World Bank Document

World Bank Document

E999 VOL. 4 World bankl; (ian Public Disclosure Authorized I'. Ninabo City Water Environment Constructioln Project by Utilizing World Bank- Loan Ningbo City Zhougonigzhai (Jiaokou) Reservoir Water Diversion and Urban Water Supply Ring Netvork Sub-Project Environmental Impact Report Public Disclosure Authorized (For Approval) Public Disclosure Authorized Chiniese Research Academyv of Environmental Sciences Public Disclosure Authorized k I I I I I I I I I World bank loan Ningbo City Water Environment Construction Project by Utilizing World Bank Loan Ningbo City Zhougongzhai (Jiaokou) Reservoir Water Diversion and Urban Water Supply Ring Network Sub-Project Environmental Impact Report (For Approval) Chinese Research Academy of Environmental Sciences November 2004 -~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ Name of project: Ningbo City Water Environment Construction Project by Utilizing World Bank Loan Network Ningbo City Zhougongzhai (Jiaokou) Reservoir Water Diversion and Urban Water Supply Ring Sub-Project Environmental assessment document: Environmental Impact Report (for approval) Client: Ningbo Water Supply Company Assessment organization: Environmental Impact Assessment Center of Chinese Research Academy of Environmental Sciences Environmental impact assessment certificate: GHPZJZ No.1001 President and legal representative: Meng Wei (Researcher) Specialized environmental assessment agency:Environmental Impact Assessment Center of Chinese Research Academy of Environmental Sciences Person in charge of the project: Liu Xiaoyu (Senior Engineer), Chinese Research Academy of Environmental Sciences Bao Weihong (Senior Engineer), Ningbo Environmental Protection Science Research & Design Institute Person in charge of technology: Shu Jianmin (Researcher) Technical examination: Li Yanwu (Associate Researcher) Cooperation organization:Ningbo Environmental Protection Science Research & Design Institute Environmental impact assessment certificate: GHPZJZ No.2004 I Major Participants and Qualifications Assessment Name Discipline Job title Work permit No. organization 5 . ~~~~Environmental Liu Xiaoyu Senior Engineer A10010040 ______________ engineenng Environmental > JiannrinShu t Researcher A10010021 cn> engineering Associate Zhang Linbo ecology A 10010026 researcher 4 Li. Xi. ochun Environmental Associate o Liu Xiaochun A10010063 E3 assessment researcher Environmental Bao Weihong Engineer A20040003 assessment Environmental Bi Yulong Senior engineer A20040006 engineenng . tl ,, Environmental Luo Deyu Engineer A20040016 * eo . assessment >. - Environmental Song Xianying Engineer A20040013 engineenng M0 I I I I i I i I ------- - 1.0 General - - --------------------------------------------------------- 1.1 Construction background and project origin----------------------------------------------------------------- 1.2 Project undertaker and necessity and significance of project construction---- 3 1.2.1 Project undertaker ---------------- - ------- ------ -- --- ---- -- 1.2.2 Significance and necessity of project construction-------------------------3 6 1.3 Policy, laws and regulations and institutional framework------ -------------------------------------------- 6 1.3.1 Domestic environmental assessment procedure -------- ---------------- 1.3.2 Safeguard policy of World Bank---------------------------------------------------------- 9 1.3.3 Related international environmental treaties to and on which China has acceded to or signed ------- 1.4 Basis of preparation---------------------------------- ----------- 11 1.5 Assessment grade and scope ------------------------------------------------------------------- 1 1.5.1 Assessment grade ------------------------------------------------------------------ 12 1.5.2 Assessment range ---------------------- ------------ 13 1.6 Assessment standard ------ - - ----------------------------- 13 1.6.1 Environmental quality standard--- ------------------------------------------------ 15 1.6.2 Discharge standard of pollutants -------------------- ---------------------- 16 I .7Pollution control and environmental protection objective ----------------------- 16 1.7.1 Pollution control and environmental protection objective ------------- ---- ----- 16 1.7.2 Water environment function division and major environmentally sensitive points 18 1.8 Major technologies and methods adopted in the assessment -------------------------------- 19 1.9 Brief introduction of environmental assessment work group----- ------------------------- 19 1.9.1 Project organization structure----------------------------------- --------- ------ 19 1.9.2 Brief introduction of environmental assessment organization - ------- - ----- 21 2.0 General situation of loan project ------------------------------------------------------------------------------------ 