................................................................................... 2 2. BACKGROUND INFORMATION ......................................................................................... 3 2.1 Site Location and Surroundings .......................................................................................... 3 2.2 Site Use ............................................................................................................................... 3 2.3 Investigation History ........................................................................................................... 4 2.4 Constituents of Potential Concern ...................................................................................... 5 2.5 Previous and Ongoing Remedial Activities ........................................................................ 5 2.5.1 Previous Remedial Studies and Activities .............................................................. 5 2.5.2 Ongoing and Planned Remedial Activities ............................................................. 8 2.6 Conceptual Site Model Overview ....................................................................................... 8 2.6.1 Geology and Hydrogeology .................................................................................... 8 2.6.2 TCE Sources ........................................................................................................... 9 2.6.3 Nature and Extent of TCE and Breakdown Products ........................................... 10 2.6.4 Fate and Transport of TCE ................................................................................... 13 2.6.5 Potential Exposure Pathways ................................................................................ 14 3. REGULATORY REQUIREMENTS AND REMEDIAL ACTION OBJECTIVES.............. 16 3.1 Applicable Requirements .................................................................................................. 16 3.2 Remedial Action Objectives ............................................................................................. 16 3.3 Target Areas for Remedial Response Actions .................................................................. 17 4. TECHNOLOGY IDENTIFICATION AND SCREENING ................................................... 18 4.1 Remedial Technologies ..................................................................................................... 18 4.2 Screening Criteria ............................................................................................................. 18 4.2.1 Effectiveness ......................................................................................................... 18 4.2.2 Implementability ................................................................................................... 19 4.2.3 Cost ....................................................................................................................... 19 4.3 Screening Results .............................................................................................................. 19 5. REMEDIAL RESPONSE ACTION ALTERNATIVES DEVELOPMENT AND EVALUATION....................................................................................................................... 21 Final FS Report i March 2019 5.1 Remedial Alternatives Development ................................................................................ 21 5.2 Alternatives Descriptions .................................................................................................. 21 5.2.1 Alternative 1 – No Action ..................................................................................... 22 5.2.2 Alternative 2 – Institutional Controls and Engineering Controls ......................... 22 5.2.3 Alternative 3 – Targeted Soil Vapor Extraction with ICs and ECs ...................... 23 5.2.4 Alternative 4 – Long-Term Groundwater Monitoring with ICs and ECs ............. 25 5.2.5 Alternative 5 – Targeted SVE and LTGM with Limited ICs and ECs ................. 25 5.2.6 Alternative 6 – Excavation and LTGM with Limited ICs and ECs ...................... 26 5.3 Alternatives Evaluation ..................................................................................................... 27 5.3.1 Evaluation Criteria ................................................................................................ 27 5.3.2 Comparative Discussion of Alternatives .............................................................. 28 6. RECOMMENDED REMEDIAL ALTERNATIVE ............................................................... 31 7. CONCLUSIONS..................................................................................................................... 32 8. REFERENCES ....................................................................................................................... 33 LIST OF TABLES – IN TEXT Table 4-1: List of Potential Remedial Technologies .................................................................... 18 LIST OF TABLES – APPENDED Table 1 Default Remedial Action Cleanup and Target Levels Table 2 TCE Mass Estimates by Geologic Unit Table 3 Technology Screening Table 4 Remedial Alternatives Evaluation Final FS Report ii March 2019 LIST OF FIGURES – APPENDED Figure 1 Site Location Figure 2 Site Vicinity Figure 3 1959 Aerial Photograph Figure 4 Extent of Removal Actions Figure 5 Plan View of Cross Sections Figure 5A Cross Section A-A’ Figure 5B Cross Section B-B’ Figure 5C Cross Section C-C’ Figure 5D Cross Section D-D’ Figure 5E Cross Section E-E’ Figure 6 Extent of TCE in Gravel Fill Layer Figure 7 Extent of TCE in Fine Silt Layer Figure 8 Extent of TCE in Groundwater Figure 9 Extent of TCE in Soil Figure 10 Unsaturated Zone – Institutional and Engineering Controls Figure 11 Saturated Zone – Institutional and Engineering Controls Figure 12 Unsaturated Zone – Targeted SVE with Institutional and Engineering Controls Figure 13 Saturated Zone – LTGM with Institutional and Engineering Controls Figure 14 Unsaturated Zone – Excavation with Institutional and Engineering Controls LIST OF CHARTS – APPENDED Chart 1 Alternatives Cost Comparison LIST OF APPENDICES Appendix A Spring 2018 Groundwater Monitoring Appendix B Remedial Response Action Alternatives Cost Estimates Appendix C Response to Comments Final FS Report iii March 2019 LIST OF ACRONYMS AND ABBREVIATIONS µg/kg ..........................micrograms per kilogram µg/L ............................micrograms per liter µg/m3 ..........................micrograms per cubic meter AAC ...........................Alaska Administrative Code ADEC .........................Alaska Department of Environmental Conservation ADOT&PF .................Alaska Department of Transportation & Public Facilities bgs ..............................below ground surface CD ..............................Consent Decree cDCE ..........................cis-1,2-dichloroethene CERCLA ....................Comprehensive Environmental Response, Compensation, and Liability Act COPC .........................constituent of potential concern CSM ...........................conceptual site model E&E............................Ecology and Environment, Inc. ECs .............................engineering controls FS ...............................feasibility study Geosyntec ...................Geosyntec Consultants, Inc. ICs ..............................institutional controls JPVEC ........................Joe Parent Vocational Education Center KSD............................Kuspuk School District LTGM ........................long-term groundwater monitoring mg/kg .........................milligrams per kilogram NAVD88 ....................North American Vertical Datum of 1988 NCP ............................National Contingency Plan O&M ..........................operations and maintenance OASIS ........................OASIS Environmental, Inc. PCBs ..........................polychlorinated biphenyls PCE ............................tetrachloroethene RAOs..........................remedial action objectives RI Report ....................Trichloroethene Remedial Investigation Report RI................................remedial investigation RI/FS Work Plan ........Trichloroethene Remedial Investigation and Feasibility Study Work Plan ROI .............................radius of influence Final FS Report

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    178 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us