21 2.1 Brief introduction of loan project and project composition ----------------------- 22 2.2 Project scale and construction objective ----- -- ------- -22 2.2.1 Supply and demand balance plan--- - - - 23 2.2.2 Project scale--- ------------- ----------------------------------- 23 2.2.3 Construction objective --------------------------------------------------------- 24 2.3 Project content, process flow and main technical indices ------------------------------ 24 2.3.1 Raw water catchment project-water catchment tower ------------------------------ 25 2.3.2 Raw water conveyance work --------------------------------- 26 2.3.3 Water purification plant work-------- ------------------------------------- 32 2.3.4 Clean water conveyance main pipe ------------------------- ------- 32 2.3.5 Urban water distribution ring network - ------------- --------------- 33 2.4 Construction method and construction plan -------------------- ------------------- 2.4.1 Construction condition------------------------------------------------ 33 2.4.2 Construction plan --------------- -- --------------- ---- 35 36 2.4.3 Construction method------------------------------------------------------------------------------------------------ 44 2.5 Project pollution sources and discharge of pollutants--------------------------------- ----------------- 44 2.5.1 Raw water catchment and conveyance work --------------------------------------- ------------- 45 2.5.2 Water purification plant project --------------------------------------------------------------------------------- 2.5.3 Clean water conveyance main pipe project and urban water distribution ring network project-------- 46 3.0 General situation of regional environment for the loan project -------------------------------------------------- 48 48 3.1 Natural environmental condition ------------------------------------------------------------------------------- 48 3.1.1 Geographical location-------------------------------------------------------------------------------------------- 48 3.1 .2 Landforrn and geomorphy- - ---------------------------------------------------------------------------------------- 3.1.3 Engineering geological condition -------------------------------------------- 49 3.1.4 Earthquake ----------------------------------------------------------------- - -49 49 3.1.5 Climate and weather -------------------------------------------------------------- 50 3 .6 General situation of river water system ---------------------------------------------------------------------------- 3.1.7 Water development within the basin------------------55 3.1.8 Water resource demonstration of Zhougongzhai and Jiaokou Reservoir Water Diversion Project ----- 56 3.2 Overview of social enviroment ------------------ --------------------------- 73 3.2.1 Administrative division and population----------------------------------------- 73 3.2.2 Outline of Social economy --------------------------------------- ------------- 73 3.2.3 Public facility-------------------------- - - - _ 75 3.2.4 Urban character and development objective -------------------------------------- -------- 76 3.2.5 Present situation of urban water conservancy and development objective-- -------- ------ 80 3.2.6 Ningbo city water supply situation and planning - -- ---- -- --------- 81 3.2.7 Municipal drainage and planning ----- ---------------------- ------------ 89 3.3 General situation of quality of life - ---------------------------------------------- 92 3.4 Cultural relic protection-------------------93 3.5 People's health- ------ ----------------------------- 93 3.6 Overview of ecological enviroment-------------------- ---------------------- 93 3.6.1 Overview of Ningbo ecological environment-- -- --- 93 3.6.2 Overview of ecological environment of Yanzhou district ------------------ ----- 94 3.6.3 Investigation and evaluation for the present situation of hydrobiont in this environmental assessment 95 3.7 General situation of pollution sources -- ----- ---- 99 3.7.1 Pollution situation in the upper reaches of Jiaokou Reservoir ---- ------ 99 3.7.2 Pollution source between dam of Zhougongzhai Reservoir and Jiaokou Reservoir ---- 101 3.7.3 Pollution sources in the lower reaches of Jiaokou Reservoir--- -------- ---- 101 3.8 Present situation of regional environmental quality - … ------------------------ 102 3.8.1 Present situation of atmospheric environmental quality in the assessed area- ------- 102 3.8.2 Present situation of water environmental quality in the assessed area--------------- 103 3.8.3 Investigation and evaluation on the status of acoustic environment----------- -------- 116 4.0 Expected environmental impact and corresponding mitigation measure ------------------------

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    272 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us